[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,27,50,1453,[13,38,53,68,83,98,113,128,143,158,173,187,202,216,230,245,259,274,288,302,316,330,345,359,373,387,401,415,430,444,459,473,488,502,511,525,539,553,567,582,596,610,619,634,648,663,677,691,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},904009,2,"多选题","下列关于护筒埋设要求说法正确的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","护筒竖直向倾斜度不大于1%",true,{"key":24,"text":25,"correct":26},"B","护筒内径一般应大于桩径至少100mm",false,{"key":28,"text":29,"correct":22},"C","潮汐影响水域应高出施工期最高潮水1.5～2m",{"key":31,"text":32,"correct":26},"D","有冲刷的河床宜沉入局部冲刷线以下1.5～2m",{"key":34,"text":35,"correct":26},"E","护筒中心与桩中心平面位置偏差应不大于100mm","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},904010,"下列关于钻孔灌注桩施工说法错误的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"护筒埋置深度在旱地宜为2～4m",{"key":24,"text":45,"correct":26},"首批混凝土入孔后，应连续灌注，不得中断",{"key":28,"text":47,"correct":22},"钢筋笼外侧控制保护层厚度的垫块竖向间距为2.5m",{"key":31,"text":49,"correct":22},"冲击钻进过程中孔内水位应高于护筒底口100mm以上",{"key":34,"text":51,"correct":22},"水下混凝土的灌注时间不得超过首批混凝土的终凝时间","CDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},904011,"下列关于桩基和承台施工说法正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"桩头预留钢筋上的泥土及鳞锈等应清理干净",{"key":24,"text":60,"correct":22},"承台基地为软弱土层时，应按设计要求采取措施",{"key":28,"text":62,"correct":22},"承台施工前，应进行桩基等隐蔽工程的质量验收",{"key":31,"text":64,"correct":22},"沉桩施工方法主要有锤击沉桩、振动沉桩、射水沉桩",{"key":34,"text":66,"correct":26},"挖孔灌注桩孔口处应设置高出地面至少200mm的护圈","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},904012,"下列关于地下连续墙施工说法正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"钢筋骨筋的接长宜采用绑扎连接",{"key":24,"text":75,"correct":26},"成槽方法仅有钻劈法、钻抓法、铣削法",{"key":28,"text":77,"correct":22},"槽段接头宜采用预埋钢筋钢板、设置剪力键等",{"key":31,"text":79,"correct":26},"单元槽段长度小于4m时，可采用2根导管灌注",{"key":34,"text":81,"correct":22},"单元槽段长度超过4m时，可采用2根导管灌注","CE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},904013,"悬索桥是利用主缆和吊索作为加劲梁的悬吊体系，将荷载作用传递到索塔和锚碇的桥梁，其施工步骤包括（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"桥面系施工",{"key":24,"text":90,"correct":26},"斜拉索安装",{"key":28,"text":92,"correct":22},"上部结构安装",{"key":31,"text":94,"correct":22},"索塔、锚碇施工",{"key":34,"text":96,"correct":22},"索塔、锚碇基础施工","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},904014,"锚碇是悬索桥的主要承重构件，主要抵抗来自主缆的拉力，并传递给基地基础，下列关于锚碇的说法不正确的有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"岩锚预应力筋分散锚固",{"key":24,"text":105,"correct":22},"隧道锚节省混凝土锚体材料",{"key":28,"text":107,"correct":22},"岩锚借助基岩抵抗主缆拉力",{"key":31,"text":109,"correct":26},"岩锚通过锚固钢绞线直接锚固于岩体",{"key":34,"text":111,"correct":22},"隧道锚依靠自身的重力抵抗主缆拉力","BCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},904015,"索塔一般由基础、塔柱、横梁等组成，下列关于索塔施工的说法正确的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"索鞍安装时应严格掌握顶推量",{"key":24,"text":120,"correct":26},"索鞍安装应选择在夜晚时连续完成工作",{"key":28,"text":122,"correct":26},"混凝土塔施工可采用浮吊、塔吊等架设方法",{"key