[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":743},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,26,50,1453,[13,38,53,68,82,97,112,127,142,156,171,185,200,214,229,244,259,273,288,303,318,333,347,361,375,390,405,419,433,447,461,475,489,503,517,531,545,559,573,587,601,616,631,645,659,673,687,701,715,729],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},903959,2,"多选题","隧道开挖的主要方法是钻孔爆破法，下列有关隧道开挖要求和钻爆施工的描述错误的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","严格控制超挖，尽量减少欠挖",true,{"key":24,"text":25,"correct":26},"B","预裂爆破孔的预裂缝宽度不宜小于5mm",false,{"key":28,"text":29,"correct":26},"C","爆破后对开挖面和未衬砌地段立即进行检查",{"key":31,"text":32,"correct":22},"D","辅助眼使爆破后坑道断面达到设计形状和规格",{"key":34,"text":35,"correct":22},"E","遵循“短进尺、强支护、强爆破、勤观测”原则","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},903960,"小净距隧道和连拱隧道常用于洞口地形狭窄或有特殊要求的中、短隧道，下列有关小净距隧道和连拱隧道的描述正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"侧导坑开挖决定着洞身开挖的方向",{"key":24,"text":45,"correct":22},"连拱隧道中导坑施工是隧洞开挖关键",{"key":28,"text":47,"correct":26},"小净距隧道施工宜采用微差控制爆破",{"key":31,"text":49,"correct":22},"中间岩柱的稳定与加固是小净距隧道施工关键",{"key":34,"text":51,"correct":26},"中夹岩体的稳定完整是小净距隧道开挖的关键","BD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},903961,"隧道施工过程中，当遇到软弱破碎围岩时，其自支护能力是比较弱的，经常采用的超前支护措施有超前锚杆和（ ）等。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"管棚支护",{"key":24,"text":60,"correct":26},"管桩支护",{"key":28,"text":62,"correct":22},"预注浆方法",{"key":31,"text":64,"correct":22},"超前小导管",{"key":34,"text":66,"correct":26},"超前大导管","ACD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},903962,"初期支护措施可作为开挖面临时支护，亦可作为永久衬砌的一部分。下列关于初期支护的说法正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"钢筋网应随受喷面的起伏铺设",{"key":24,"text":75,"correct":26},"钢拱架在架设后不能立即承载",{"key":28,"text":77,"correct":26},"锚杆加固成本高且工程适应性强",{"key":31,"text":79,"correct":22},"喷射混凝土支护对喷射机械要求较高",{"key":34,"text":81,"correct":22},"格栅钢架可以与喷射混凝土一起与围岩密贴",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},903963,"二次衬砌可以与初期支护共同组成复合式衬砌。下列关于二次衬砌施工的说法正确的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"仰拱应先于衬砌浇筑完成",{"key":24,"text":89,"correct":26},"浇筑仰拱从仰拱两侧向中心对称进行",{"key":28,"text":91,"correct":22},"二次衬砌必须重视模筑混凝土的抗冻性",{"key":31,"text":93,"correct":26},"隧道纵向需分段浇筑，分段长度为8～10m",{"key":34,"text":95,"correct":22},"全断面开挖隧道应尽量使用混凝土整体衬砌","ACE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},903964,"隧道施工的防、排水以“防、截、排、堵相结合，因地制宜、综合治理”为原则，下列关于隧道防排水设施的说法错误的有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"坡顶的截水沟应在洞口开挖后修建",{"key":24,"text":104,"correct":22},"洞内反坡排水时。