[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904779":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},904779,585,1,"单选题","在对灌浆的质量进行检查的过程中应注意的事项不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","灌浆检查孔的数量不少于灌浆孔总数的10%",false,{"key":16,"text":17,"correct":14},"B","一个坝段内，至少应布置一个检查孔",{"key":19,"text":20,"correct":21},"C","检查孔压水试验应在该部位灌浆结束7d后进行",true,{"key":23,"text":24,"correct":14},"D","压水试验可采用五点法","灌浆质量检查应以检查孔压水试验成果为主，结合对竣工资料和测试成果的分析，综合评定。灌浆检查孔的数量不少于灌浆孔总数的10%。一个坝段或一个单元工程内，至少应布置一个检查孔；检查孔压水试验应在该部位灌浆结束14d后进行；同时应自上而下分段卡塞进行压水试验，试验采用五点法或单点法。检查孔压水试验结束后，按技术要求进行灌浆和封孔；检查孔应采取岩芯，计算获得率并加以描述。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]