[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904844":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},904844,585,1,"单选题","同时为疏浚工程和吹填工程的工程量计算常用方法的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","平均水深法",false,{"key":16,"text":17,"correct":18},"B","平均断面法",true,{"key":20,"text":21,"correct":14},"C","格网法",{"key":23,"text":24,"correct":14},"D","产量计计算法","疏浚与吹填工程工程量计算常用方法包括平均断面法、平均水深法、格网法、产量计计算法。平均断面法先根据实测挖槽或吹填横断面图求取断面面积，进而求得相邻两断面面积的平均值，再用该平均值乘以其断面间距，即得相邻两断面间的土方量，累加各断面间的土方量即为疏浚或吹填工程的总工程量。用该法在进行断面面积计算时，每一断面均应计算两次，【彩蛋】压卷，金考典软件考前更新，下载链接 www.jinkaodian.com 且其计算值误差不应大于5%，在疏浚与吹填工程中常用。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]