":31,"text":124,"correct":22},"塔顶钢框架必须在索塔上系梁施工完毕后安装",{"key":34,"text":126,"correct":22},"小跨径单缆悬索桥中可以采用独柱式或菱形索塔","ADE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},904016,"下列关于主缆架设和紧缆的说法正确的有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":26},"PPWS法设备一次性投资较大",{"key":24,"text":135,"correct":26},"正式紧缆应在温度稳定的夜间进行",{"key":28,"text":137,"correct":26},"AS法制缆的质量相对PPWS法好些",{"key":31,"text":139,"correct":22},"PPWS法对牵引系统所需动力要求较大",{"key":34,"text":141,"correct":22},"AS法可以编成较大的索股，锚头数量较少","DE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},904017,"防眩设施施工时，首先要保证（ ）的要求。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"遮光角",{"key":24,"text":150,"correct":26},"立柱间隔",{"key":28,"text":152,"correct":26},"密实度",{"key":31,"text":154,"correct":22},"防眩高度",{"key":34,"text":156,"correct":26},"网孔尺寸","AD",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},904018,"桥梁护栏按构造特征，桥梁护栏可分为（ ）。",[162,164,166,168,170],{"key":20,"text":163,"correct":22},"梁柱式",{"key":24,"text":165,"correct":26},"波形钢板护栏",{"key":28,"text":167,"correct":22},"钢筋混凝土墙式",{"key":31,"text":169,"correct":26},"缆索护栏",{"key":34,"text":171,"correct":22},"组合式","ACE",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":67,"analysis":37},904019,"通信设备敷设电源线说法正确的是（ ）。",[177,179,181,183,185],{"key":20,"text":178,"correct":22},"交、直流电源的馈电电缆必须分开布设，电源电缆、信号电缆、用户电缆应分离布放，避免在同一线束内",{"key":24,"text":180,"correct":22},"电源线的规格、熔丝的容量均应符合设计要求",{"key":28,"text":182,"correct":22},"电源线必须用整段线料，外皮完整，中间严禁有接头",{"key":31,"text":184,"correct":22},"采用胶皮绝缘线做直流馈电线时，每对馈电线应保持平行，正负线两端应有统一的红蓝标志",{"key":34,"text":186,"correct":26},"截面在10mm2以下的单芯或多芯电源线严禁与设备直接连接",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},904020,"下列关于光、电缆敷设说法正确的是（ ）。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"敷设光缆时的牵引力应符合设计要求，在一般情况下不宜超过2000kN",{"key":24,"text":194,"correct":22},"敷设电缆时的牵引力应小于电缆允许拉力的80%",{"key":28,"text":196,"correct":26},"敷设管道光、电缆时应以有机油脂作为润滑剂",{"key":31,"text":198,"correct":22},"以人工方法牵引光缆时，应在井下逐段接力牵引，一次牵引长度一般不大于1000m",{"key":34,"text":200,"correct":26},"光缆绕“8”字敷设时其内径应不大于2m","ABD",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":127,"analysis":37},904021,"下列关于监控设备安装的要求说法正确的是（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"设备开箱检查必须由业主、承包方和监理方共同参加",{"key":24,"text":209,"correct":26},"设备应按设计位置交叉排列，方向正确，位置合理",{"key":28,"text":211,"correct":26},"室内布缆、布线应在防静电地板下各种电缆应同槽布设",{"key":31,"text":213,"correct":22},"对有静电要求的设备，开箱检查、安装、插接件的插拔时，必须穿防静电服或带防护腕",{"key":34,"text":215,"correct":22},"设备调试，应先进行通电试验，然后测试相关的技术指标及调试软件",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":201,"analysis":37},904022,"下列关于波形钢护栏的说法错误的有（ ）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"Am级和Sm级用于路侧护栏",{"key":24,"text":223,"correct":22},"加强型护栏的中心间距为4m",{"key":28,"text":225,"correct":26},"波形梁通过拼接螺栓相互拼接",{"key":31,"text":227,"correct":22},"波形梁顶面应与道路平曲线相协调",{"key":34,"text":229,"correct":26},"护栏板的搭接方向与行车方向相同",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},904023,"下列关于敷设电源线要求说法正确的有（ ）。",[234,236,238,240,242],{"key":20,"text":235,"correct":26},"交、直流电源的馈电电缆宜分开布设",{"key":24,"text":237,"correct":26},"电源电缆和用户电缆应放置在同一线束",{"key":28,"text":239,"correct":22},"电源线的熔丝容量均应符合设计要求",{"key":31,"text":241,"correct":22},"截面在10mm2以上的多股电源线应加装接线端子",{"key":34,"text":243,"correct":26},"截面在10mm2以下的多芯电源线应加装接线端子","CD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":157,"analysis":37},904024,"下列关于高低压开关柜、配电箱（盘）的安装要求说法正确的有（ ）。 A.柜、盘、箱的金属柜架及基础型钢必须接地（P",[249,251,253,255,257],{"key":20,"text":250,"correct":22},"或接零（PEN）可靠",{"key":24,"text":252,"correct":26},"基础型钢安装直线度和水平度全长应大于5mm",{"key":28,"text":254,"correct":26},"线对地间绝缘电阻值，馈电线路必须大于1MΩ",{"key":31,"text":256,"correct":22},"照明配电板底边距地面不小于1.8m",{"key":34,"text":258,"correct":26},"当S在35～400mm2时，导体最小截面积应小于S\u002F2",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},904025,"下列关于车道计算机系统设备的施工技术要求说法正确的有（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"出、入口车道设备数量、型号规格符合设计要求",{"key":24,"text":266,"correct":22},"计重秤台应埋设在一个板块的中心",{"key":28,"text":268,"correct":26},"ETC车道前方5km处应设置预告标志",{"key":31,"text":270,"correct":26},"埋设计数线圈的位置应设有接缝",{"key":34,"text":272,"correct":22},"安装后其平整度应符合车道平整度要求","ABE",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":273,"analysis":37},904026,"下列关于隔离栅和防落网施工的说法正确的有（ ）。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"护网防雷接地电阻值应小于10Ω",{"key":24,"text":281,"correct":22},"隔离栅的立柱埋设应分段进行",{"key":28,"text":283,"correct":26},"立柱横向应线形顺畅不得参差不齐",{"key":31,"text":285,"correct":26},"隔离栅网片应从立柱中部开始安装",{"key":34,"text":287,"correct":22},"防落网安装前应检查桥梁上的预埋件",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":201,"analysis":37},904027,"下列关于防眩设施和视线诱导设施施工的说法正确的有（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":22},"防眩板的间距必须符合图纸规定",{"key":24,"text":295,"correct":22},"防眩板整体上应高低一致、线形顺畅",{"key":28,"text":297,"correct":26},"不同类型的视线诱导设施安装高度应一致",{"key":31,"text":299,"correct":22},"防眩板施工不得损坏中央分隔带上其他设施",{"key":34,"text":301,"correct":26},"波形梁护栏设置诱导标应注意对路肩石的保护",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":36,"analysis":37},904028,"下列关于监控设施施工的说法错误的有（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"室内布缆、布线应在防静电地板交叉排列",{"key":24,"text":309,"correct":26},"重点检查电源线、地线等配线正确无误后方可通电",{"key":28,"text":311,"correct":22},"基础的接地电阻必须小于或等于10Ω",{"key":31,"text":313,"correct":26},"基础采用明挖法施工，顶面预埋钢地脚螺栓",{"key":34,"text":315,"correct":26},"有静电要求设备开箱检查时必须穿防静电服或带防护腕",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":172,"analysis":37},904029,"下列关于收费设施的设计原则说法正确的有（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":22},"与道路其他设施相协调",{"key":24,"text":323,"correct":26},"不利于防止收费作弊",{"key":28,"text":325,"correct":22},"尽量减少对道路的交通干扰",{"key":31,"text":327,"correct":26},"尽量使用国外引入的设备",{"key":34,"text":329,"correct":22},"多方案设计优化比选、分期实施",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":344,"analysis":37},904030,"下列关于收费视频监视设施的设备施工技术要求说法正确的有（ ）。",[334,336,338,340,342],{"key":20,"text":335,"correct":22},"机箱及地脚螺栓规格符合设计要求",{"key":24,"text":337,"correct":26},"车道至收费站内的传输线允许有中间接头",{"key":28,"text":339,"correct":22},"电源及视频传输线路按规范要求连接到位",{"key":31,"text":341,"correct":22},"防腐措施得当，裸露金属基体无锈蚀",{"key":34,"text":343,"correct":26},"设备基础混凝土表面有损边、无掉角","ACD",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":201,"analysis":37},904031,"下列关于光电缆敷设的要求说法正确的有（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"光、电缆端头应做密封防潮处理",{"key":24,"text":352,"correct":22},"敷设后的光、电缆应紧靠入孔壁",{"key":28,"text":354,"correct":26},"绕“8”字敷设时其内径应不小于1.5m",{"key":31,"text":356,"correct":22},"电缆的曲率半径必须大于电缆直径的15倍",{"key":34,"text":358,"correct":26},"孔径≤90mm的标准管内一次性穿放子管数量不小于3",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":273,"analysis":37},904032,"下列关于光缆接续要求说法正确的有（ ）。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"接续前根据预留要求留足光缆长度",{"key":24,"text":366,"correct":22},"核对光纤、铜导线并编号作永久标记",{"key":28,"text":368,"correct":26},"纤盘的接头部位平直受力",{"key":31,"text":370,"correct":26},"增强保护可采用热可缩管法、套管法和W形槽法",{"key":34,"text":372,"correct":22},"接续完成后余纤盘在光纤盘片内，盘绕方向应一致",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":82,"analysis":37},904033,"下列关于电缆芯线接续要求说法正确的有（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":26},"检查合格前即可进行电缆接续",{"key":24,"text":380,"correct":26},"接续后应保证电缆的标称对数大部分合格",{"key":28,"text":382,"correct":22},"配线电缆芯线绝缘电阻合格",{"key":31,"text":384,"correct":26},"配线电缆排列整齐，线束交叉，接头呈椭圆形",{"key":34,"text":386,"correct":22},"电缆接续前检查不符合规定者应及时返修",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":97,"analysis":37},904034,"交通安全设施除包括交通标志、交通标线、隔离栅、护栏和栏杆外，还包括（ ）等。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"防落网",{"key":24,"text":394,"correct":26},"遥控摄像机",{"key":28,"text":396,"correct":22},"防眩设施",{"key":31,"text":398,"correct":22},"防风栅",{"key":34,"text":400,"correct":22},"防雪栅",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":201,"analysis":37},904035,"下列关于交通标志的施工要求说法正确的有（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"开始加工前应根据实际情况对图纸进行复核",{"key":24,"text":408,"correct":22},"浇筑标志基础前应对标志设置位置逐个核对",{"key":28,"text":410,"correct":26},"架设标志时面板允许出现过度偏转或后仰",{"key":31,"text":412,"correct":22},"加工支撑结构时应保证钻孔在钢材镀锌之前完成",{"key":34,"text":414,"correct":26},"悬臂式标志应注意控制内边缘至土路肩边缘的距离",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":429,"analysis":37},904036,"下列关于交通标线和突起路标的施工要求说法正确的有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"路面标线有反光要求时应在涂料中掺入玻璃珠",{"key":24,"text":422,"correct":22},"具备逆反射性能的为A类突起路标",{"key":28,"text":424,"correct":22},"划线时通过划线车行驶速度控制标线厚度",{"key":31,"text":426,"correct":26},"突起路标施工时环氧树脂的涂覆厚度约为10mm",{"key":34,"text":428,"correct":26},"水泥混凝土路面设置突起路标时先用硬刷和8%盐酸溶液洗刷表面","ABC",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":82,"analysis":37},904037,"钢筋混凝土护栏通常简称为混凝土护栏，一般只用于高速和一级公路。下列关于混凝土护栏的施工要求说法错误的有（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":26},"预制施工时，预制场地应平整坚实",{"key":24,"text":437,"correct":26},"混凝土护栏块应采用钢模板预制",{"key":28,"text":439,"correct":22},"曲线路段，应使护栏与公路线形协调",{"key":31,"text":441,"correct":26},"现浇施工时钢筋及预埋件检查合格后方可浇筑",{"key":34,"text":443,"correct":22},"多节护栏构件的混凝土必须一次浇筑完成",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":458,"analysis":37},904038,"下列关于电缆成端要求说法正确的有（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":26},"电缆引下转角的曲率半径应符合规定",{"key":24,"text":451,"correct":22},"电缆引上转角的曲率半径应符合规定",{"key":28,"text":453,"correct":26},"进局电缆在托架上应交叉摆放",{"key":31,"text":455,"correct":22},"成端电缆接头的芯线接续应按“一”字形",{"key":34,"text":457,"correct":22},"配线架成端电缆必须单条依次出线","BDE",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":112,"analysis":37},904039,"下列关于机架安装要求说法正确的有（ ）。",[463,465,467,469,471],{"key":20,"text":464,"correct":26},"防雷器和馈线接头应做防潮处理",{"key":24,"text":466,"correct":22},"整列机面在同一平面上无凹凸现象",{"key":28,"text":468,"correct":22},"电池体安装在铁架上时应垫缓冲胶垫",{"key":31,"text":470,"correct":26},"机架安装时相邻机架应隔开一定距离",{"key":34,"text":472,"correct":22},"机架安装位置符合施工图的平面要求",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":487,"analysis":37},904040,"下列关于布放电缆要求说法错误的有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":26},"电缆槽内电缆捆绑要牢固、松紧适度",{"key":24,"text":480,"correct":22},"机房布线及各部件连线允许有差错",{"key":28,"text":482,"correct":26},"电缆弯曲半径应大于60mm",{"key":31,"text":484,"correct":22},"芯线焊接时两端不设置明显标志",{"key":34,"text":486,"correct":26},"布放电缆的规格程式和位置应符合施工图的规定","BD",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":201,"analysis":37},904041,"下列关于接地装置要求说法正确的有（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"机房内接地线的布置可采取辐射式或平面型",{"key":24,"text":495,"correct":22},"接地引入线与接地体之间的焊缝应做防腐处理",{"key":28,"text":497,"correct":26},"有监控设施的隧道洞口接地装置的电阻应不大于4Ω",{"key":31,"text":499,"correct":22},"通信设备除做工作接地外，机壳应做保护接地",{"key":34,"text":501,"correct":26},"机房内设备均可通过安装加固螺栓与自然形成的电气接通",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":157,"analysis":37},904042,"下列关于高低压开关柜、配电箱（盘）的安装要求说法正确的有（ ）。 A.金属柜架必须接地（P",[506,507,508,509,510],{"key":20,"text":250,"correct":22},{"key":24,"text":252,"correct":26},{"key":28,"text":254,"correct":26},{"key":31,"text":256,"correct":22},{"key":34,"text":258,"correct":26},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":36,"analysis":37},904043,"下列关于配电工程钢管敷设要求说法正确的有（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"干燥场所应采用薄壁钢管",{"key":24,"text":518,"correct":26},"镀锌钢管的跨接地线连接宜采用普通接地线卡跨接",{"key":28,"text":520,"correct":22},"钢管的内壁、外壁均应做防腐处理",{"key":31,"text":522,"correct":26},"镀锌钢管和薄壁钢管应采用螺钉连接",{"key":34,"text":524,"correct":26},"明配钢管与设备连接时，管口与地面的距离宜小于200mm",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":487,"analysis":37},904044,"下列关于配电工程塑料管敷设要求说法错误的有（ ）。",[529,531,533,535,537],{"key":20,"text":530,"correct":26},"塑料管直埋于现浇混凝土敷设时其温度不宜低于－15℃",{"key":24,"text":532,"correct":22},"塑料管应敷设在易受机械损伤的场所",{"key":28,"text":534,"correct":26},"管与盒（箱）应采用插入法涂专用胶合剂连接",{"key":31,"text":536,"correct":22},"暗配时与建筑物表面距离不应小于30mm",{"key":34,"text":538,"correct":26},"采用套管连接时。