[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":734},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,25,50,1453,[13,38,53,68,83,98,112,126,140,152,166,181,196,211,226,241,255,269,284,299,314,328,343,357,372,387,401,416,429,443,458,467,479,493,507,521,535,549,563,577,591,605,620,634,649,664,678,692,706,720],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},903909,2,"多选题","热拌沥青混合料的配合比设计包括（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","目标配合比设计阶段",true,{"key":24,"text":25,"correct":26},"B","目标配合比验证阶段",false,{"key":28,"text":29,"correct":22},"C","生产配合比设计阶段",{"key":31,"text":32,"correct":22},"D","生产配合比验证阶段",{"key":34,"text":35,"correct":26},"E","施工参数确定阶段","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},903910,"软土的特点是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"天然含水率高",{"key":24,"text":45,"correct":22},"孔隙比大",{"key":28,"text":47,"correct":26},"透水性好",{"key":31,"text":49,"correct":26},"压缩性低",{"key":34,"text":51,"correct":22},"抗剪强度低","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},903911,"填石路堤的填筑方法有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"竖向填筑法",{"key":24,"text":60,"correct":22},"分层压实法",{"key":28,"text":62,"correct":22},"冲击压实法",{"key":31,"text":64,"correct":22},"强力夯实法",{"key":34,"text":66,"correct":26},"纵向填筑法","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},903912,"土工布铺设于路堤底部，在路基自重作用下受拉产生抗滑力矩，提高路基稳定性。其中土工格栅，是利用格栅与土之间的（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"粘结作用",{"key":24,"text":75,"correct":22},"摩擦作用",{"key":28,"text":77,"correct":22},"格栅孔眼对土的锁定作用",{"key":31,"text":79,"correct":22},"格栅肋的被动抗阻作用",{"key":34,"text":81,"correct":26},"防水作用","BCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},903913,"土质路堤的施工规定说法正确的是（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"性质不同的填料，应水平分层、分段填筑、分层压实",{"key":24,"text":90,"correct":26},"填筑路床顶最后一层时，压实后的厚度应不小于200mm",{"key":28,"text":92,"correct":26},"对潮湿或冻融敏感性小的填料应填筑在路基下层，强度较小的填料应填筑在上层",{"key":31,"text":94,"correct":22},"不得在透水性较好的填料所填筑的路堤边坡上覆盖透水性不好的填料",{"key":34,"text":96,"correct":26},"每种填料的松铺厚度应相同","AD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":67,"analysis":37},903914,"土质路堑的施工要求说法正确的是（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"应根据地面坡度、开挖断面、纵向长度及出土方向等因素，结合土方调配，选用安全、经济的开挖方案",{"key":24,"text":105,"correct":22},"应采取临时排水措施，确保施工作业面不积水。施工遇到地下水时应采取排导措施，将水引入路基排水系统；路床土含水率高或为含水层时，应采取设置渗沟、换填、改良土质、土工织物等处理措施，路床填料应具有良好的透水性能",{"key":28,"text":107,"correct":22},"可作为路基填料的土方，应分类开挖分类使用",{"key":31,"text":109,"correct":22},"土方开挖应自上而下进行，不得乱挖超挖，严禁掏底开挖",{"key":34,"text":111,"correct":26},"开挖至零填、路堑路床部分后，应尽快进行路床施工；如不能及时施工宜在设计路床顶高程以上预留至少500mm厚的保护层",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":97,"analysis":37},903915,"下列关于加固土桩的施工说法正确的是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"加固土桩施工前必须进行成桩试验",{"key":24,"text":119,"correct":26},"制备好的浆液不得离析，