[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904828":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},904828,585,1,"单选题","工程量计算的顺序一般有独立建筑物的计算顺序和（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","单项工程计算顺序",false,{"key":16,"text":17,"correct":14},"B","按施工顺序计算",{"key":19,"text":20,"correct":21},"C","单个分项工程计算顺序",true,{"key":23,"text":24,"correct":14},"D","图纸顺序计算","为了避免漏算或重算，提高计算的准确程度，工程计量应按照一定的顺序进行。 具体的计算顺序应根据具体工程和个人习惯来确定，一般有以下几种顺序： ①独立建筑物的计算顺序； ②单个分项工程计算顺序。 B项属于独立建筑物的计算顺序的内容。D项属于单个分部分项工程计算顺序的内容。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]