[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904189":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},904189,585,1,"单选题","专业项目处理中，项目建议书阶段，初拟专业项目的处理方案时，应提出（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投资估算",true,{"key":16,"text":17,"correct":18},"B","设计概算",false,{"key":20,"text":21,"correct":18},"C","施工图预算",{"key":23,"text":24,"correct":18},"D","施工预算","本题考查的是专业项目。项目建议书阶段，初拟专业项目的处理方案，提出投资估算",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]