[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,17,50,1453,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,224,236,248,260,270,282,294,305,317,325,335,347,359,371,383,395,403,411,423,435,447,459,468,476,488,500,512,524,536,548,560,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},903500,1,"单选题","对于冻胀力引起的病害，处理方法最好的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","隔热保温",true,{"key":24,"text":25,"correct":26},"B","围岩压浆",false,{"key":28,"text":29,"correct":26},"C","灌浆锚固",{"key":31,"text":32,"correct":26},"D","隧底加固","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},903501,"路基养护工程作业内容中，增设或完善排水系统属于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"预防养护",{"key":24,"text":41,"correct":26},"修复养护",{"key":28,"text":43,"correct":26},"专项养护",{"key":31,"text":45,"correct":26},"应急养护",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},903502,"安全生产费按（ ）计算，费率按不少于1.5%计取。",[50,52,54,56],{"key":20,"text":51,"correct":26},"定额建筑安装工程费乘以安全生产费费率",{"key":24,"text":53,"correct":22},"建筑安装工程费乘以安全生产费费率",{"key":28,"text":55,"correct":26},"定额直接费乘以安全生产费费率",{"key":31,"text":57,"correct":26},"直接费乘以安全生产费费率",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},903503,"材料采购及保管费，以（ ）为基数乘以采购保管费率计算。",[62,64,66,68],{"key":20,"text":63,"correct":26},"材料的原价",{"key":24,"text":65,"correct":26},"材料的原价加运杂费",{"key":28,"text":67,"correct":22},"材料的原价加运杂费及场外运输损耗的合计数",{"key":31,"text":69,"correct":26},"材料的原价加场外运输损耗的合计数",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},903504,"高原地区施工增加费指在海拔高度（ ）以上地区施工，由于受气候、气压的影响，致使人工、机械效率降低而增加的费用。",[74,76,78,80],{"key":20,"text":75,"correct":26},"1500",{"key":24,"text":77,"correct":22},"2000",{"key":28,"text":79,"correct":26},"2500",{"key":31,"text":81,"correct":26},"3000",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},903505,"工程造价编制流程中，建安工程费用计算的前一道流程是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"工程量摘取",{"key":24,"text":89,"correct":22},"分项工程费用摘取",{"key":28,"text":91,"correct":26},"选择施工方法",{"key":31,"text":93,"correct":26},"预备费用计算",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},903506,"公路工程的消耗量中一般不作为工程造价编制依据的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工定额",{"key":24,"text":101,"correct":26},"预算定额",{"key":28,"text":103,"correct":26},"概算定额",{"key":31,"text":105,"correct":26},"估算指标",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},903507,"公路工程造价是指公路工程建设项目从（ ）使用所需的全部费用。",[110,112,114,116],{"key":20,"text":111,"correct":26},"开工到交工",{"key":24,"text":113,"correct":22},"筹建到竣工验收交付",{"key":28,"text":115,"correct":26},"筹建到竣工交工",{"key":31,"text":117,"correct":26},"开工到竣工验收交付",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},903508,"公路工程造价文件按不同的需要分为甲、乙两组文件，下列属于乙组文件的有（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"总概（预）算人工、主要材料、施工机械台班数量汇总表",{"key":24,"text":125,"correct":26},"人工、材料、施工机械台班单价汇总表",{"key":28,"text":127,"correct":26},"综合费率计算表",{"key":31,"text":129,"correct":22},"施工机械台班单价计算表",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},903509,"基本预备费计算方法以建筑安装工程费、土地征用及拆迁补偿费、工程建设其他费用之和为基数，施工图预算的费率为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"9%",{"key":24,"text":137,"correct":26},"5%",{"key":28,"text":139,"correct":26},"4%",{"key":31,"text":141,"correct":22},"3%",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},903510,"建设单位（业主）管理费以（ ）为基数，分段选用费率，以累进办法计算。",[146,148,150,152],{"key":20,"text":147,"correct":26},"建筑安装工程费",{"key":24,"text":149,"correct":22},"定额建筑安装工程费",{"key":28,"text":151,"correct":26},"定额直接费",{"key":31,"text":153,"correct":26},"直接费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},903511,"建设项目管理费属于（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"安全生产费",{"key":24,"text":161,"correct":26},"企业管理费",{"key":28,"text":163,"correct":22},"工程建设其他费",{"key":31,"text":165,"correct":26},"专项费用",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},903512,"某工程用于自发电的机械为160kW以内柴油发电机组，其折旧费97.44元\u002F台班，检修费为37.78元\u002F台班，维护费125.19元\u002F台班，安拆辅助费5.83元\u002F台班，柴油消耗量为182.25kg，柴油单价7.54元\u002Fkg，发电机台班单价为（ ）",[170,172,174,176],{"key":20,"text":171,"correct":26},"266.25（元\u002F台班）",{"key":24,"text":173,"correct":26},"1486.17（元\u002F台班）",{"key":28,"text":175,"correct":22},"1752.42（元\u002F台班）",{"key":31,"text":177,"correct":26},"1219.12（元\u002F台班）",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},903513,"生产人员培训费属于（ ）。",[182,183,185,187],{"key":20,"text":159,"correct":26},{"key":24,"text":184,"correct":26},"人工费",{"key":28,"text":186,"correct":22},"生产准备费",{"key":31,"text":188,"correct":26},"建设项目前期工作费",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},903514,"下列费用不能计入雨季施工增加费的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":26},"因雨季施工所需增加的工、料、机费用的支出",{"key":24,"text":196,"correct":26},"材料因雨季受潮、受湿的耗损费用",{"key":28,"text":198,"correct":22},"因50年一遇的大暴雨，防止雨水必须采取的防护措施的费用",{"key":31,"text":200,"correct":26},"路基土方工程的开挖和运输，因雨季施工引起的黏附工具、降低工效所增加的费用",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},903515,"夜间施工增加费以（ ）为计费基数，乘以相应的夜间施工增加费费率计算。",[205,207,209,211],{"key":20,"text":206,"correct":26},"定额人工费",{"key":24,"text":208,"correct":26},"定额施工机械使用费",{"key":28,"text":210,"correct":22},"定额人工费与定额施工机械使用费之和",{"key":31,"text":212,"correct":26},"定额人工费与定额材料费及定额施工机械使用费之和",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},903516,"专项费用包括施工场地建设费和（ ）",[217,219,220,222],{"key":20,"text":218,"correct":26},"工程排污费",{"key":24,"text":159,"correct":22},{"key":28,"text":221,"correct":26},"劳动保护费",{"key":31,"text":223,"correct":26},"保险费",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},903517,"下列属于企业管理费的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":26},"施工辅助费",{"key":24,"text":231,"correct":22},"主副食运费补贴",{"key":28,"text":233,"correct":26},"辅助生产间接费",{"key":31,"text":235,"correct":26},"材料费",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},903518,"下列费用中，不属于规费的是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":26},"养老保险费",{"key":24,"text":243,"correct":26},"失业保险费",{"key":28,"text":245,"correct":22},"疾病保险费",{"key":31,"text":247,"correct":26},"工伤保险费",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},903519,"下列选项中不属于土地使用及拆迁补偿费的是（ ）",[252,254,256,258],{"key":20,"text":253,"correct":26},"永久占地费",{"key":24,"text":255,"correct":26},"拆迁补偿费",{"key":28,"text":257,"correct":22},"工程保通管理费",{"key":31,"text":259,"correct":26},"水土保持补偿费",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},903520,"下列选项中不属于工程建设其他费的是（ ）",[264,266,267,268],{"key":20,"text":265,"correct":26},"建设项目管理费",{"key":24,"text":259,"correct":22},{"key":28,"text":188,"correct":26},{"key":31,"text":269,"correct":26},"联合试运转费",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},903521,"高等级公路为了满足施工质量和工期要求，一般采用（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"人工施工",{"key":24,"text":277,"correct":22},"机械施工",{"key":28,"text":279,"correct":26},"人工机械组合施工",{"key":31,"text":281,"correct":26},"以机械施工为辅",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},903523,"下列属于建筑安装工程费的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"直接费、设备购置费、措施费",{"key":24,"text":289,"correct":26},"人工费、材料费、施工机械使用费",{"key":28,"text":291,"correct":26},"冬季施工增加费、雨季施工增加费、夜间施工增加费",{"key":31,"text":293,"correct":26},"基本费用、主副食运费补贴、职工探亲路费",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},903524,"下列选项中不属于措施费的是（ ）",[298,300,302,303],{"key":20,"text":299,"correct":26},"冬季施工增加费",{"key":24,"text":301,"correct":26},"行车干扰工程施工增加费",{"key":28,"text":229,"correct":26},{"key":31,"text":304,"correct":22},"工程机械使用费",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},903525,"造价文件编制完成后，应写出（ ），文字力求简明扼要。",[309,311,313,315],{"key":20,"text":310,"correct":26},"编制计划",{"key":24,"text":312,"correct":26},"编制依据",{"key":28,"text":314,"correct":22},"编制说明",{"key":31,"text":316,"correct":26},"编制办法",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},903526,"下列哪些不属于措施费？