[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,18,50,1453,[13,34,46,58,70,82,94,106,118,129,141,153,165,176,186,198,210,217,229,236,243,255,267,274,281,293,302,314,326,338,350,362,374,386,397,407,419,431,439,447,455,467,478,490,498,516,531,546,561,576],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},903551,1,"单选题","造价费用项目清单和工程量清单子目在公路工程造价文件体系中同属于公路工程造价项目。两者的区别不包括（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","单位设置的原则不一致",true,{"key":24,"text":25,"correct":26},"B","子目设置的原则不一致",false,{"key":28,"text":29,"correct":26},"C","子目数量的计算原则不同",{"key":31,"text":32,"correct":26},"D","清单子目的编码原则不一致","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},903552,"工程量清单作为招标文件、合同文件最重要的组成部分，其重要作用不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"不公平竞争的源头",{"key":24,"text":41,"correct":26},"评标的共同基础",{"key":28,"text":43,"correct":26},"促进投标人提高技术水平和管理水平",{"key":31,"text":45,"correct":26},"投标人公平竞争投标报价的共同基础",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},903553,"工程量清单说明强调的主要内容不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"工程量清单中工程量的性质与作用",{"key":24,"text":53,"correct":26},"投标人填报工程量清单时的要求",{"key":28,"text":55,"correct":22},"计日工的设计原则",{"key":31,"text":57,"correct":26},"工程量清单单价和总价的含义",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},903554,"下列对工程量清单计量规则的作用描述错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"确定了清单子目所包含的工作内容",{"key":24,"text":65,"correct":22},"工程量清单计量规则是设计工程量的理论依据",{"key":28,"text":67,"correct":26},"对承包人完成子目工作的工艺流程、施工过程提出了具体的要求",{"key":31,"text":69,"correct":26},"对承包人完成子目工作的工程质量提出了对应的质量检验标准",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},903555,"工程量清单又叫工程数量清单，是招标文件和合同文件的重要组成部分。下列关于工程量清单的说法中不正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"工程量清单可以表述公路工程工程量明细",{"key":24,"text":77,"correct":26},"中标后含单价的工程量清单是计量支付的重要依据",{"key":28,"text":79,"correct":22},"未标价的工程量清单又称“报价单”",{"key":31,"text":81,"correct":26},"工程量清单反映每个相对独立的个体项目的工程内容预计数量",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},903556,"工程量清单根据在公路建设过程中订立时间、阶段的不同分为四类，不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"招标工程量清单",{"key":24,"text":89,"correct":26},"投标工程量清单",{"key":28,"text":91,"correct":26},"合同工程量清单",{"key":31,"text":93,"correct":22},"计划工程量清单",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},903557,"清单计价工程细目、预算定额子目、图纸中的设计工程量细目之间的工作内容综合程度关系正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"预算定额子目≥清单计价细目≥设计图纸细目",{"key":24,"text":101,"correct":22},"清单计价细目≥预算定额子目≥设计图纸细目",{"key":28,"text":103,"correct":26},"设计图纸细目≥清单计价细目≥预算定额子目",{"key":31,"text":105,"correct":26},"设计图纸细目≥预算定额子目≥清单计价细目",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},903558,"盈余分析是从标价组成的各个方面挖掘潜力、节约开支，计算出基础标价可能降低的数额，即所谓“ 挖潜盈余”，进而算出（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"高标价",{"key":24,"text":113,"correct":22},"低标价",{"key":28,"text":115,"correct":26},"平衡标价",{"key":31,"text":117,"correct":26},"成本标价",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},903559,"招标人确定招标标底或最高投标限价的依据，评判投标报价合理性的重要依据的是（ ）",[122,124,126,127],{"key":20,"text":123,"correct":26},"招（投）标工程量清单",{"key":24,"text":125,"correct":22},"工程量清单预算",{"key":28,"text":91,"correct":26},{"key":31,"text":128,"correct":26},"工程变更费用文件",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},903560,"工程量清单计价与定额计价的差异不包括（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":26},"工程量清单计价与定额计价的主要计价依据不同",{"key":24,"text":136,"correct":26},"工程量清单计价与定额计价的表现形式不同",{"key":28,"text":138,"correct":22},"定额计价是以工程量清单为表现形式",{"key":31,"text":140,"correct":26},"工程量清单计价中单价与定额计价中的技术经济指标的内涵不同",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},903561,"下列对投标报价分析的评估方法说法错误的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":26},"投标报价的宏观审核",{"key":24,"text":148,"correct":22},"投标报价的定额分析",{"key":28,"text":150,"correct":26},"投标报价的动态分析",{"key":31,"text":152,"correct":26},"投标报价的盈亏分析",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},903562,"现阶段招标控制价主要采用（ ）编制。",[157,159,161,163],{"key":20,"text":158,"correct":26},"清单预算法",{"key":24,"text":160,"correct":26},"定额计价法",{"key":28,"text":162,"correct":26},"清单计价法",{"key":31,"text":164,"correct":22},"定额单价法",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},903563,"直接工程费的计算一般采用（ ）进行计算。",[169,171,172,174],{"key":20,"text":170,"correct":22},"定额单价分析法",{"key":24,"text":162,"correct":26},{"key":28,"text":173,"correct":26},"项目成本法",{"key":31,"text":175,"correct":26},"工程定额分析法",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":24,"analysis":33},903564,"工程量清单计价属于项目实施阶段的造价文件编制，其组成不包括（ ）。",[180,181,183,184],{"key":20,"text":123,"correct":26},{"key":24,"text":182,"correct":22},"工程设计费用文件",{"key":28,"text":91,"correct":26},{"key":31,"text":185,"correct":26},"计量与支付文件",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},903565,"基础标价是参照（ ）和有关定额计算完成本工程所需的全部费用。",[190,192,194,196],{"key":20,"text":191,"correct":26},"工程定额",{"key":24,"text":193,"correct":22},"企业定额",{"key":28,"text":195,"correct":26},"设计定额",{"key":31,"text":197,"correct":26},"预算定额",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":28,"analysis":33},903566,"按照公路工程项目的基本组成划分，公路工程工程量清单可以分为三大类，下列不属于的是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":26},"交通机电工程工程量清单",{"key":24,"text":205,"correct":26},"交通土建工程工程量清单",{"key":28,"text":207,"correct":22},"交通水利工程工程量清单",{"key":31,"text":209,"correct":26},"房屋建筑工程工程量清单",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":212,"answer":28,"analysis":33},903567,[213,214,215,216],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":57,"correct":26},{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":28,"analysis":33},903568,"造价文件编制完成后，应写出（ ），文字力求简明扼要。",[221,223,225,227],{"key":20,"text":222,"correct":26},"编制计划",{"key":24,"text":224,"correct":26},"编制依据",{"key":28,"text":226,"correct":22},"编制说明",{"key":31,"text":228,"correct":26},"编制办法",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":231,"answer":20,"analysis":33},903569,[232,233,234,235],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":26},{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":238,"answer":31,"analysis":33},903570,[239,240,241,242],{"key":20,"text":158,"correct":26},{"key":24,"text":160,"correct":26},{"key":28,"text":162,"correct":26},{"key":31,"text":164,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},903571,"下列属于企业管理费的是（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":26},"施工辅助费",{"key":24,"text":250,"correct":22},"主副食运费补贴",{"key":28,"text":252,"correct":26},"辅助生产间接费",{"key":31,"text":254,"correct":26},"材料费",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},903573,"下列费用中，不属于规费的是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":26},"养老保险费",{"key":24,"text":262,"correct":26},"失业保险费",{"key":28,"text":264,"correct":22},"疾病保险费",{"key":31,"text":266,"correct":26},"工伤保险费",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":269,"answer":24,"analysis":33},903574,[270,271,272,273],{"key":20,"text":146,"correct":26},{"key":24,"text":148,"correct":22},{"key":28,"text":150,"correct":26},{"key":31,"text":152,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":276,"answer":24,"analysis":33},903575,[277,278,279,280],{"key":20,"text":63,"correct":26},{"key":24,"text":65,"correct":22},{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":26},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},903576,"基本预备费计算以建筑安装工程费、土地征用及拆迁补偿费、工程建设其他费用之和为基数，工程可行性研究报告投资估算按（ ）计列。",[285,287,289,291],{"key":20,"text":286,"correct":26},"11%",{"key":24,"text":288,"correct":22},"9%",{"key":28,"text":290,"correct":26},"5%",{"key":31,"text":292,"correct":26},"4%",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":295,"answer":20,"analysis":33},903577,[296,297,298,300],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":26},{"key":28,"text":299,"correct":26},"促进投标人提高技术水平",{"key":31,"text":301,"correct":26},"投标人公平竞争的共同基础",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},903578,"关于工程量清单与计量规则、招标文件、合同文件的关系，下列说法中错误的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"工程量清单子目与合同约定计量规则的内容及技术规范可以不同",