套管长度宜为管外径的1.5～3倍",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":458,"analysis":37},904045,"下列关于配电工程配线要求说法正确的有（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":26},"同类照明同管管内导线总数不少于8根",{"key":24,"text":546,"correct":22},"同类照明的几个回路可穿入同一根管内",{"key":28,"text":548,"correct":26},"同一交流回路的导线应穿于不同钢管内",{"key":31,"text":550,"correct":22},"交流与直流的导线不得穿在同一根管内",{"key":34,"text":552,"correct":22},"导线的芯线应采用焊接、压板压接或套管连接",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":36,"analysis":37},904046,"下列关于配电工程要求说法正确的有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"潮湿场所和直埋于地下时应采用厚壁钢管",{"key":24,"text":560,"correct":26},"钢管不应有折扁和裂缝，管内可有铁屑及毛刺",{"key":28,"text":562,"correct":22},"同一交流回路的导线应穿于同一钢管内",{"key":31,"text":564,"correct":26},"塑料管敷设时其温度不宜低于－5℃",{"key":34,"text":566,"correct":26},"不同电压等级的导线可以穿在同一根管内",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":581,"analysis":37},904047,"下列关于照明设备安装说法正确的有（ ）。",[571,573,575,577,579],{"key":20,"text":572,"correct":26},"灯具的吊钩圆钢直径不大于6mm",{"key":24,"text":574,"correct":22},"钢管做灯杆时钢管直径不应小于10mm",{"key":28,"text":576,"correct":22},"当灯具质量大于3kg时应固定在螺栓上",{"key":31,"text":578,"correct":22},"灯具的接线盒的防水密封垫应完整",{"key":34,"text":580,"correct":26},"疏散照明及备用照明电源转换时间≤5s","BCD",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":112,"analysis":37},904048,"下列粒料类基层中，属于嵌锁型的包括（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":26},"级配碎石",{"key":24,"text":589,"correct":22},"泥结碎石",{"key":28,"text":591,"correct":22},"泥灰结碎石",{"key":31,"text":593,"correct":26},"天然砂砾",{"key":34,"text":595,"correct":22},"填隙碎石",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":97,"analysis":37},904049,"下列关于填石渗沟的说法符合施工规定的是（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":22},"渗水材料的顶面（指封闭层以下）不得低于原地下水位",{"key":24,"text":603,"correct":26},"砂宜采用粉砂、细砂，含泥量应小于2%",{"key":28,"text":605,"correct":22},"用于排除层间水时，渗沟底部应埋置在最下面的不透水层",{"key":31,"text":607,"correct":22},"在冰冻地区，渗沟埋置深度不得小于当地最小冻结深度",{"key":34,"text":609,"correct":22},"填石渗沟纵坡不宜小于1%",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":612,"answer":273,"analysis":37},904050,[613,615,616,617,618],{"key":20,"text":614,"correct":22},"出、入口车道设备数量符合设计要求",{"key":24,"text":266,"correct":22},{"key":28,"text":268,"correct":26},{"key":31,"text":270,"correct":26},{"key":34,"text":272,"correct":22},{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":633,"analysis":37},904051,"隧道地质超前预报方法主要有地质调查法和（ ）。",[623,625,627,629,631],{"key":20,"text":624,"correct":22},"物理勘探法",{"key":24,"text":626,"correct":22},"超前导坑法",{"key":28,"text":628,"correct":22},"超前钻探法",{"key":31,"text":630,"correct":26},"化学勘探法",{"key":34,"text":632,"correct":22},"水力联系观测法","ABCE",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":67,"analysis":37},904052,"石灰稳定土底基层、基层的施工中做法正确的有（ ）。