[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,14,50,1453,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},903347,1,"单选题","下列关于混凝土的生产和运输说法正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","混凝土配合比应以体积比表示",false,{"key":24,"text":25,"correct":26},"B","混凝土拌和物不得有离析和泌水现象",true,{"key":28,"text":29,"correct":22},"C","集中搅拌时水泥数量允许偏差为±2%",{"key":31,"text":32,"correct":22},"D","运至搅拌地点后坍落度不符合要求时应废弃","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},903348,"下列关于混凝土的浇筑和养护说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"卸落高度超过10m应设置溜槽",{"key":24,"text":41,"correct":22},"混凝土洒水保湿养护时间应不小于3天",{"key":28,"text":43,"correct":22},"上层混凝土浇筑应在下层混凝土终凝前完成",{"key":31,"text":45,"correct":26},"混凝土应按一定的厚度、顺序和方向分层浇筑",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},903349,"下列关于高强混凝土和高性能混凝土说法错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"两者生产均需要使用高效减水剂",{"key":24,"text":53,"correct":22},"高性能混凝土宜选用优质水泥和集料",{"key":28,"text":55,"correct":22},"高强混凝土水泥强度等级不宜低于52.5",{"key":31,"text":57,"correct":26},"高强混凝土的胶凝材料总量不宜大于500kg\u002Fm3",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},903350,"下列关于基坑支护说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"基坑深度＞4m时，可采用槽钢支护",{"key":24,"text":65,"correct":22},"基坑深度≤4m时，宜采用锁口钢管桩围堰支护",{"key":28,"text":67,"correct":26},"锚杆加固孔深≤3m时，宜用先注浆后插入锚杆工艺",{"key":31,"text":69,"correct":22},"采用孔底注浆法的注浆管应插至距孔底100～150mm处",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},903351,"下列关于挖基施工和排水说法错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"挖基施工宜安排在枯水季节进行",{"key":24,"text":77,"correct":22},"排水困难时，宜采用水下挖基方法",{"key":28,"text":79,"correct":22},"挖至基底前预留一定厚度由人工开挖至设计高程",{"key":31,"text":81,"correct":26},"采用机械开挖时发现超挖，应直接回填至设计标高",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},903352,"下列关于墩台钢筋施工的说法中正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"高度大于20m的桥墩安装时宜设置劲性骨架",{"key":24,"text":89,"correct":22},"钢筋施工时其分节高度不宜大于6m",{"key":28,"text":91,"correct":22},"钢筋施工时其分节高度不宜大于12m",{"key":31,"text":93,"correct":26},"上段混凝土强度超2.5MPa时绑扎下段钢筋",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},903353,"下列关于墩台模板施工的说法中错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"钢筋与模板之间厚度不允许有正偏差",{"key":24,"text":101,"correct":22},"模板采用分段整体吊装需保证整体性",{"key":28,"text":103,"correct":22},"高墩首节模板安装竖直度应严格控制",{"key":31,"text":105,"correct":22},"风力较大地区的高墩模板考虑抗风稳定性",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},903354,"下列关于墩台帽和盖梁施工的说法中正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"支架宜直接支承在承台以外的地基",{"key":24,"text":113,"correct":22},"盖梁与墩身连接处模板与墩台身应有间隙",{"key":28,"text":115,"correct":22},"支承在软弱地基上的支架不能施加预压力",{"key":31,"text":117,"correct":26},"支架等临时结构应进行受力分析计算与验算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},903355,"下列关于顶推法施工的说法中错误的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"钢导梁长度为顶推跨径0.6倍左右",{"key":24,"text":125,"correct":22},"顶推施工可分为单点顶推和多点顶推",{"key":28,"text":127,"correct":22},"顶推的梁体应在桥头逐段浇筑或拼装",{"key":31,"text":129,"correct":22},"桥台的后方需设置预制构件施工场地",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},903356,"下列关于转体施工和劲性骨架法施工的说法中正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"转体法分平转和竖转两种施工方法",{"key":24,"text":137,"correct":22},"转体法不适用于跨线桥等地形特殊情况",{"key":28,"text":139,"correct":22},"转体法工艺复杂、成本高、所需设备多",{"key":31,"text":141,"correct":22},"劲性骨架法属于大跨径拱桥有支架施工方法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},903357,"斜拉桥索塔的施工可视其结构、体形、材料、施工设备和设计综合考虑选用合适的方法。