[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":67},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,30,50,1453,[13,38,52],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},904160,2,"多选题","公路工程设计阶段按项目大小和技术复杂程度可以分为（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","一阶段",true,{"key":24,"text":25,"correct":22},"B","两阶段",{"key":27,"text":28,"correct":22},"C","三阶段",{"key":30,"text":31,"correct":32},"D","四阶段",false,{"key":34,"text":35,"correct":32},"E","五阶段","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},904161,"公路工程造价的监督内容及程序分为（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"项目建设前期",{"key":24,"text":45,"correct":22},"项目实施阶段",{"key":27,"text":47,"correct":22},"项目决算阶段",{"key":30,"text":49,"correct":32},"项目结束阶段",{"key":34,"text":51,"correct":32},"项目监督阶段",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},904162,"项目建设前期造价监督应注意（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"可行性研究报告阶段投资估算监督",{"key":24,"text":59,"correct":22},"初步设计阶段编制的设计概算应根据相应的编制办法进行编制",{"key":27,"text":61,"correct":22},"施工图预算应控制在批准的初步设计概算范围内",{"key":30,"text":63,"correct":22},"招标工程应确定合理的招标控制价",{"key":34,"text":65,"correct":32},"设计变更原因及费用变更情况","ABCD",[68,72,75,78,81,84],{"id":69,"name":70,"category":7,"favorite":71},1,"领导干部任职前廉政法规知识测试题",92,{"id":73,"name":74,"category":7,"favorite":69},595,"建筑结构与设备",{"id":76,"name":77,"category":7,"favorite":69},715,"招标采购专业知识与法律法规",{"id":79,"name":80,"category":7,"favorite":69},848,"市政方向-通用基础",{"id":82,"name":83,"category":7,"favorite":8},534,"BIM工程师",{"id":85,"name":83,"category":7,"favorite":8},535]