不能采取水泵抽水",{"key":28,"text":106,"correct":22},"防水板搭接应保证防水层与喷层完全密贴",{"key":31,"text":108,"correct":26},"洞内大面积渗漏水宜采用钻孔将水引入排水沟",{"key":34,"text":110,"correct":26},"隧道施工中应根据实际情况完善防、排水措施","ABC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},903965,"下列关于通风防尘及水电施工的说法错误的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":26},"瓦斯地段应采用防爆型照明器材",{"key":24,"text":119,"correct":22},"瓦斯地段照明电压不得超过220V",{"key":28,"text":121,"correct":22},"凿岩机在钻眼时，必须先送风后送水",{"key":31,"text":123,"correct":26},"巷道式通风适用于有平行坑道的长隧道",{"key":34,"text":125,"correct":22},"防尘措施不能达到规定标准时允许采用干式凿岩","BCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},903966,"地下连续墙的槽孔施工，可采用的成槽方法有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"钻劈法",{"key":24,"text":134,"correct":26},"旋挖法",{"key":28,"text":136,"correct":22},"钻抓法",{"key":31,"text":138,"correct":22},"抓取法",{"key":34,"text":140,"correct":22},"铣削法","ACDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":111,"analysis":37},903967,"拱涵基础可采用（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"整体式基础",{"key":24,"text":149,"correct":22},"非整体式基础",{"key":28,"text":151,"correct":22},"板式基础",{"key":31,"text":153,"correct":26},"桩基础",{"key":34,"text":155,"correct":26},"垫层基础",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},903968,"海洋环境（含宽阔水域、咸水湖泊及特殊腐蚀环境地区）桥梁施工时，说法正确的是（ ）",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"海上桥梁施工在对无参照物和精度要求较低的打入桩、优先墩等测量时，应采用GPS测量方法",{"key":24,"text":163,"correct":22},"海洋环境施工应根据设计大型化、工厂化、预制安装的原则，选用大型设备、整体安装，或采取栈桥推进等变海为陆的方法施工，尽量减少海上作业时间、提高作业效率",{"key":28,"text":165,"correct":22},"海洋环境桥梁应配制具有高抗渗性、高抗裂性和高工作性的海工耐久性结构混凝土",{"key":31,"text":167,"correct":26},"用于海洋环境桥梁施工的各种钢制临时承重结构和构件，对于使用期超过24个月的，应采取必要的防腐措施，保证其使用的可靠性和安全性",{"key":34,"text":169,"correct":22},"海洋环境施工应符合环保要求，防止对海洋环境的污染","ABCE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":67,"analysis":37},903969,"后张法预应力的张拉和锚固说法正确的是（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"张拉时，在设计未规定情况下，混凝土的强度不应低于设计强度等级值的80%",{"key":24,"text":178,"correct":26},"弹性模量应不低于混凝土30天弹性模量的80%",{"key":28,"text":180,"correct":22},"预应力钢筋应整束张拉锚固",{"key":31,"text":182,"correct":22},"后张钢绞线束，每束钢绞线断丝或滑丝数不超1丝，每个断面断丝之和不超过该断面钢丝总数的1%",{"key":34,"text":184,"correct":26},"切割后预应力钢筋的外露长度不应小于50mm",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},903970,"基坑深度＞4m时，宜采用（ ）支护。",[189,191,193,195,197],{"key":20,"text":190,"correct":26},"槽钢",{"key":24,"text":192,"correct":26},"H形钢",{"key":28,"text":194,"correct":26},"工字钢",{"key":31,"text":196,"correct":22},"锁口钢板",{"key":34,"text":198,"correct":22},"锁口钢管桩围堰","DE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":67,"analysis":37},903971,"索塔完工后，须测定裸塔（ ）作为主缆线形计算调整的依据",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"倾斜度",{"key":24,"text":207,"correct":26},"中线",{"key":28,"text":209,"correct":22},"跨距",{"key":31,"text":211,"correct":22},"塔顶高程",{"key":34,"text":213,"correct":26},"塔底高程",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},903972,"下列关于大体积混凝土说法正确的是（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"大体积混凝土配合比设计时，宜选用低水化热和凝结时间长的水泥品种",{"key":24,"text":221,"correct":22},"大体积混凝土可分层、分块浇筑",{"key":28,"text":223,"correct":26},"在配合比设计时，宜提高水胶比、减少水泥用量",{"key":31,"text":225,"correct":26},"大体积混凝土浇筑宜在气温较高时进行",{"key":34,"text":227,"correct":26},"在混凝土内部通水降温时，进出水口的温差宜小于25℃","AB",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},903973,"下列关于猫道的描述说法正确的是（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"猫道是供主缆架设、紧缆、索夹安装、吊索安装以及主缆防护用的空中作业脚手架",{"key":24,"text":236,"correct":22},"猫道的线形宜与主缆空载时的线形平行",{"key":28,"text":238,"correct":22},"猫道的主要承重结构为猫道承重索",{"key":31,"text":240,"correct":22},"为了抗风稳定，一般设有抗风缆、抗风吊杆等抗风构件",{"key":34,"text":242,"correct":26},"猫道承重索的安全系数不小于2.0","ABCD",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":258,"analysis":37},903974,"下列属于桥梁现浇法的有（ ）法。