[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904992":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},904992,585,2,"多选题","移民安置区环保水保设施应与安置区主体工程同时（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","批准",false,{"key":16,"text":17,"correct":18},"B","设计",true,{"key":20,"text":21,"correct":18},"C","施工",{"key":23,"text":24,"correct":18},"D","投产使用",{"key":26,"text":27,"correct":14},"E","验收","BCD","本题考查的是水土保持工程。移民安置区环保水保设施应与安置区主体工程同时设计、同时施工、同时投产使用。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]