超过2h的浆液应废弃",{"key":28,"text":121,"correct":26},"当钻头提升到地面以下小于300mm时，送灰器停止送灰",{"key":31,"text":123,"correct":22},"送灰器停止送灰，用同剂量的混合土回填",{"key":34,"text":125,"correct":26},"因故喷粉中断时，必须复打，复打重叠长度应大于0.5m",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":36,"analysis":37},903916,"下列关于综合爆破施工技术说法正确的是（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"用药量1t以下为中小炮，1t以上为大炮",{"key":24,"text":133,"correct":26},"钢纤炮是一种主炮型",{"key":28,"text":135,"correct":22},"深孔炮采用延长药包",{"key":31,"text":137,"correct":22},"药壶炮是小炮中最省工省药的一种工法",{"key":34,"text":139,"correct":26},"猫洞炮洞穴必须水平",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":36,"analysis":37},903917,"下列关于挖方路基施工中土质路堑施工要求的说法正确的有（ ）。",[144,146,148,149,150],{"key":20,"text":145,"correct":22},"施工遇到地下水时应采取排导措施，将水引入路基排水系统",{"key":24,"text":147,"correct":26},"路床土含水率高或为含水层时，路床填料应具有良好的隔水性能",{"key":28,"text":107,"correct":22},{"key":31,"text":109,"correct":22},{"key":34,"text":151,"correct":26},"边沟与截水沟应从上游向下游开挖，开挖后，应及时进行防渗处理",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":97,"analysis":37},903918,"用于公路路基的填料其强度要求是按CBR值确定，应通过取土试验确定填料（ ）。",[156,158,160,162,164],{"key":20,"text":157,"correct":22},"最小强度",{"key":24,"text":159,"correct":26},"级配",{"key":28,"text":161,"correct":26},"抗弯拉强度",{"key":31,"text":163,"correct":22},"最大粒径",{"key":34,"text":165,"correct":26},"最大CBR值",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":180,"analysis":37},903919,"下列关于填石渗沟的说法符合施工规定的是（ ）。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"渗水材料的顶面（指封闭层以下）不得低于原地下水位",{"key":24,"text":173,"correct":26},"砂宜采用粉砂、细砂，含泥量应小于2%",{"key":28,"text":175,"correct":22},"用于排除层间水时，渗沟底部应埋置在最下面的不透水层",{"key":31,"text":177,"correct":22},"在冰冻地区，渗沟埋置深度不得小于当地最小冻结深度",{"key":34,"text":179,"correct":22},"填石渗沟纵坡不宜小于1%","ACDE",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":195,"analysis":37},903920,"下列粒料类基层中，属于嵌锁型的包括（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":26},"级配碎石",{"key":24,"text":188,"correct":22},"泥结碎石",{"key":28,"text":190,"correct":22},"泥灰结碎石",{"key":31,"text":192,"correct":26},"天然砂砾",{"key":34,"text":194,"correct":22},"填隙碎石","BCE",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},903921,"封层按施工类型可分为可采用拌和法或层铺法的单层式表面处置，下列关于封层的施工说法正确的有（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":26},"下封层的厚度不宜大于6mm",{"key":24,"text":203,"correct":22},"封层施工前较宽的裂缝应清理灌缝",{"key":28,"text":205,"correct":22},"封层宜选在干燥或较热的季节施工",{"key":31,"text":207,"correct":26},"矿料级配应根据封层的目的、道路等级进行选择",{"key":34,"text":209,"correct":26},"稀浆封层两幅纵缝搭接宽度不宜超过60mm，横向接缝宜为对接缝","BC",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},903922,"土质路堤的施工作业要求，含（ ）的土严禁作为填料。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"生活垃圾",{"key":24,"text":218,"correct":22},"腐殖质",{"key":28,"text":220,"correct":22},"树根",{"key":31,"text":222,"correct":26},"泥炭",{"key":34,"text":224,"correct":26},"冻土","ABC",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},903923,"对现有地基的陷穴、暗穴，不可以采用（ ）等措施。