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"支架",{"key":24,"text":251,"correct":22},"移动模架",{"key":28,"text":253,"correct":26},"缆索吊装",{"key":31,"text":255,"correct":22},"挂篮",{"key":34,"text":257,"correct":22},"顶推","ABDE",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":243,"analysis":37},903975,"斜拉桥主梁施工方法与梁式桥基本相同，大体分为（ ）。",[263,265,267,269,271],{"key":20,"text":264,"correct":22},"悬臂法",{"key":24,"text":266,"correct":22},"顶推法",{"key":28,"text":268,"correct":22},"转体施工法",{"key":31,"text":270,"correct":22},"支架现浇法",{"key":34,"text":272,"correct":26},"移动模架现浇",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},903976,"斜拉桥主要由（ ）构成。",[277,279,281,283,285],{"key":20,"text":278,"correct":26},"主缆",{"key":24,"text":280,"correct":26},"锚碇",{"key":28,"text":282,"correct":22},"索塔",{"key":31,"text":284,"correct":22},"主梁",{"key":34,"text":286,"correct":22},"斜拉索","CDE",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":302,"analysis":37},903977,"移动模架按底模的安拆方式分为（ ）。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"自行式",{"key":24,"text":295,"correct":26},"非自行式",{"key":28,"text":297,"correct":22},"平开合式",{"key":31,"text":299,"correct":22},"翻转式",{"key":34,"text":301,"correct":26},"复合式","CD",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":317,"analysis":37},903978,"下列关于模板、拱架和支架的设计及施工说法错误的有（ ）。",[307,309,311,313,315],{"key":20,"text":308,"correct":26},"外露面模板板面宜采用胶合板",{"key":24,"text":310,"correct":22},"模板拆除应先支先拆，后支后拆",{"key":28,"text":312,"correct":26},"拱架需验算强度、刚度及稳定性",{"key":31,"text":314,"correct":26},"模板板面应保证结构物线条流畅",{"key":34,"text":316,"correct":22},"大面积混凝土每块模板的面积宜小于10m2","BE",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":332,"analysis":37},903979,"下列关于桥墩与桥台施工说法正确的有（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"墩台养护时间不少于7天",{"key":24,"text":325,"correct":22},"钢筋施工时其分节高度不宜大于9m",{"key":28,"text":327,"correct":26},"钢筋与模板之间厚度正偏差不得大于3mm",{"key":31,"text":329,"correct":26},"轻型墩台设置沉降缝应与基础沉降缝保持垂直",{"key":34,"text":331,"correct":22},"每级混凝土浇筑前应将已浇混凝土表面凿毛处理","ABE",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":126,"analysis":37},903980,"下列关于墩台模板施工说法正确的有（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":26},"脚手架工作平台下铺木板，上挂安全网",{"key":24,"text":340,"correct":22},"模板在安装过程中应设置防倾覆措施",{"key":28,"text":342,"correct":22},"模板安装应保证高墩的垂直度满足规范的要求",{"key":31,"text":344,"correct":26},"模板分段整体吊装时根据模板高度确定分段尺寸",{"key":34,"text":346,"correct":22},"高墩施工宜采用翻转模板、爬升模板或滑升模板",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":199,"analysis":37},903981,"下列关于砌体砌筑施工说法正确的有（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":26},"片石混凝土宜用于较小体积的基础",{"key":24,"text":354,"correct":26},"浆砌块石一般用于高度小于6m的墩台身",{"key":28,"text":356,"correct":26},"浆砌片石一般用于高度大于6m的墩台身",{"key":31,"text":358,"correct":22},"第一层砌块基底为土质时可直接坐浆砌筑",{"key":34,"text":360,"correct":22},"两相邻工作段的砌筑差一般不宜超过1.2m",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":36,"analysis":37},903982,"上部结构的施工方法可分为预制拼装和现浇两大类，桥梁上部结构预制安装方法包括（ ）。",[365,367,369,371,373],{"key":20,"text":366,"correct":22},"预制梁安装",{"key":24,"text":368,"correct":26},"预制墩安装",{"key":28,"text":370,"correct":26},"预制承台安装",{"key":31,"text":372,"correct":22},"整跨箱梁预制吊装",{"key":34,"text":374,"correct":22},"预制节段式块件拼装",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":389,"analysis":37},903983,"下列关于桥梁上部结构预制拼装施工的说法正确的有（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":26},"悬臂根部的预制长度大于悬臂端部长度",{"key":24,"text":382,"correct":22},"节段式块件的悬臂拼装可采用浮吊架设法",{"key":28,"text":384,"correct":22},"扒杆吊装法适用于单件构件质量较轻的安装",{"key":31,"text":386,"correct":26},"架桥机按形式分为斜拉式和悬吊式两种类型",{"key":34,"text":388,"correct":26},"有常流水的梁板式桥梁可采用跨墩龙门安装","BC",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":404,"analysis":37},903984,"悬臂拼装法施工适用于预制场地及运吊条件好，特别是工程量大的桥梁工程。下列关于悬臂拼装法的特点说法正确的有（ ）。",[394,396,398,400,402],{"key":20,"text":395,"correct":22},"建桥周期缩短",{"key":24,"text":397,"correct":26},"悬拼法梁体收缩大",{"key":28,"text":399,"correct":26},"整体质量控制较难",{"key":31,"text":401,"correct":26},"预制梁混凝土龄期较短",{"key":34,"text":403,"correct":22},"梁体预制与下部结构施工同时进行","AE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":96,"analysis":37},903985,"下列关于固定支架法施工说法正确的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"施工中无体系转换问题",{"key":24,"text":412,"correct":26},"需要大量支架和大型起吊设备",{"key":28,"text":414,"correct":22},"梁的整体性好，施工平稳、可靠",{"key":31,"text":416,"correct":26},"适用于旱地上大跨径混凝土连续梁桥施工",{"key":34,"text":418,"correct":22},"支架形式包括满布式、柱式、梁式和梁柱式等",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":67,"analysis":37},903986,"下列关于移动模架说法正确的有（ ）。",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"按行走方式分为自行式和非自行式",{"key":24,"text":426,"correct":26},"按导梁形式分为前半跨式、前一跨式、前两跨式导梁",{"key":28,"text":428,"correct":22},"适用于20～70m跨径的多跨简支和连续梁的就地浇筑",{"key":31,"text":430,"correct":22},"主要由主梁导梁系统、模板系统、移位调整系统等组成",{"key":34,"text":432,"correct":26},"连续施工时每孔仅在（0.2～0.25）L处设一道纵向工作缝",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":36,"analysis":37},903987,"下列关于顶推法施工说法正确的有（ ）。",[437,439,441,443,445],{"key":20,"text":438,"correct":22},"桥台后方设置预制场地",{"key":24,"text":440,"correct":26},"梁体整体浇筑，整体顶推",{"key":28,"text":442,"correct":26},"顶推法不适用于斜拉桥的施工",{"key":31,"text":444,"correct":22},"钢导梁长度为跨径的0.7倍左右",{"key":34,"text":446,"correct":22},"施工方法分为单点顶推和多点顶推",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":126,"analysis":37},903988,"下列关于桥梁上部结构施工说法正确的有（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":26},"悬臂现浇法需要建立落地支架",{"key":24,"text":454,"correct":22},"悬臂拼装法适用于工期较短的工程",{"key":28,"text":456,"correct":22},"劲性骨架可作为主拱结构承重部分",{"key":31,"text":458,"correct":26},"转体法不可用于斜拉桥和刚构桥施工",{"key":34,"text":460,"correct":22},"悬臂现浇法适用于大跨径的连续梁桥施工",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":474,"analysis":37},903989,"斜拉桥索塔现浇施工的方法包括（ ）。",[465,467,469,470,472],{"key":20,"text":466,"correct":22},"翻模法",{"key":24,"text":468,"correct":22},"爬模法",{"key":28,"text":266,"correct":26},{"key":31,"text":471,"correct":22},"滑模法",{"key":34,"text":473,"correct":26},"悬臂现浇法","ABD",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":36,"analysis":37},903990,"斜拉桥的主梁结构采用混凝土结构、钢结构或者钢混组合结构，下列关于斜拉桥主梁的说法中正确的有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"按截面形式分为开口和闭口截面",{"key":24,"text":482,"correct":26},"斜拉桥的主梁跨越能力小于梁式桥",{"key":28,"text":484,"correct":26},"相比梁式桥，斜拉桥的主梁高跨比较大",{"key":31,"text":486,"correct":22},"钢混组合梁安装时不得破坏剪力连接装置",{"key":34,"text":488,"correct":22},"钢混组合梁的湿接缝采用微膨胀低收缩混凝土",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":302,"analysis":37},903991,"下列关于斜拉桥拉索施工的说法中错误的有（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":26},"拉索可在塔端或梁端单端进行张拉",{"key":24,"text":496,"correct":26},"张拉拉索时应采用专门设计制作的施工平台",{"key":28,"text":498,"correct":22},"张拉时应按索塔的顺桥向两侧对称不同步进行",{"key":31,"text":500,"correct":22},"千斤顶同步之差不得小于油表读数的最小分格",{"key":34,"text":502,"correct":26},"设计拉力不同的拉索应按设计规定的索力分级同步张拉",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":287,"analysis":37},903992,"下列关于斜拉桥施工的说法中正确的有（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":26},"斜拉桥可看作多跨弹塑性支承连续梁",{"key":24,"text":510,"correct":26},"湿接缝混凝土浇筑后的养护时间应不少于3天",{"key":28,"text":512,"correct":22},"漂浮体系斜拉桥主梁施工期间塔梁应临时固结",{"key":31,"text":514,"correct":22},"钢主梁制造完成后应在工厂进行试拼装和涂装",{"key":34,"text":516,"correct":22},"主梁合龙期间桥面上临时施工荷载应严格控制",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":126,"analysis":37},903993,"主缆施工难度大、工序多，下列关于主缆牵引系统和猫道施工的说法正确的有（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":26},"猫道承重索的安全系数不小于2.5",{"key":24,"text":524,"correct":22},"猫道是供主缆架设的空中作业脚手架",{"key":28,"text":526,"correct":22},"为抗风稳定，猫道一般设有抗风缆等构件",{"key":31,"text":528,"correct":26},"牵引系统架设时先将牵引索渡海，再架设先导索",{"key":34,"text":530,"correct":22},"猫道承重索采用钢丝绳时须进行预张拉消除其非弹性变形",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":126,"analysis":37},903994,"悬索桥的防护与涂装是一项技术性、专业性、工艺性要求很强的工程下列关于悬索桥防护涂装施工的说法正确的有（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":26},"主缆防护应在桥面铺装完成前进行",{"key":24,"text":538,"correct":22},"缠丝工作宜在二期恒载作用于主缆之后进行",{"key":28,"text":540,"correct":22},"工地焊接后应及时按防腐设计要求进行表面处理",{"key":31,"text":542,"correct":26},"工地焊接的表面补涂油漆应在表面除锈48h内进行",{"key":34,"text":544,"correct":22},"主缆防护前应临时覆盖，待对该处进行涂装及缠丝时再揭开",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":258,"analysis":37},903995,"海洋环境桥梁施工时，应注意的事项有（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"海洋环境施工应符合环保要求",{"key":24,"text":552,"correct":22},"应配制高抗渗性的海工耐久性结构混凝土",{"key":28,"text":554,"correct":26},"使用期超过24个月的构件应采取防腐措施",{"key":31,"text":556,"correct":22},"施工