[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904847":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},904847,585,1,"单选题","关于原料开采及加工工程工程量清单项目的工程量计算规则，下列说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","黏性土料按施工组织文件要求的有效成品料体积计量",true,{"key":16,"text":17,"correct":18},"B","天然砂石料、人工砂石料，按设计文件要求的有效成品料重量（体积）计量",false,{"key":20,"text":21,"correct":18},"C","地面和弃料场的整治费用，按设计文件要求计算",{"key":23,"text":24,"correct":18},"D","混凝土半成品料按设计文件要求的混凝土拌和系统出机口的混凝土体积计量","原料开采及加工工程工程量清单项目的工程量计算规则：①黏性土料按设计文件要求的有效成品料体积计量。②天然砂石料、人工砂石料，按设计文件要求的有效成品料重量（体积）计量。③采挖、堆料区域的边坡、地面和弃料场的整治费用，按设计文件要求计算。④混凝土半成品料按设计文件要求的混凝土拌和系统出机口的混凝土体积计量。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]