[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904953":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},904953,585,1,"单选题","中后期水利水电枢纽施工导流一般需要由（ ）挡水或拦洪。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","坝坡",false,{"key":16,"text":17,"correct":18},"B","坝体",true,{"key":20,"text":21,"correct":14},"C","围堰",{"key":23,"text":24,"correct":14},"D","戗堤","水利水电枢纽施工过程中，中后期的施工导流往往需要由坝体挡水或拦洪。坝体能否可靠拦洪与安全度汛，将涉及工程的进度与成败。坝体拦洪度汛是整个工程施工进度中的一个控制性环节，必须慎重对待。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]