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"灌砂",{"key":24,"text":233,"correct":26},"灌浆",{"key":28,"text":235,"correct":22},"拦截",{"key":31,"text":237,"correct":26},"开挖回填",{"key":34,"text":239,"correct":22},"重锤压实","CE",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":67,"analysis":37},903924,"排除滑坡地下水的设施有（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"支撑渗沟",{"key":24,"text":248,"correct":22},"边坡渗沟",{"key":28,"text":250,"correct":22},"暗沟",{"key":31,"text":252,"correct":22},"平孔",{"key":34,"text":254,"correct":26},"天沟",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":97,"analysis":37},903925,"关于路基支挡工程中的挡土墙施工的相关说法中，正确的有（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"挡土墙施工宜避开雨季，并做好截、排水及防渗设施",{"key":24,"text":262,"correct":26},"重力式挡土墙的泄水孔应在砌筑墙身之前设置，确保排水通畅",{"key":28,"text":264,"correct":26},"钢筋混凝土悬臂式挡土墙采用整体浇筑时，需分两次完成混凝土灌注",{"key":31,"text":266,"correct":22},"锚定板挡土墙具有结构轻、柔性大的特点",{"key":34,"text":268,"correct":26},"加筋土挡土墙适宜用在挖方路段或地形陡峭的山坡",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":283,"analysis":37},903926,"下列关于抗滑桩施工的相关说法符合规定的有（ ）。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"抗滑桩应分节开挖，挖一节立即支护一节",{"key":24,"text":276,"correct":22},"抗滑桩的开挖应在上一节护壁混凝土终凝后进行",{"key":28,"text":278,"correct":26},"抗滑桩的开挖桩群应从两端沿滑坡主轴连续开挖",{"key":31,"text":280,"correct":22},"桩身混凝土的灌注必须连续进行",{"key":34,"text":282,"correct":22},"桩板式抗滑挡墙压实墙背填土时不得直接碾压锚索","ABDE",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},903927,"下面适用于各级公路的基层和底基层的是（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"水泥稳定碎石",{"key":24,"text":291,"correct":26},"石灰稳定土",{"key":28,"text":293,"correct":22},"水泥稳定土",{"key":31,"text":295,"correct":26},"石灰粉煤灰土",{"key":34,"text":297,"correct":22},"石灰粉煤灰碎石","ACE",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},903928,"下列关于透层和黏层的施工说法错误的有（ ）。",[303,305,307,309,311],{"key":20,"text":304,"correct":26},"在铺筑沥青层前1～2天，一次均匀洒布透层",{"key":24,"text":306,"correct":22},"采用乳化沥青作透层时，洒布后应尽早铺筑面层",{"key":28,"text":308,"correct":26},"黏层宜在当天洒布完成，喷洒后严禁车辆行人通过",{"key":31,"text":310,"correct":26},"黏层油的品种和规格应根据下卧层的类型通过试洒确定",{"key":34,"text":312,"correct":22},"喷洒表面应保持干燥，当气温低于5℃或路面潮湿时严禁喷洒","BE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":52,"analysis":37},903929,"下列关于热拌沥青混合料路面的施工工艺说法正确的有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"表面温度低于50℃后方可开放交通",{"key":24,"text":321,"correct":22},"沥青的加热温度控制在150～170℃",{"key":28,"text":323,"correct":26},"低于规定铺筑温度混合料应二次加热后使用",{"key":31,"text":325,"correct":26},"出现离析、边角缺料等现象时应减小摊铺机速度",{"key":34,"text":327,"correct":22},"采用雾状喷水法，可保证沥青混合料碾压过程中不粘轮",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},903930,"下列关于热拌沥青混合料路面的接缝处理说法正确的有（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":26},"后摊铺部分完成留下20～30cm宽暂不碾压",{"key":24,"text":335,"