[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904906":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},904906,585,1,"单选题","重力坝坝轴线一般布置成（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","曲线",false,{"key":16,"text":17,"correct":18},"B","直线",true,{"key":20,"text":21,"correct":14},"C","折线",{"key":23,"text":24,"correct":14},"D","抛物线","重力坝总体布置应根据地形地质条件，结合枢纽其他建筑物综合考虑。坝轴线一般布置成直线，地形和地质条件不允许的，也可布置成折线或曲线。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]