时尽量减少海上作业时间、提高作业效率",{"key":34,"text":558,"correct":22},"无参照物和精度要求较低的打入桩测量时应采用GPS测量",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":404,"analysis":37},903996,"下列关于圆管涵说法错误的有（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"无特殊荷载时，中心角一般采用135°",{"key":24,"text":566,"correct":26},"管涵安装的中心角与荷载及地基承载力有关",{"key":28,"text":568,"correct":26},"每节涵管应紧贴于垫层或基座使涵管受力均匀",{"key":31,"text":570,"correct":26},"管节安装应从下游开始，使接头面向上游",{"key":34,"text":572,"correct":22},"圆管涵管壁厚度与孔径大小及其管顶填土高度无关",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":302,"analysis":37},903997,"下列关于盖板涵说法错误的有（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":26},"混凝土的强度等级不宜低于C20",{"key":24,"text":580,"correct":26},"盖板涵的安装可采用扒杆等进行",{"key":28,"text":582,"correct":22},"板顶填土高度大于6.0m时要适当增加板厚",{"key":31,"text":584,"correct":22},"板的长度为净跨径加2×20cm",{"key":34,"text":586,"correct":26},"目前广泛采用的是钢筋混凝土盖板涵",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":474,"analysis":37},903998,"下列关于拱涵说法正确的有（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"拱涵对地基的承载力要求高",{"key":24,"text":594,"correct":22},"石拱涵不需耗用钢材",{"key":28,"text":596,"correct":26},"施工工艺要求较高",{"key":31,"text":598,"correct":22},"施工周期相对较长",{"key":34,"text":600,"correct":26},"木料和劳动力需求量小",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":615,"analysis":37},903999,"下列关于箱涵说法正确的有（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":26},"箱涵是一种柔性结构",{"key":24,"text":608,"correct":22},"用于穿越原有铁路的立交式通道",{"key":28,"text":610,"correct":26},"箱涵施工只能现浇，不可预制安装",{"key":31,"text":612,"correct":22},"施工前必须先检查验收下卧层地基土",{"key":34,"text":614,"correct":22},"可跨越原有乡村道路以维持交通运输","BDE",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":630,"analysis":37},904000,"下列关于波纹管涵说法正确的有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":26},"波纹管涵是一种刚性结构",{"key":24,"text":623,"correct":22},"波纹管涵具有一定的抗震能力",{"key":28,"text":625,"correct":22},"主要采用拼装施工，工期短",{"key":31,"text":627,"correct":22},"管涵两侧的回填土很关键",{"key":34,"text":629,"correct":26},"工程造价比同类跨径的桥涵洞高","BCD",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":96,"analysis":37},904001,"下列关于钢筋工程施工说法正确的有（ ）。",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"钢筋使用前表明的鳞锈应清除干净",{"key":24,"text":638,"correct":26},"钢筋绑扎连接的直径不宜小于28mm",{"key":28,"text":640,"correct":22},"钢筋外表有裂纹夹砂缺陷时不得使用",{"key":31,"text":642,"correct":26},"受力钢筋焊接或绑扎接头应设置在内力较大处",{"key":34,"text":644,"correct":22},"偏心受压构件的受压钢筋绑扎连接直径不大于32mm",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":474,"analysis":37},904002,"下列关于混凝土工程施工说法正确的有（ ）。",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"倾落超过10m时，应设置减速装置",{"key":24,"text":652,"correct":22},"集中搅拌时集料数量允许偏差为±2%",{"key":28,"text":654,"correct":26},"二次搅拌需要加水时不必添加其他材料",{"key":31,"text":656,"correct":22},"满足工艺要求的普通混凝土宜采用低坍落度",{"key":34,"text":658,"correct":26},"采用泵送时，泵送间隔时间不宜超过45min",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":126,"analysis":37},904003,"下列关于高强混凝土说法错误的有（ ）。",[663,665,667,669,671],{"key":20,"text":664,"correct":26},"外加剂应为高效减水剂或缓凝减水剂",{"key":24,"text":666,"correct":22},"水泥宜选强度等级不低于62.5的水泥",{"key":28,"text":668,"correct":22},"每立方米胶凝材料总量不宜大于500kg",{"key":31,"text":670,"correct":26},"每立方米混凝土的水泥用量不宜大于500kg",{"key":34,"text":672,"correct":22},"高强度混凝土适用C50强度等级混凝土施工",{"id":674,"libraryId":5,"type":15,"typeLabel":16,"stem":675,"options":676,"answer":96,"analysis":37},904004,"下列关于预应力混凝土施工说法错误的有（ ）。",[677,679,681,683,685],{"key":20,"text":678,"correct":22},"锚具只能满足整束张拉的要求",{"key":24,"text":680,"correct":26},"锚垫板下应有配套的局部加强钢筋",{"key":28,"text":682,"correct":22},"预应力筋的刚性管道是波纹状的金属管",{"key":31,"text":684,"correct":26},"后张构件应避免振动器碰撞预应力钢筋的管道、预埋件",{"key":34,"text":686,"correct":22},"金属波纹管宜采用镀锌扁钢带制作且壁厚不宜小于0.2mm",{"id":688,"libraryId":5,"type":15,"typeLabel":16,"stem":689,"options":690,"answer":302,"analysis":37},904005,"下列关于后张法预应力施工说法正确的有（ ）。",[691,693,695,697,699],{"key":20,"text":692,"correct":26},"预应力管道每个低点应设排水孔，最小内径为10mm",{"key":24,"text":694,"correct":26},"金属或塑料孔道横截面积不得少于预应力筋净截面积3倍",{"key":28,"text":696,"correct":22},"整体穿束时，束前端宜设置牵引头以保持预应力钢筋顺直",{"key":31,"text":698,"correct":22},"预应力钢筋张拉锚固后48h内未完成压浆的应采取防锈蚀措施",{"key":34,"text":700,"correct":26},"封锚采用与构件不等强度的混凝土并严格控制封锚后梁体长度",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":52,"analysis":37},904006,"下列关于后张法预应力张拉和锚固规定说法正确的有（ ）。",[705,707,709,711,713],{"key":20,"text":706,"correct":26},"曲线预应力钢筋必须两端同时张拉",{"key":24,"text":708,"correct":22},"锚具需长期外露时，应采取防止锈蚀的措施",{"key":28,"text":710,"correct":26},"锚固后夹片露出锚具外的高度不应大于5mm",{"key":31,"text":712,"correct":22},"后张钢绞线束每束钢绞线断丝或滑丝数不超1丝",{"key":34,"text":714,"correct":26},"设计未规定时，张拉时混凝土强度不低于设计强度等级值的75%",{"id":716,"libraryId":5,"type":15,"typeLabel":16,"stem":717,"options":718,"answer":126,"analysis":37},904007,"下列关于基坑工程施工说法正确的有（ ）。",[719,721,723,725,727],{"key":20,"text":720,"correct":26},"孔底注浆的压力不得小于0.5MPa",{"key":24,"text":722,"correct":22},"当支护结构受力过大时，应加设临时支撑",{"key":28,"text":724,"correct":22},"放坡开挖场地受到限制时应对坑壁进行支护",{"key":31,"text":726,"correct":26},"基坑坑壁采用喷射混凝土加固时，施工前不需验证",{"key":34,"text":728,"correct":22},"基坑较浅且渗水量不大时可采用竹排对坑壁进行支护",{"id":730,"libraryId":5,"type":15,"typeLabel":16,"stem":731,"options":732,"answer":630,"analysis":37},904008,"下列关于明挖扩大基础施工说法正确的有（ ）。",[733,735,737,739,741],{"key":20,"text":734,"correct":26},"孔深＞3m时，宜先注浆后插入锚杆",{"key":24,"text":736,"correct":22},"开挖过程中排水时应不对基坑的安全产生影响",{"key":28,"text":738,"correct":22},"基底超挖时应清除松动部分，并对基底进行处理",{"key":31,"text":740,"correct":22},"坑壁或边坡上有明显出水点时，应设置导管排水",{"key":34,"text":742,"correct":26},"扩大基础基底为岩石时，施工前应润湿并浇筑混凝土垫层",[744,748,751,754,757,760],{"id":745,"name":746,"category":7,"favorite":747},1,"领导干部任职前廉政法规知识测试题",92,{"id":749,"name":750,"category":7,"favorite":745},595,"建筑结构与设备",{"id":752,"name":753,"category":7,"favorite":745},715,"招标采购专业知识与法律法规",{"id":755,"name":756,"category":7,"favorite":745},848,"市政方向-通用基础",{"id":758,"name":759,"category":7,"favorite":8},534,"BIM工程师",{"id":761,"name":759,"category":7,"favorite":8},535]