correct":22},"半幅施工不能采用热接缝时，采用人工顺直刨缝或切缝",{"key":28,"text":337,"correct":26},"横接缝端部平整度不符合要求时，平行于路中线切齐清除",{"key":31,"text":339,"correct":22},"横向接缝的碾压先用双轮双振压路机进行横压，再改为纵向碾压",{"key":34,"text":341,"correct":22},"纵向冷接缝上、下层的缝错开15cm以上，横向接缝错开1m以上","BDE",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":298,"analysis":37},903931,"下列关于改性沥青混合料路面的说法错误的有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"改性沥青混合料储存时间不应超过48h",{"key":24,"text":350,"correct":26},"铺筑改性沥青及SMA路面时宜采用非接触式平衡梁",{"key":28,"text":352,"correct":22},"SMA混合料的拌和应严格控制拌和温度不得超过200℃",{"key":31,"text":354,"correct":26},"摊铺过程中出现异常且调节无效时，应立即停机查明原因",{"key":34,"text":356,"correct":22},"如果在指定温度内还未压实，为防止推移破坏，应改用钢轮碾碾压",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":371,"analysis":37},903932,"下列关于水泥混凝土路面施工的说法错误的有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"振捣棒的持续时间不宜过振，也不宜少于60s",{"key":24,"text":364,"correct":26},"布料机与滑模摊铺机之间施工距离宜控制在5～10m",{"key":28,"text":366,"correct":26},"高速公路宜选用能一次摊铺2～3个车道宽度的滑模摊铺机",{"key":31,"text":368,"correct":22},"中、轻交通的混凝土路面上，横向缩缝可采用假缝加传力杆型",{"key":34,"text":370,"correct":22},"填缝料应与混凝土缝壁黏附紧密，其灌注深度宜为缝宽的1.5倍","ADE",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":386,"analysis":37},903933,"下列关于路面工程的说法错误的有（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"混凝土板达到设计强度30%后，行人方可通行",{"key":24,"text":379,"correct":26},"沥青混合料的机械摊铺松铺系数为1.15～1.30",{"key":28,"text":381,"correct":22},"改性沥青混合料一般应在温度降至100℃前结束碾压作业",{"key":31,"text":383,"correct":26},"黏层所使用的基层基质沥青等级宜与主层沥青混合料相同",{"key":34,"text":385,"correct":26},"路面结构层自下而上依次为：垫层、底基层、基层、面层","AC",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":225,"analysis":37},903934,"综合爆破施工技术对钢钎炮爆破方法的炮眼直径进行调查，下列数据符合规定的有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"55mm",{"key":24,"text":394,"correct":22},"60mm",{"key":28,"text":396,"correct":22},"65mm",{"key":31,"text":398,"correct":26},"75mm",{"key":34,"text":400,"correct":26},"80mm",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},903935,"综合爆破中的洞室炮主要包括（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":26},"钢钎炮",{"key":24,"text":408,"correct":26},"深孔爆破",{"key":28,"text":410,"correct":22},"药壶炮",{"key":31,"text":412,"correct":22},"猫洞炮",{"key":34,"text":414,"correct":26},"小炮","CD",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":342,"analysis":37},903936,"下列属于石质路堑开挖常用爆破方法的有（ ）。",[420,422,424,425,427],{"key":20,"text":421,"correct":26},"药壶爆破",{"key":24,"text":423,"correct":22},"预裂爆破",{"key":28,"text":408,"correct":26},{"key":31,"text":426,"correct":22},"微差爆破",{"key":34,"text":428,"correct":22},"洞室爆破",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":342,"analysis":37},903937,"采用细粒土直接作路基填料时，应满足以下具体要求的有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":26},"液限小于60%",{"key":24,"text":436,"correct":22},"液限小于50%",{"key":28,"text":438,"correct":26},"塑性指数小于30",{"key":31,"text":440,