[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904840":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},904840,585,1,"单选题","下列不属于为满足施工需要而增加的附加量的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","存放工具需要增加的工程量",false,{"key":16,"text":17,"correct":14},"B","设置临时的排水沟",{"key":19,"text":20,"correct":14},"C","为开挖创造条件而开挖的工作平台",{"key":22,"text":23,"correct":24},"D","因设计方案更新而增加的工程量",true,"为满足施工需要，必须额外增加的工作量，称为附加量。主要包括以下几种：①因洞井开挖断面小，运输不方便，需部分扩大洞井尺寸而增加的错车道工程量；②在放炮时，施工人员及设备需要躲藏的地方而增加的工程量；③存放工具需要增加的工程量；④因隧洞照明，需要存放照明设备而扩大断面增加的工程量；⑤设置临时的排水沟；⑥为开挖创造条件而开挖的工作平台；⑦为交通方便而开挖的零星施工便道。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]