[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904184":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},904184,585,1,"单选题","水库正常蓄水位以下库区林木清理时，林木砍伐后的残留树桩不得高出地面（ ）m。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","0.1",false,{"key":16,"text":17,"correct":14},"B","0.2",{"key":19,"text":20,"correct":21},"C","0.3",true,{"key":23,"text":24,"correct":14},"D","0.5","本题考查的是水库库底清理。林木砍伐后的残留树桩不得高出地面0.3m。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（水利）","建筑工程",0]