"correct":22},"塑性指数小于26",{"key":34,"text":442,"correct":22},"含水量适宜直接压实",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":457,"analysis":37},903938,"填石路堤施工前，通过修筑试验路段来确定的路堤施工的相应孔隙率标准的参数有（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"松铺厚度",{"key":24,"text":450,"correct":22},"压实机械型号及组合",{"key":28,"text":452,"correct":26},"整平机械型号及整平速度",{"key":31,"text":454,"correct":22},"压实速度及压实遍数",{"key":34,"text":456,"correct":26},"孔隙率","ABD",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":225,"analysis":37},903939,"含有下列哪种物质的土壤严禁作为土质路堤的填料？（ ）",[462,463,464,465,466],{"key":20,"text":216,"correct":22},{"key":24,"text":218,"correct":22},{"key":28,"text":220,"correct":22},{"key":31,"text":222,"correct":26},{"key":34,"text":224,"correct":26},{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":180,"analysis":37},903940,"下列属于填石路堤的填筑方法的有（ ）。",[471,473,475,477,478],{"key":20,"text":472,"correct":22},"倾填法",{"key":24,"text":474,"correct":26},"横向填筑法",{"key":28,"text":476,"correct":22},"碾压法",{"key":31,"text":62,"correct":22},{"key":34,"text":64,"correct":22},{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":52,"analysis":37},903941,"下列关于膨胀土路基施工的说法正确的有（ ）。",[483,485,487,489,491],{"key":20,"text":484,"correct":22},"膨胀土地区路基施工，应避开雨季作业，加强现场排水",{"key":24,"text":486,"correct":22},"强膨胀土不得作为路堤填料",{"key":28,"text":488,"correct":26},"胀缩总率超过0.7%的弱膨胀土可直接填筑",{"key":31,"text":490,"correct":26},"膨胀土地区路堑施工中，边坡要一次挖到设计线",{"key":34,"text":492,"correct":22},"填筑膨胀土路堤时，应及时对路堤边坡及顶面进行防护",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":82,"analysis":37},903942,"下列符合湿陷性黄土路基施工规定的有（ ）。",[497,499,501,503,505],{"key":20,"text":498,"correct":26},"路床填料必须使用老黄土",{"key":24,"text":500,"correct":22},"浸水路堤不得用黄土填筑",{"key":28,"text":502,"correct":22},"路堑施工前，应做好堑顶地表排水导流工程",{"key":31,"text":504,"correct":22},"陷穴表面的防渗处理层厚度不宜小于300mm",{"key":34,"text":506,"correct":26},"挖方边坡顶以外倾向路基的陷穴应作适当处理，如串珠状陷穴",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":386,"analysis":37},903943,"下列关于中央分隔带及路肩施工的说法错误的有（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"高等级公路多采用砂石料作为反滤层",{"key":24,"text":514,"correct":26},"在路肩上，每隔5～10m应交错开挖临时泄水沟",{"key":28,"text":516,"correct":22},"中央分隔带开挖时，先挖纵向肓沟，后挖集水槽",{"key":31,"text":518,"correct":26},"碎石盲沟上铺设土工布有利于排水并可保持肓沟长期利用",{"key":34,"text":520,"correct":26},"横向塑料排水管的进口必须用土工布包裹，防止碎石堵塞",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":180,"analysis":37},903944,"二次衬砌的应在初期支护变形基本稳定后进行，施作时间应满足的条件有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"各测试项目所显示的位移率明显减缓并已基本稳定",{"key":24,"text":528,"correct":26},"防排水措施已全部施做完毕",{"key":28,"text":530,"correct":22},"已产生的各项位移已达预计位移量的80%～90%",{"key":31,"text":532,"correct":22},"周边位移速率小于0.1～0.2mm\u002F天",{"key":34,"text":534,"correct":22},"拱顶下沉速率小于0.07～0.15mm\u002F天",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":82,"analysis":37},903945,"复合式