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"施工气温应不低于5℃，不宜安排在雨季施工",{"key":24,"text":641,"correct":22},"在铺筑上层前，应将下层的表面拉毛，并洒水湿润",{"key":28,"text":643,"correct":22},"施工机械不宜在已压成的底基层、基层上掉头",{"key":31,"text":645,"correct":22},"碾压完成后，必须保湿养护，可采用洒水、覆盖砂或低黏性土等",{"key":34,"text":647,"correct":26},"现场拌和过程中应及时检查含水率，使其等于或略小于最佳值",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":662,"analysis":37},904053,"封层按施工类型可分为可采用拌和法或层铺法的单层式表面处置，下列关于封层的施工说法正确的有（ ）。",[652,654,656,658,660],{"key":20,"text":653,"correct":26},"下封层的厚度不宜大于6mm",{"key":24,"text":655,"correct":22},"封层施工前较宽的裂缝应清理灌缝",{"key":28,"text":657,"correct":22},"封层宜选在干燥或较热的季节施工",{"key":31,"text":659,"correct":26},"矿料级配应根据封层的目的、道路等级进行选择",{"key":34,"text":661,"correct":26},"稀浆封层两幅纵缝搭接宽度不宜超过60mm，横向接缝宜为对接缝","BC",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":172,"analysis":37},904054,"公路施工组织设计中的资源组织计划包括（ ）。",[667,669,671,673,675],{"key":20,"text":668,"correct":22},"劳动力配置计划",{"key":24,"text":670,"correct":26},"辅助材料计划",{"key":28,"text":672,"correct":22},"主要施工机具、设备计划",{"key":31,"text":674,"correct":26},"永久工程计划",{"key":34,"text":676,"correct":22},"技术组织措施计划",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":273,"analysis":37},904055,"根据隧道穿越地层的不同情况和目前隧道施工技术的发展，浅埋及软土隧道的施工方法包括（ ）。",[681,683,685,687,689],{"key":20,"text":682,"correct":22},"明挖法",{"key":24,"text":684,"correct":22},"盾构法",{"key":28,"text":686,"correct":26},"沉管法",{"key":31,"text":688,"correct":26},"新奥法",{"key":34,"text":690,"correct":22},"浅埋暗挖法",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":693,"answer":201,"analysis":37},904056,[694,695,696,698,699],{"key":20,"text":221,"correct":22},{"key":24,"text":223,"correct":22},{"key":28,"text":697,"correct":26},"护栏通过拼接螺栓相互拼接",{"key":31,"text":227,"correct":22},{"key":34,"text":229,"correct":26},{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":662,"analysis":37},904057,"常用的护栏有路基护栏、桥梁护栏、活动护栏等，下列关于护栏的说法正确的有（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":26},"中央分隔带缆索护栏有Am和Sm级",{"key":24,"text":707,"correct":22},"现浇混凝土护栏可采用湿治养护",{"key":28,"text":709,"correct":22},"插拔式活动护栏的预埋基础应在面层施工前完成",{"key":31,"text":711,"correct":26},"充填式活动护栏应在路面施工前完成安装",{"key":34,"text":713,"correct":26},"桥梁护栏按构造特征可分为梁柱式和组合式两类",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":344,"analysis":37},904058,"下列关于挖方路基施工中土质路堑施工要求的说法正确的有（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"施工遇到地下水时应采取排导措施，将水引入路基排水系统",{"key":24,"text":721,"correct":26},"路床土含水率高或为含水层时，路床填料应具有良好的隔水性能",{"key":28,"text":723,"correct":22},"可作为路基填料的土方，应分类开挖分类使用",{"key":31,"text":725,"correct":22},"土方开挖应自上而下进行，不得乱挖超挖，严禁掏底开挖",{"key":34,"text":727,"correct":26},"边沟与截水沟应从上游向下游开挖，开挖后，应及时进行防渗处理",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]