{"key":24,"text":309,"correct":26},"执行的计量规则必须是合同约定的",{"key":28,"text":311,"correct":26},"技术规范、图纸和工程量清单三者都是投标人在投标时必不可少的资料",{"key":31,"text":313,"correct":26},"招标图纸是招标文件和合同的重要组成部分",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},903579,"高等级公路为了满足施工质量和工期要求，一般采用（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":26},"人工施工",{"key":24,"text":321,"correct":22},"机械施工",{"key":28,"text":323,"correct":26},"人工机械组合施工",{"key":31,"text":325,"correct":26},"以机械施工为辅",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":28,"analysis":33},903580,"桥梁基础和墩台工程的施工基本上都是采用（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":26},"悬臂施工",{"key":24,"text":333,"correct":26},"预制安装或悬拼",{"key":28,"text":335,"correct":22},"就地砌筑或浇筑",{"key":31,"text":337,"correct":26},"顶推施工",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},903581,"（ ）是基本建设程序中的一个具有决定性的工作环节，对建设工程的顺利实施，提高投资经济效益，都有着重要影响。",[342,344,346,348],{"key":20,"text":343,"correct":26},"投资决策",{"key":24,"text":345,"correct":22},"工程设计",{"key":28,"text":347,"correct":26},"招投标",{"key":31,"text":349,"correct":26},"可行性研究",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},903582,"采用两阶段设计的建设项目，初步设计文件一经主管部门批准，（ ）是建设项目投资的最高限额，不得随意突破。",[354,356,358,360],{"key":20,"text":355,"correct":26},"投资估算",{"key":24,"text":357,"correct":22},"工程概算",{"key":28,"text":359,"correct":26},"修正概算",{"key":31,"text":361,"correct":26},"施工图预算",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":28,"analysis":33},903583,"对于技术复杂、基础资料缺乏或不足的建设项目，必要时可采用（ ）设计。",[366,368,370,372],{"key":20,"text":367,"correct":26},"一阶段",{"key":24,"text":369,"correct":26},"两阶段",{"key":28,"text":371,"correct":22},"三阶段",{"key":31,"text":373,"correct":26},"四阶段",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},903584,"二级公路的年平均日设计交通量为（ ）辆小客车。",[378,380,382,384],{"key":20,"text":379,"correct":26},"15000",{"key":24,"text":381,"correct":22},"5000～15000",{"key":28,"text":383,"correct":26},"2000～6000",{"key":31,"text":385,"correct":26},"400～2000",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},903585,"高速公路的年平均日设计交通量宜在（ ）辆小客车以上。",[390,392,393,395],{"key":20,"text":391,"correct":26},"10000",{"key":24,"text":379,"correct":22},{"key":28,"text":394,"correct":26},"20000",{"key":31,"text":396,"correct":26},"22000",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},903586,"根据《关于发布公路建设项目工程决算编制办法的通知》规定，未编制（ ）的建设项目，不得组织竣工验收。",[401,402,403,405],{"key":20,"text":357,"correct":26},{"key":24,"text":355,"correct":26},{"key":28,"text":404,"correct":26},"竣工结算",{"key":31,"text":406,"correct":22},"工程决算",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":28,"analysis":33},903587,"公路工程按建设规模划分，下列选项中属于限额以下项目的是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":26},"更新改造项目总投资为6000万元",{"key":24,"text":414,"correct":26},"更新改造项目总投资为5000万元",{"key":28,"text":416,"correct":22},"更新改造项目总投资为4500万元",{"key":31,"text":418,"correct":26},"更新改造项目总投资为90万元",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},903588,"供汽车、非汽车交通混合行驶的双车道公路为（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":26},"高速公路",{"key":24,"text":426,"correct":26},"一级公路",{"key":28,"text":428,"correct":26},"二级公路",{"key":31,"text":430,"correct":22},"三级公路",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},903589,"供汽车分向、分车道行驶，可根据需要控制出入的多车道公路为（ ）。",[435,436,437,438],{"key":20,"text":424,"correct":26},{"key":24,"text":426,"correct":22},{"key":28,"text":428,"correct":26},{"key":31,"text":430,"correct":26},{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},903590,"经批准的概算是基本建设项目投资的最高限额，若概算突破批准的（ ）的10%时，应修编可行性研究报吿并报请原批准部门重新审批。",[443,444,445,446],{"key":20,"text":355,"correct":22},{"key":24,"text":357,"correct":26},{"key":28,"text":359,"correct":26},{"key":31,"text":361,"correct":26},{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},903591,"目前，公路基本建设项目一般采用（ ）设计。",[451,452,453,454],{"key":20,"text":367,"correct":26},{"key":24,"text":369,"correct":22},{"key":28,"text":371,"correct":26},{"key":31,"text":373,"correct":26},{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},903592,"项目建设前期造价监督是指从项目立项至（ ）期间有关工程造价的监督和管理。",[459,461,463,465],{"key":20,"text":460,"correct":26},"施工图设计完成",{"key":24,"text":462,"correct":22},"招投标结束",{"key":28,"text":464,"correct":26},"项目验收",{"key":31,"text":466,"correct":26},"项目建成",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},903593,"项目实施阶段造价监督是指（ ）至交工验收前有关工程造价的监督和管理。",[471,473,475,476],{"key":20,"text":472,"correct":26},"项目立项",{"key":24,"text":474,"correct":22},"项目开工后",{"key":28,"text":460,"correct":26},{"key":31,"text":477,"correct":26},"招投标截止",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":31,"analysis":33},903594,"项目实施阶段造价监督的主要内容不包括（）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"从事公路工程造价活动的单位和人员的信用情况",{"key":24,"text":485,"correct":26},"各阶段相关造价文件的落实情况",{"key":28,"text":487,"correct":26},"设计变更原因及费用变更情况",{"key":31,"text":489,"correct":22},"项目实施阶段的气象情况",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},903595,"公路基本建设项目一般采用（ ）设计。",[494,495,496,497],{"key":20,"text":367,"correct":26},{"key":24,"text":369,"correct":22},{"key":28,"text":371,"correct":26},{"key":31,"text":373,"correct":26},{"id":499,"libraryId":5,"type":500,"typeLabel":501,"stem":502,"options":503,"answer":515,"analysis":33},903596,2,"多选题","桥孔布置应符合（）。",[504,506,508,510,512],{"key":20,"text":505,"correct":26},"考虑桥位中游已建或拟建的水利对桥空的影响",{"key":24,"text":507,"correct":22},"桥位河段的天然河道不宜开挖或改移",{"key":28,"text":509,"correct":22},"与天然河流断面流量分配相适应",{"key":31,"text":511,"correct":22},"应注意地质情况",{"key":513,"text":514,"correct":26},"E","对跨径大于50m的桥孔，宜采用标准化跨径","BCD",{"id":517,"libraryId":5,"type":500,"typeLabel":501,"stem":518,"options":519,"answer":530,"analysis":33},903598,"关于河流的下蚀作用，下列说法正确的有（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"下蚀作用也称为溯源侵蚀",{"key":24,"text":523,"correct":22},"下蚀作用的作用强度主要取决于河水的流速和流量",{"key":28,"text":525,"correct":26},"下蚀作用可以永无休止的进行下去",{"key":31,"text":527,"correct":22},"岩性越疏松，下蚀作用越容易进行",{"key":513,"text":529,"correct":26},"河水的流速和流量越大，下蚀作用的能量越小","ABD",{"id":532,"libraryId":5,"type":500,"typeLabel":501,"stem":533,"options":534,"answer":545,"analysis":33},903599,"季节性冰冻地区并不是所有的道路都会产生冻胀与翻浆，（ ），水分都不容易积聚，不易发生冻胀与翻浆。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"渗透性较高的砂类土",{"key":24,"text":538,"correct":22},"渗透性很低的黏质土",{"key":28,"text":540,"correct":26},"粉质土",{"key":31,"text":542,"correct":26},"极细砂",{"key":513,"text":544,"correct":26},"多年冻土","AB",{"id":547,"libraryId":5,"type":500,"typeLabel":501,"stem":548,"options":549,"answer":560,"analysis":33},903600,"自然区划根据划分的原则包括（）。",[550,552,554,556,558],{"key":20,"text":551,"correct":26},"区域差异化原则",{"key":24,"text":553,"correct":22},"道路工程特征相似的原则",{"key":28,"text":555,"correct":22},"地表气候区划差异性原则",{"key":31,"text":557,"correct":22},"自然气候因素综合作用的原则",{"key":513,"text":559,"correct":22},"自然气候因素主导作用的原则","BCDE",{"id":562,"libraryId":5,"type":500,"typeLabel":501,"stem":563,"options":564,"answer":575,"analysis":33},903601,"气象对工程建设的影响主要体现在（ ）。",[565,567,569,571,573],{"key":20,"text":566,"correct":22},"对路基施工的影响",{"key":24,"text":568,"correct":22},"对路面施工的影响",{"key":28,"text":570,"correct":22},"对桥梁施工的影响",{"key":31,"text":572,"correct":26},"对高空作业的影响",{"key":513,"text":574,"correct":26},"对海洋施工作业的影响","ABC",{"id":577,"libraryId":5,"type":500,"typeLabel":501,"stem":578,"options":579,"answer":590,"analysis":33},903602,"崩塌形成的基本条件，主要有（ ）几个方面。",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"地形条件",{"key":24,"text":583,"correct":22},"岩性条件",{"key":28,"text":585,"correct":22},"构造条件",{"key":31,"text":587,"correct":26},"岩体完整性好",{"key":513,"text":589,"correct":22},"其他自然因素","ABCE",[592,595,598,601,604,607],{"id":15,"name":593,"category":7,"favorite":594},"领导干部任职前廉政法规知识测试题",92,{"id":596,"name":597,"category":7,"favorite":15},595,"建筑结构与设备",{"id":599,"name":600,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":602,"name":603,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":605,"name":606,"category":7,"favorite":8},534,"BIM工程师",{"id":608,"name":606,"category":7,"favorite":8},535]