衬砌隧道的必测项目有（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":26},"围岩体内位移",{"key":24,"text":542,"correct":22},"地表下沉",{"key":28,"text":544,"correct":22},"周边位移",{"key":31,"text":546,"correct":22},"拱顶下沉",{"key":34,"text":548,"correct":26},"锚杆轴力及抗拔力",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":36,"analysis":37},903946,"山岭隧道的支护方法有（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"传统矿山法",{"key":24,"text":556,"correct":26},"盾构法",{"key":28,"text":558,"correct":22},"新奥法",{"key":31,"text":560,"correct":22},"掘进机法",{"key":34,"text":562,"correct":26},"浅埋暗挖法",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":283,"analysis":37},903947,"隧道加固锚杆按照锚固形式可划分为（ ）。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"全长黏结型",{"key":24,"text":570,"correct":22},"端头锚固型",{"key":28,"text":572,"correct":26},"全长锚固型",{"key":31,"text":574,"correct":22},"摩擦型",{"key":34,"text":576,"correct":22},"预应力型",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":283,"analysis":37},903948,"隧道开挖应遵循（ ）的原则进行开挖掘进。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"短进尺",{"key":24,"text":584,"correct":22},"强支护",{"key":28,"text":586,"correct":26},"快支护",{"key":31,"text":588,"correct":22},"弱爆破",{"key":34,"text":590,"correct":22},"勤观测",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":298,"analysis":37},903949,"小净距隧道施工中间岩柱的稳定与加固是整个小净距隧道施工的关键，VI～IV级围岩段可采用（ ）等预加固措施。",[595,597,599,601,603],{"key":20,"text":596,"correct":22},"超前小导管预注浆",{"key":24,"text":598,"correct":26},"管棚",{"key":28,"text":600,"correct":22},"水平贯通预应力锚杆",{"key":31,"text":602,"correct":26},"地表深层注浆",{"key":34,"text":604,"correct":22},"钢支撑",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":619,"analysis":37},903950,"隧道地质超前预报方法主要有地质调查法和（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"物理勘探法",{"key":24,"text":612,"correct":22},"超前导坑法",{"key":28,"text":614,"correct":22},"超前钻探法",{"key":31,"text":616,"correct":26},"化学勘探法",{"key":34,"text":618,"correct":22},"水力联系观测法","ABCE",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":52,"analysis":37},903951,"围岩分级是支护结构类型及尺寸的设计、施工方法的选择、隧道施工定额等制定的主要依据，下列关于围岩分级说法错误的有（ ）。",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"无地下水时需要对BQ进行修正",{"key":24,"text":627,"correct":22},"存在高初始应力时无需对BQ进行修正",{"key":28,"text":629,"correct":26},"围岩分级需综合考虑定性指标和定量指标",{"key":31,"text":631,"correct":26},"详细定级时需修正岩体基本质量指标值BQ",{"key":34,"text":633,"correct":22},"初步分级只根据岩石坚硬程度和完整程度确定",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":648,"analysis":37},903952,"隧道洞口按设计要求应先施工完成，以减少干扰，并保证安全，下列关于洞口工程施工说法正确的有（ ）。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"端墙砌筑与墙背回填应两侧同时进行",{"key":24,"text":641,"correct":26},"洞门应尽可能安排在冬季或雨季施工",{"key":28,"text":643,"correct":26},"废弃的土石方应堆放在边坡、仰坡上方",{"key":31,"text":645,"correct":26},"边坡外的截水沟应于洞口土石方开挖后完成",{"key":34,"text":647,"correct":22},"洞口土石方在线位上进行仰坡自上而下的开挖","AE",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":663,"analysis":37},903953,"明洞工程应先施工完成，为加速隧道施工创造条件。