[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904383":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},904383,585,1,"单选题","下列关于变形监测说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","变形监测适用于对建筑物及其基础在施工期、分期蓄水期和运行期全过程的安全监控和安全预报",false,{"key":16,"text":17,"correct":18},"B","为准确掌握各建筑物的变形规律，分析相互间的变形关系，必须建立各自独立的基准变形监测系统",true,{"key":20,"text":21,"correct":14},"C","变形监测网在变形范围以外设立平面与高程变形基准点",{"key":23,"text":24,"correct":14},"D","水平位移监测设施由水平位移监测网、工作基点和量测方法（仪器）三部分组成。","本题考查的是安全监测主要项目。选项B错误，为准确掌握各建筑物的变形规律，分析相互间的变形关系，必须建立统一基准的变形监测系统。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]