索塔现浇施工方法不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"翻模法",{"key":24,"text":149,"correct":22},"滑模法",{"key":28,"text":151,"correct":26},"悬拼法",{"key":31,"text":153,"correct":22},"爬模法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},903358,"斜拉桥的拉索按材料和制作方式的不同可分为不同形式，拉索形式不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"单股钢绞缆",{"key":24,"text":161,"correct":22},"封闭式钢缆",{"key":28,"text":163,"correct":22},"平行钢筋索",{"key":31,"text":165,"correct":26},"双股钢绞缆",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},903359,"锚碇和索塔完成、主索鞍和散索鞍安装就位、牵引系统架设完成后，即可进行主缆架设。下列关于斜拉桥主缆架设说法正确的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"PPWS法空中作业时间较长",{"key":24,"text":173,"correct":22},"AS法是在工厂将钢丝制成束",{"key":28,"text":175,"correct":26},"AS法所用的牵引机械动力较小",{"key":31,"text":177,"correct":22},"PPWS法对牵引系统所需动力要求较小",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},903360,"下列关于斜拉桥主缆索夹与吊索安装说法正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"索夹安装时中跨从塔顶向跨中进行",{"key":24,"text":185,"correct":26},"索夹安装时边跨从散索鞍向塔顶进行",{"key":28,"text":187,"correct":22},"索夹安装后需要测定主缆的空缆线形",{"key":31,"text":189,"correct":22},"吊索根据直径由塔顶起重机运至塔顶解开",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},903361,"下列关于加劲梁施工说法正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"钢桁架一般采用工地焊接连接施工",{"key":24,"text":197,"correct":22},"钢箱梁接头焊缝宜从桥面两侧向中轴线对称施焊",{"key":28,"text":199,"correct":22},"全铰接法架设接近设计线形后对全部铰接点逐固结",{"key":31,"text":201,"correct":26},"逐次固结法架设时宜在不同架设阶段用千斤顶调整吊索张力",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},903362,"圆管涵一般采用预制的钢筋混凝土管材，下列关于圆管涵说法错误的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"无特殊荷载时，管涵中心角一般采用90°",{"key":24,"text":209,"correct":26},"管节安装应从上游开始，使接头面向上游",{"key":28,"text":211,"correct":22},"安装方法通常有滚动安装法、滚木安装法等",{"key":31,"text":213,"correct":22},"圆管涵管壁厚度与孔径大小及其管顶填土高度有关",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},903363,"盖板涵有石盖板和钢筋混凝土盖板两种。目前，广泛采用的是钢筋混凝土盖板涵，下列关于钢筋混凝土盖板涵说法错误的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"矩形实心板预制宽度为2.00m",{"key":24,"text":221,"correct":22},"混凝土的强度等级不宜低于C20",{"key":28,"text":223,"correct":22},"板顶填土高度大于5.0m时应适当增加板厚和钢筋用量",{"key":31,"text":225,"correct":22},"盖板涵的安装工作可采用扒杆或汽车式起重机械等进行",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},903364,"拱式涵洞多为石拱涵，且一般都是采用半圆拱结构，下列关于石拱涵说法正确的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"不需耗用钢材",{"key":24,"text":233,"correct":22},"施工工艺要求较高",{"key":28,"text":235,"correct":22},"施工周期相对较短",{"key":31,"text":237,"correct":22},"对地基的承载力要求低，允许产生不均衡的沉降",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},903365,"将厚度为20～70mm的薄钢板板面压成波纹后，制成管节或板片修建成的涵洞称为波纹管涵或板通道，下列关于波纹管涵说法错误的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"波纹管涵是一种柔性结构",{"key":24,"text":245,"correct":26},"对地基沉降与变形要求严格",{"key":28,"text":247,"correct":22},"工程造价比同类跨径的桥涵低",{"key":31,"text":249,"correct":22},"楔形部及两侧的回填土很关键",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},903366,"下列关于预应力张拉说法正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"先张法台座的锚固横梁受力后挠度不大于5mm",{"key":24,"text":257,"correct":22},"实际伸长值与理论伸长值的差值为5%时应暂停张拉",{"key":28,"text":259,"correct":26},"实施张拉时千斤顶与锚具的中心线应位于同一轴线上",{"key":31,"text":261,"correct":22},"未防腐的预应力筋安装后至压浆的容许间隔时间为7天",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},903367,"下列关于后张法施工说法正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"管道接头并应缠裹紧密防止水泥浆渗入",{"key":24,"text":269,"correct":22},"长度大于50m的管道宜通过试验确定是否可正常压浆",{"key":28,"text":271,"correct":22},"管道应按设计规定的坐标位置进行安装，采用箍筋固定",{"key":31,"text":273,"correct":22},"采用蒸汽养护混凝土时，在养护完成前应安装预应力钢筋",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},903368,"下列关于后张法的张拉和锚固说法错误的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"预应力张拉前应进行摩阻测试",{"key":24,"text":281,"correct":22},"直线筋或螺纹筋可在一端张拉",{"key":28,"text":283,"correct":26},"预应力钢筋张拉锚固后应在24h内完成压浆",{"key":31,"text":285,"correct":22},"切割后预应力钢筋的外露长度不应小于30mm",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},903369,"钻孔灌注桩的桩位位于浅水区时，宜采用（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"筑岛法",{"key":24,"text":293,"correct":22},"搭设钢制平台",{"key":28,"text":295,"correct":22},"平整压实填土",{"key":31,"text":297,"correct":22},"浮式工作平台",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},903370,"钻孔灌注桩埋设护筒的要求不包括（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"护筒顶宜高于水面1～2m",{"key":24,"text":305,"correct":26},"护筒顶宜高于地面1～2m",{"key":28,"text":307,"correct":22},"内径应大于桩径至少200mm",{"key":31,"text":309,"correct":22},"护筒埋置深度在旱地宜为2～4m",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},903371,"下列关于钻孔灌注桩施工中钻孔和清底的说法中错误的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"开钻时应慢速钻进",{"key":24,"text":317,"correct":22},"清孔排渣时应保持孔内水位",{"key":28,"text":319,"correct":22},"冲击钻停钻时，应及时向孔内补水",{"key":31,"text":321,"correct":26},"旋挖钻钻进时泥浆面应始终不低于护筒底部",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":28,"analysis":33},903372,"下列关于钢筋笼吊装和混凝土灌注的说法中正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"导管的埋置深度宜控制在2～4m",{"key":24,"text":329,"correct":22},"安装钢筋骨架时可接将钢筋骨架支承在孔底",{"key":28,"text":331,"correct":26},"钢筋笼骨架外侧设置应控制保护层厚度的垫块",{"key":31,"text":333,"correct":22},"当桩径D＜1.5m时，其坍落度宜为160～200mm",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},903373,"下列关于砌体砌筑施工的说法中错误的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"砌块在使用前必须浇水湿润",{"key":24,"text":341,"correct":26},"基底为岩层可直接坐浆砌筑",{"key":28,"text":343,"correct":22},"相邻工作段砌筑差不宜超过1.2m",{"key":31,"text":345,"correct":22},"分段位置尽量设在沉降缝、伸缩缝处",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},903374,"桥梁上部结构的施工方法的种类较多，大致可分为预制安装和现浇两大类，预制安装类不包括（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"预制梁安装",{"key":24,"text":353,"correct":22},"预制节段式块件",{"key":28,"text":355,"correct":22},"整跨箱梁预制吊装",{"key":31,"text":357,"correct":26},"预制桥墩、桥台安装",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},903375,"下列关于桥梁上部结构预制安装施工说法错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"当桥址为深谷、急流时采用缆索吊装法架设",{"key":24,"text":365,"correct":22},"海上长大桥梁的架设安装可采用浮吊架设法",{"key":28,"text":367,"correct":26},"30m跨径的陆上预制梁架设可采用自行式吊车",{"key":31,"text":369,"correct":22},"节段式预应力混凝土连续梁架设可采用逐孔拼装法",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},903376,"悬臂拼装法是悬臂施工法的一种，其优点不包括（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"平行作业缩短建桥周期",{"key":24,"text":377,"correct":22},"梁体的收缩和徐变减小