下列关于明洞工程施工说法错误的有（ ）。",[653,655,657,659,661],{"key":20,"text":654,"correct":26},"防水层敷设搭接长度不小于100mm",{"key":24,"text":656,"correct":26},"边坡松软易坍塌宜采用先拱后墙法",{"key":28,"text":658,"correct":22},"仰坡易坍塌时宜由内向外进行施工",{"key":31,"text":660,"correct":22},"顶部两侧回填的土面高差不得大于0.3m",{"key":34,"text":662,"correct":22},"人工填筑拱顶中心回填高度达到0.6m时拆除拱架","CDE",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":298,"analysis":37},903954,"公路隧道的开挖方式主要有全断面法、台阶法、（ ）及中导洞法等。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"中隔壁法",{"key":24,"text":671,"correct":26},"三侧壁导坑法",{"key":28,"text":673,"correct":22},"双侧壁导坑法",{"key":31,"text":675,"correct":26},"中心开挖预留周边土法",{"key":34,"text":677,"correct":22},"环形开挖预留核心土法",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":371,"analysis":37},903955,"下列供电线路布置和安装符合要求的有（ ）。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"竖井使用铠装电缆",{"key":24,"text":685,"correct":26},"瓦斯地段的电缆悬空架设",{"key":28,"text":687,"correct":26},"瓦斯地段的输电线使用皮线",{"key":31,"text":689,"correct":22},"施工地段的临时电线路采用橡套电缆",{"key":34,"text":691,"correct":22},"竖井内的电气装置有可靠的切换装置",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":663,"analysis":37},903956,"公路隧道施工通过探测手段，及时提出预报，以保证隧道工程的顺利进行。下列属于隧道施工超前预报内容的有（ ）。",[696,698,700,702,704],{"key":20,"text":697,"correct":26},"瓦斯地段的瓦斯浓度",{"key":24,"text":699,"correct":26},"隧道将要穿过稳定岩层预报",{"key":28,"text":701,"correct":22},"预报可能出现突然涌水的地点",{"key":31,"text":703,"correct":22},"预报可能出现塌方、滑动的规模",{"key":34,"text":705,"correct":22},"预报地质条件变化对施工的影响程度",{"id":707,"libraryId":5,"type":15,"typeLabel":16,"stem":708,"options":709,"answer":82,"analysis":37},903957,"隧道工程是公路工程的重要组成部分，其施工特点包括（ ）。",[710,712,714,716,718],{"key":20,"text":711,"correct":26},"工作面较大",{"key":24,"text":713,"correct":22},"工作环境差",{"key":28,"text":715,"correct":22},"产生大量废渣",{"key":31,"text":717,"correct":22},"受水文地质条件影响较大",{"key":34,"text":719,"correct":26},"暗挖法可以避免导致地面沉陷",{"id":721,"libraryId":5,"type":15,"typeLabel":16,"stem":722,"options":723,"answer":415,"analysis":37},903958,"下列关于新奥法施工说法错误的有（ ）。",[724,726,728,730,732],{"key":20,"text":725,"correct":26},"新奥法施工过程主要是开挖、喷锚、模筑混凝土",{"key":24,"text":727,"correct":26},"新奥法通过监测控制围岩的变形以充分发挥围岩自承能力",{"key":28,"text":729,"correct":22},"初次柔性支护，是在洞身开挖之前必须立即进行的支护工作",{"key":31,"text":731,"correct":22},"新奥法以喷射混凝土和锚杆作为辅助支护手段",{"key":34,"text":733,"correct":26},"装饰是整个隧道贯通之后才进行的",[735,739,742,745,748,751],{"id":736,"name":737,"category":7,"favorite":738},1,"领导干部任职前廉政法规知识测试题",92,{"id":740,"name":741,"category":7,"favorite":736},595,"建筑结构与设备",{"id":743,"name":744,"category":7,"favorite":736},715,"招标采购专业知识与法律法规",{"id":746,"name":747,"category":7,"favorite":736},848,"市政方向-通用基础",{"id":749,"name":750,"category":7,"favorite":8},534,"BIM工程师",{"id":752,"name":750,"category":7,"favorite":8},535]