（ ）",[321,322,323,324],{"key":20,"text":299,"correct":26},{"key":24,"text":301,"correct":26},{"key":28,"text":229,"correct":26},{"key":31,"text":304,"correct":22},{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":28,"analysis":33},903527,"编制办法中规定的费用指标和一系列费用的取费费率都属于（ ）的范围。",[329,330,331,333],{"key":20,"text":101,"correct":26},{"key":24,"text":103,"correct":26},{"key":28,"text":332,"correct":22},"费用定额",{"key":31,"text":334,"correct":26},"工程定额",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},903528,"定额或指标的计量单位主要是根据单位分部分项工程和（ ）确定。",[339,341,343,345],{"key":20,"text":340,"correct":26},"结构构件的受力特性",{"key":24,"text":342,"correct":22},"结构构件的形体特征及其变化",{"key":28,"text":344,"correct":26},"结构构件的费用",{"key":31,"text":346,"correct":26},"结构构件的消耗量",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":28,"analysis":33},903529,"定额的费用项目划分为不变费用和可变费用两类。其中，不变费用不包括（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":26},"折旧费",{"key":24,"text":354,"correct":26},"维护费",{"key":28,"text":356,"correct":22},"动力燃料费",{"key":31,"text":358,"correct":26},"安拆辅助费",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":31,"analysis":33},903530,"研究试验费不包括（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":26},"建设过程中必须进行研究和试验所需的费用",{"key":24,"text":366,"correct":26},"支付科技成果的一次性技术转让费",{"key":28,"text":368,"correct":26},"支付专利、先进技术的一次性技术转让费",{"key":31,"text":370,"correct":22},"应由前期工作费开支的项目",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},903531,"在编制概、预算时，需要考虑的辅助工程工程量不包括（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":26},"清除表土或零填地段的基底压实、耕地填前碾压的回填数量",{"key":24,"text":378,"correct":22},"路基、路面、桥梁、涵洞以及隧道工程",{"key":28,"text":380,"correct":26},"为保证路基边缘压实而加宽填筑的数量",{"key":31,"text":382,"correct":26},"临时工程",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":20,"analysis":33},903532,"利润指施工企业完成所承包工程获得的盈利，按定额直接费及措施费、企业管理费之和的（ ）计算。",[387,389,391,393],{"key":20,"text":388,"correct":22},"7.42%",{"key":24,"text":390,"correct":26},"7.41%",{"key":28,"text":392,"correct":26},"7.44%",{"key":31,"text":394,"correct":26},"7.43%",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":28,"analysis":33},903533,"下列哪项不属于土地使用及拆迁补偿费？（ ）",[399,400,401,402],{"key":20,"text":253,"correct":26},{"key":24,"text":255,"correct":26},{"key":28,"text":257,"correct":22},{"key":31,"text":259,"correct":26},{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},903534,"下列哪项不属于工程建设其他费？（ ）",[407,408,409,410],{"key":20,"text":265,"correct":26},{"key":24,"text":259,"correct":22},{"key":28,"text":188,"correct":26},{"key":31,"text":269,"correct":26},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":31,"analysis":33},903535,"公路工程造价的编制原则不包括（ ）。",[415,417,419,421],{"key":20,"text":416,"correct":26},"正确合理地采用工程计价依据",{"key":24,"text":418,"correct":26},"要严格遵守国家的方针、政策和有关制度",{"key":28,"text":420,"correct":26},"要认真做好造价分析，有步骤、有目的地配合设计人员开展限额设计和优化设计",{"key":31,"text":422,"correct":22},"拟定现场调查提要与地质勘探和设计人员相互配合提供资料等要求",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":28,"analysis":33},903536,"在编制工程造价之前，造价工程师必须进行现场调查，收集有关资料，其中不包括（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":26},"社会条件",{"key":24,"text":430,"correct":26},"自然条件",{"key":28,"text":432,"correct":22},"地质条件",{"key":31,"text":434,"correct":26},"技术经济条件",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":28,"analysis":33},903537,"辅助工程的工程数量，主要依据不包括（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":26},"概、预算编制人员的工作经验",{"key":24,"text":442,"correct":26},"工程实际情况",{"key":28,"text":444,"correct":22},"定额规定的工程量",{"key":31,"text":446,"correct":26},"施工组织设计",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},903538,"除了涉及实体工程数量的计算外，还需计算为修建实体而必须消耗的辅助工程的工程数量的量为（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":26},"清单工程量",{"key":24,"text":454,"correct":22},"定额工程量",{"key":28,"text":456,"correct":26},"计量工程量",{"key":31,"text":458,"correct":26},"支付工程量",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},903539,"招标人编制工程量清单时，依据施工图纸、招标文件、技术规范确定的工程数量称之为（ ）",[463,464,466,467],{"key":20,"text":452,"correct":22},{"key":24,"text":465,"correct":26},"合同工程量",{"key":28,"text":456,"correct":26},{"key":31,"text":458,"correct":26},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},903540,"在公路工程实施阶段，对已完工程进行计量后，按合同约定确认进行支付的计量工程量是指（）",[472,473,474,475],{"key":20,"text":452,"correct":26},{"key":24,"text":465,"correct":26},{"key":28,"text":456,"correct":26},{"key":31,"text":458,"correct":22},{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},903541,"下列关于工程量的说法不正确的是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":26},"定额工程量计算需考虑辅助工程量",{"key":24,"text":483,"correct":22},"定额工程量计算不具有多阶段性和多次性",{"key":28,"text":485,"correct":26},"正确确定定额工程数量是项目合理计价的前提",{"key":31,"text":487,"correct":26},"工程量的正确计算是项目决算的基本依据",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":31,"analysis":33},903542,"下列关于公路工程实施阶段不同工程量的说法正确的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":26},"清单工程量由投标人编制工程量清单时确定",{"key":24,"text":495,"correct":26},"合同工程量与清单工程量数量不一样",{"key":28,"text":497,"correct":26},"项目计量工程量之和不等同于项目的实际规模",{"key":31,"text":499,"correct":22},"支付工程量是按合同约定确认进行支付的计量工程量",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},903543,"工程量的计算需要按照一定的工程量计算规则逐项进行，定额工程量计算的主要依据不包括（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":26},"经审定通过经济调查资料",{"key":24,"text":507,"correct":26},"经审定的施工组织设计",{"key":28,"text":509,"correct":22},"未经审定的设计图纸",{"key":31,"text":511,"correct":26},"国家、行业发布的各类消耗量定额",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},903544,"定额工程量与清单工程量两者区别不包括（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"两者用途不同",{"key":24,"text":519,"correct":26},"计算依据不同",{"key":28,"text":521,"correct":26},"计算口径不同",{"key":31,"text":523,"correct":22},"计量单位选择相同",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},903545,"报价时招标文件各部分的优先次序说法正确的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"合同专用条款及数据表优先于合同通用条款",{"key":24,"text":531,"correct":26},"图纸中的工程数量优先于工程量清单中的工程数量",{"key":28,"text":533,"correct":26},"工程量清单中项目划分、计量与技术规范须独立考虑",{"key":31,"text":535,"correct":26},"合同通用条款及数据表优先于合同专用条款",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},903546,"对于面积在（ ）以下的固定物（如检查井等）不予扣除。",[540,542,544,546],{"key":20,"text":541,"correct":22},"1m2",{"key":24,"text":543,"correct":26},"2m2",{"key":28,"text":545,"correct":26},"3m2",{"key":31,"text":547,"correct":26},"4m2",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},903547,"工程量应由（ ）计算，（ ）审核。",[552,554,556,558],{"key":20,"text":553,"correct":26},"承包人，发包人",{"key":24,"text":555,"correct":22},"承包人，监理人",{"key":28,"text":557,"correct":26},"发包人，监理人",{"key":31,"text":559,"correct":26},"监理人，发包人",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":28,"analysis":33},903548,"在公路工程发、承包活动中，发、承包双方根据合同法、招（投）标文件及有关规定，以约定的工程量清单计价方式，签订工程承包合同时确定的工程量清单称之为（ ）",[564,566,568,570],{"key":20,"text":565,"correct":26},"招标工程量清单",{"key":24,"text":567,"correct":26},"投标工程量清单",{"key":28,"text":569,"correct":22},"合同工程量清单",{"key":31,"text":571,"correct":26},"结算工程量清单",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},903549,"在现场钉桩后（ ）天内，承包人应将设计和进场复测的土方横断面图连同土方的面积与体积计算表一并提交监理人批准。",[576,578,580,582],{"key":20,"text":577,"correct":26},"14",{"key":24,"text":579,"correct":26},"28",{"key":28,"text":581,"correct":26},"32",{"key":31,"text":583,"correct":22},"56",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},903550,"关于工程量清单与计量规则、招标文件、合同文件的关系，下列说法中错误的是（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"工程量清单子目与合同约定计量规则的内容及技术规范可以不同",{"key":24,"text":591,"correct":26},"合同条件一般也称合同条款.它是合同中商务条款的重要组成部分",{"key":28,"text":593,"correct":26},"技术规范、图纸和工程量清单三者都是投标人在投标时必不可少的资料",{"key":31,"text":595,"correct":26},"招标图纸是招标文件和合同的重要组成部分",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]