",{"key":28,"text":379,"correct":22},"有利于整体施工质量控制",{"key":31,"text":381,"correct":26},"梁体预制延长了建桥周期",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},903377,"固定支架法是指在桥跨间设置支架、安装模板、绑扎钢筋、现场浇筑混凝土的施工方法，其施工特点不包括（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"施工平稳可靠",{"key":24,"text":389,"correct":26},"需要大型起吊设备",{"key":28,"text":391,"correct":22},"需要大量施工支架",{"key":31,"text":393,"correct":22},"施工中无体系转换",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},903378,"下列关于逐孔现浇法的说法中正确的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"满布式用于陆地或通航河道上",{"key":24,"text":401,"correct":22},"移动模架法适用的桥梁跨径可达70m",{"key":28,"text":403,"correct":22},"移动模架按行走方式分为自行式和上行式",{"key":31,"text":405,"correct":26},"移动模架按底模安拆方式分为平开合式、翻转式",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},903379,"关于斜拉桥的拉索施工说法不正确的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"张拉机具能力应大于最大拉索拉力",{"key":24,"text":413,"correct":26},"拉索可在塔端或梁端两侧进行张拉",{"key":28,"text":415,"correct":22},"索塔横桥向两侧张拉应对称同步进行",{"key":31,"text":417,"correct":22},"两侧不对称拉索应按设计规定的索力分级同步张拉",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},903380,"悬索桥是利用主缆和吊索作为加劲梁的悬吊体系，其特点不包括（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"受力合理",{"key":24,"text":425,"correct":22},"造价经济",{"key":28,"text":427,"correct":22},"最大限度发挥材料强度",{"key":31,"text":429,"correct":26},"跨越能力小",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},903381,"悬索桥是跨越千米以上障碍物最理想的桥型，其施工的一般步骤为（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"索塔、锚碇基础→索塔、锚碇→上部结构→桥面系",{"key":24,"text":437,"correct":22},"索塔、锚碇基础→上部结构→索塔、锚碇→桥面系",{"key":28,"text":439,"correct":22},"索塔、锚碇→索塔、锚碇基础→上部结构→桥面系",{"key":31,"text":441,"correct":22},"索塔、锚碇→索塔、锚碇基础→桥面系→上部结构",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},903382,"锚碇是悬索桥的主要承重构件，主要抵抗来自主缆的拉力，并传递给基地基础，按受力形式分类不包括（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"岩锚",{"key":24,"text":449,"correct":22},"隧道式锚碇",{"key":28,"text":451,"correct":22},"重力式锚碇",{"key":31,"text":453,"correct":26},"土钉式锚碇",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},903383,"锚碇按受力形式的不同可分为重力式锚碇、隧道式锚碇和岩锚等，岩锚与隧道锚的主要区别不包括（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"岩锚预应力筋分散锚固",{"key":24,"text":461,"correct":22},"岩锚不需要浇筑锚塞体",{"key":28,"text":463,"correct":26},"隧道锚不需要浇筑锚塞体",{"key":31,"text":465,"correct":22},"隧道锚采用集中锚固方式",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},903384,"下列关于悬索桥索塔施工说法错误的是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"大跨度悬索桥国内主要采用钢筋混凝土塔",{"key":24,"text":473,"correct":22},"安装索鞍必须满足高空吊装重物的安全要求",{"key":28,"text":475,"correct":22},"索塔完工后，须测定桥塔倾斜度和塔顶高程",{"key":31,"text":477,"correct":26},"塔顶钢框架必须在索塔上系梁施工前完成安装",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},903385,"主缆架设工程包括架设前的准备工作、主缆架设、防护和收尾工作等，下列关于斜拉桥主缆施工说法错误的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"猫道承重索的安全系数不小于2.0",{"key":24,"text":485,"correct":22},"牵引系统承担猫道架设、主缆架设等工作",{"key":28,"text":487,"correct":22},"猫道中跨两端分别锚于两索塔的锚固位置上",{"key":31,"text":489,"correct":22},"牵引系统通常利用先导索将牵引索由空中架设",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},903386,"ETC车道系统中，固定安装方式的路侧设备应支持户外安装，宜采用（ ）安装方式。",[494,496,498,500],{"key":20,"text":495,"correct":22},"埋地",{"key":24,"text":497,"correct":26},"顶挂",{"key":28,"text":499,"correct":22},"附着",{"key":31,"text":501,"correct":22},"路侧",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},903387,"供配电及照明设施电缆线路的敷设要求说法正确的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"直埋电缆的埋深不应小于0.5m",{"key":24,"text":509,"correct":22},"直埋电缆的上、下部应铺以不小于100mm厚的碎石",{"key":28,"text":511,"correct":22},"管道敷设时，电缆管内径与电缆外径之比不得大于1.5",{"key":31,"text":513,"correct":26},"电缆在沟内敷设时，应遵循低压在下、高压在上的原则",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},903388,"具备逆反射性能的为（ ）类突起路标。",[518,519,520,521],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},903389,"路侧护栏的A级立柱的中心间距为（ ）m。",[526,528,530,532],{"key":20,"text":527,"correct":22},"1",{"key":24,"text":529,"correct":22},"2",{"key":28,"text":531,"correct":22},"3",{"key":31,"text":533,"correct":26},"4",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},903390,"下列关于防眩设施与视线诱导设施的说法错误的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"防眩设施施工首先保证遮光角和防眩高度要求",{"key":24,"text":541,"correct":22},"防眩板不得出现扭曲、固定不牢固的现象",{"key":28,"text":543,"correct":26},"同一类型视线诱导设施安装高度可以不一致",{"key":31,"text":545,"correct":22},"波形梁护栏设置诱导标时应注意与护栏施工的衔接",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},903391,"下列关于通信设备敷设电源线要求说法正确的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"电源线中间允许有接头",{"key":24,"text":553,"correct":26},"交、直流电源的馈电电缆必须分开布设",{"key":28,"text":555,"correct":22},"电源线与设备端子连接时应使端子受到机械压力",{"key":31,"text":557,"correct":22},"胶皮绝缘线做直流馈电线时每对馈电线应保持垂直",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":28,"analysis":33},903392,"下列关于通信设备接地装置要求说法正确的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"改建局站应采用联合接地装置",{"key":24,"text":565,"correct":22},"通信设备机壳不需做保护接地",{"key":28,"text":567,"correct":26},"接地汇集装置应有明显的标志",{"key":31,"text":569,"correct":22},"设备与汇集线之间可采用裸导线",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},903393,"下列关于动力设备的安装要求说法正确的是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":26},"动力设备的可接近裸露导体必须接地或接零",{"key":24,"text":577,"correct":22},"电动机安装完成可直接负载运行",{"key":28,"text":579,"correct":22},"电动机等绝缘电阻值应小于0.5MΩ",{"key":31,"text":581,"correct":22},"接线盒内裸露不同相导线间最小距离应大于10mm",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},903394,"下列关于配电工程中钢管敷设要求说法正确的是（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"明配钢管与盒（箱）连接应采用螺纹连接",{"key":24,"text":589,"correct":26},"镀锌钢管和薄壁钢管应采用螺纹连接或套管紧定螺钉连接",{"key":28,"text":591,"correct":22},"钢管的内壁、外壁不必做防腐处理",{"key":31,"text":593,"correct":22},"潮湿场所和直埋于地下时应采用薄壁钢管",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":28,"analysis":33},903395,"常用的路基护栏有钢筋混凝土护栏、波形梁护栏、缆索护栏等，下列关于钢筋混凝土护栏的说法正确的是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"一般只用于一级和二级公路",{"key":24,"text":601,"correct":22},"护栏的安装应从两端逐步中间推进",{"key":28,"text":603,"correct":26},"曲线路段护栏布设应圆滑",{"key":31,"text":605,"correct":22},"预制混凝土护栏块的模板应采用木模板",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":20,"analysis":33},903396,"交通标志是主要的公路交通安全设施，下列关于交通标志的施工要求说法错误的是（ ）。",[610,612,614,616],{"key":20,"text":611,"correct":26},"加工支撑结构时应保证镀锌在钻孔之前完成",{"key":24,"text":613,"correct":22},"标志面板架设时不允许出现过度偏转或后仰",{"key":28,"text":615,"correct":22},"浇筑标志基础前应特别注意大型标志的可实施性",{"key":31,"text":617,"correct":22},"加工标志板前应根据公路实际情况复核图纸",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]