[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,13,50,1453,[13,34,46,58,70,82,94,106,118,130,140,152,164,176,188,200,212,224,236,248,260,271,283,295,307,319,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,534,546,558,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},903297,1,"单选题","隧道围岩为坚硬岩，岩体较完整，块状或厚层状结构，其围岩基本质量指标为550～451MPa，该围岩属于（ ）级。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","Ⅰ",false,{"key":24,"text":25,"correct":26},"B","Ⅱ",true,{"key":28,"text":29,"correct":22},"C","Ⅲ",{"key":31,"text":32,"correct":22},"D","Ⅳ","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},903298,"先开挖隧道两侧的导坑，并进行初期支护，再分部开挖剩余部分，一般适用于浅埋大跨度隧道及地表下沉量要求严格而围岩条件很差的情况的隧道施工方法是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"台阶法",{"key":24,"text":41,"correct":22},"环形开挖预留核心土法",{"key":28,"text":43,"correct":22},"中隔壁法（CD法）",{"key":31,"text":45,"correct":26},"双侧壁导坑法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},903299,"二次衬砌是隧道工程施工在初期支护内侧施作的模筑混凝土或钢筋混凝土衬砌，二次衬砌施作时间应满足的条件不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"各测试项目所显示的位移率明显减缓并已基本稳定",{"key":24,"text":53,"correct":22},"拱顶下沉速率小于0.07～0.15mm\u002F天",{"key":28,"text":55,"correct":26},"周边位移速率小于0.05～0.25mm\u002F天",{"key":31,"text":57,"correct":22},"已产生的各项位移已达预计位移量的80%～90%",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},903300,"隧道初期支护措施，应紧随开挖面及时施作，确保施工安全。下列关于初期支护说法错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"Ⅳ级围岩必要时可加设钢支撑",{"key":24,"text":65,"correct":26},"Ⅲ级围岩支护可采用局部锚杆",{"key":28,"text":67,"correct":22},"钢支撑常用于软弱破碎围岩隧道中",{"key":31,"text":69,"correct":22},"喷射混凝土作为永久支护的部位时，钢筋网是唯一被批准的配筋形式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},903301,"当位移-时间曲线出现反弯点时，则表明围岩和支护已呈（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"稳定状态",{"key":24,"text":77,"correct":22},"平衡状态",{"key":28,"text":79,"correct":22},"临界状态",{"key":31,"text":81,"correct":26},"不稳定状态",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},903302,"隧道开挖应遵循“短进尺、强支护、弱爆破、勤观测”的原则进行开挖掘进，下列关于隧道开挖要求说法正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"应严格控制超挖，尽量减少欠挖",{"key":24,"text":89,"correct":22},"采用台阶法施工时，台阶不宜分层过少",{"key":28,"text":91,"correct":22},"采用复合式衬砌时，不需适当预留变形量",{"key":31,"text":93,"correct":26},"所有开挖应按设计标明的开挖线进行施工，并一次挖够",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},903303,"岩体基本质量指标BQ需进行修正情况不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"有地下水",{"key":24,"text":101,"correct":22},"存在高初始应力",{"key":28,"text":103,"correct":26},"无高初始应力存在",{"key":31,"text":105,"correct":22},"围岩稳定性受软弱结构面影响，且由一组起控制作用",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},903304,"下列关于隧道施工方法说法不正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"明挖法适用于埋置较浅的工程",{"key":24,"text":113,"correct":26},"矿山法施工进度快、建设周期短",{"key":28,"text":115,"correct":22},"掘进机是开挖与出渣联合作业的掘进机械",{"key":31,"text":117,"correct":22},"初次柔性支护在洞身开挖之后必须立即进行",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},903305,"当隧道埋深较浅，上覆岩（土）体较薄，难以采用暗挖法时，则应采用（ ）来开挖隧道。",[122,124,126,128],{"key":20,"text":123,"correct":22},"新奥法",{"key":24,"text":125,"correct":26},"明挖法",{"key":28,"text":127,"correct":22},"传统的矿山法",{"key":31,"text":129,"correct":22},"盖挖法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},903306,"根据隧道穿越地层的不同情况和目前隧道施工技术的发展，山岭隧道的支护方法不包括（ ）。",[134,135,136,138],{"key":20,"text":123,"correct":22},{"key":24,"text":129,"correct":26},{"key":28,"text":137,"correct":22},"掘进机法",{"key":31,"text":139,"correct":22},"传统矿山法",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":28,"analysis":33},903307,"下列关于隧道施工的特点说法错误的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":22},"工作条件差",{"key":24,"text":147,"correct":22},"工作面小而狭窄",{"key":28,"text":149,"correct":26},"受工程地质影响较小",{"key":31,"text":151,"correct":22},"需妥善处理大量废渣",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":31,"analysis":33},903308,"新奥法是奥地利学者从长期的隧道施工实践中从岩体力学的观点出发而提出的一种合理施工的方法，下列关于新奥法说法不正确的是（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"充分发挥围岩的自承能力",{"key":24,"text":159,"correct":22},"采用毫秒爆破和光面爆破技术",{"key":28,"text":161,"correct":22},"以喷射混凝土和锚杆作为主要支护手段",{"key":31,"text":163,"correct":26},"新奥法施工工序可划分为开挖、喷锚和装饰",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},903309,"隧道围岩分级是设计、施工的基础，围岩初步分级的依据不包括（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"岩石的坚硬程度",{"key":24,"text":171,"correct":22},"岩体完整程度",{"key":28,"text":173,"correct":22},"岩体基本质量指标",{"key":31,"text":175,"correct":26},"岩体基本成分指标",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},903310,"隧道开挖掘进工作面的炮眼中，作用是将开挖面上某一部位的岩石掏出一个槽，为其他炮眼的爆破创造有利条件的为（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"掏槽眼",{"key":24,"text":183,"correct":22},"辅助眼",{"key":28,"text":185,"correct":22},"周边眼",{"key":31,"text":187,"correct":22},"周边眼和辅助眼",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},903311,"下列关于钻爆作业说法正确的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"预裂爆破法可以只在眼口堵塞",{"key":24,"text":195,"correct":22},"周边眼堵塞长度不宜大于200mm",{"key":28,"text":197,"correct":22},"软岩地段周边眼以一次起爆为宜",{"key":31,"text":199,"correct":26},"爆破后应设专人负责“清帮清顶”",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},903312,"连拱隧道主要适用于洞口地形狭窄，或对两洞间距有特殊要求的中、短隧道。下列关于连拱隧道施工说法错误的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"爆破的装药量应予严格控制",{"key":24,"text":207,"correct":22},"主洞上拱部的开挖应慎重施工",{"key":28,"text":209,"correct":26},"中隔墙施工是隧洞开挖的关键",{"key":31,"text":211,"correct":22},"三导坑开挖，先挖中导坑再侧导坑",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},903313,"机械通风按照风道的类型和通风机安装位置分为风管式通风、巷道式通风、风墙式通风。一般隧道通风采用（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"风管式通风",{"key":24,"text":219,"correct":22},"巷道式通风",{"key":28,"text":221,"correct":22},"风墙式通风",{"key":31,"text":223,"correct":22},"风板式通风",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},903314,"下列关于供电线路布置和安装要求说法错误的是（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"竖井内的电气装置应采用双回路输电",{"key":24,"text":231,"correct":22},"施工地段的临时电线路宜采用橡套电缆",{"key":28,"text":233,"correct":22},"成洞地段固定的电线路应使用绝缘胶皮线",{"key":31,"text":235,"correct":26},"瓦斯地段宜使用煤矿专用密封阻燃铜芯电缆",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":31,"analysis":33},903315,"隧道施工的临时防、排水应与永久防、排水设施相结合，下列关于防排水措施说法错误的是（ ）。",[240,242,244,246],{"key":20,"text":241,"correct":22},"洞内应顺坡排水，其坡度与线路坡度一致",{"key":24,"text":243,"correct":22},"洞内水位较高时，可采用井点降水法处理",{"key":28,"text":245,"correct":22},"浇筑二次衬砌前发现防水层有破损必须进行处理",{"key":31,"text":247,"correct":26},"塑料止水带，其接头形式应采用搭接或复合接",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},903316,"隧道洞口与明洞工程应按照隧道施工组织设计的顺序安排，按设计要求应先施工完成，下列关于洞口和明洞工程施工说法正确的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"洞口土石方开挖可采用大爆破以缩短工期",{"key":24,"text":255,"correct":26},"洞门端墙的砌筑与墙背回填应两侧同时进行",{"key":28,"text":257,"correct":22},"明洞段顶部回填土方每层厚度不得小于0.3m",{"key":31,"text":259,"correct":22},"当明洞与暗洞衔接时，施工宜采用先墙后拱法",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},903317,"适用于浅埋大跨度隧道及地表下沉量要求严格而围岩条件很差的公路隧道的开挖方式为（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"中导洞法",{"key":24,"text":267,"correct":22},"中隔壁法",{"key":28,"text":269,"correct":22},"全断面法",{"key":31,"text":45,"correct":26},{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},903318,"超前支护措施的选用应视围岩条件、涌水状况、施工方法、环境要求等情况而定，适用于围岩压力来得快、来得大的支护方式是（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"超前锚杆",{"key":24,"text":278,"correct":26},"管棚支护",{"key":28,"text":280,"correct":22},"预注浆方法",{"key":31,"text":282,"correct":22},"超前小导管",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},903319,"隧道仰拱或二次衬砌到掌子面的安全距离称为隧道安全步距，下列关于安全步距说法错误的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"Ⅲ级围岩仰拱与掌子面的距离不得超过90m",{"key":24,"text":290,"correct":22},"Ⅳ级围岩仰拱与掌子面的距离不得超过50m",{"key":28,"text":292,"correct":22},"Ⅴ级围岩二次衬砌距掌子面的距离不得大于70m",{"key":31,"text":294,"correct":26},"Ⅳ级围岩二次衬砌距掌子面的距离不得大于70m",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":28,"analysis":33},903320,"超前预报的主要内容不包括（ ）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"地质条件变化情况及对施工的影响程度",{"key":24,"text":302,"correct":22},"可能出现塌方、滑动的部位及发展趋势",{"key":28,"text":304,"correct":26},"当地气候变化情况及对施工的影响程度",{"key":31,"text":306,"correct":22},"可能出现突然涌水的地点及对施工的影响",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":28,"analysis":33},903321,"下列隧道现场监控量测项目中，属于必测项目的是（ ）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"围岩压力",{"key":24,"text":314,"correct":22},"锚杆轴力",{"key":28,"text":316,"correct":26},"周边位移",{"key":31,"text":318,"correct":22},"爆破震动",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},903322,"下列隧道监控量测项目中，属于选测项目的是（ ）。",[323,324,326,328],{"key":20,"text":316,"correct":22},{"key":24,"text":325,"correct":22},"拱顶下沉",{"key":28,"text":327,"correct":26},"钢架内力及外力",{"key":31,"text":329,"correct":22},"地质和支护状况观察",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},903323,"对高度大于（ ）的桥墩，在钢筋安装时宜设置劲性骨架。",[334,336,338,340],{"key":20,"text":335,"correct":22},"20m",{"key":24,"text":337,"correct":26},"30m",{"key":28,"text":339,"correct":22},"40m",{"key":31,"text":341,"correct":22},"50m",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},903324,"对设计为漂浮或半漂浮体系的斜拉桥，在主梁施工期间应（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"保持设计状态",{"key":24,"text":349,"correct":26},"使塔梁临时固结",{"key":28,"text":351,"correct":22},"使塔梁永久固结",{"key":31,"text":353,"correct":22},"使塔梁处于自由状态",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},903325,"混凝土抗压强度评定时，某组三个试块得到的强度为40.5MPa、51MPa、61MPa，则该组的评定值为（ ）Mpa。",[358,360,362,364],{"key":20,"text":359,"correct":22},"40.5",{"key":24,"text":361,"correct":22},"51",{"key":28,"text":363,"correct":22},"61",{"key":31,"text":365,"correct":26},"无效",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},903326,"基坑顶面应设置防止地面水流入基坑的设施，基顶有动荷载时，其边缘与动荷载之间应留有不小于（ ）m宽的护道。",[370,372,374,376],{"key":20,"text":371,"correct":26},"1",{"key":24,"text":373,"correct":22},"1.5",{"key":28,"text":375,"correct":22},"2",{"key":31,"text":377,"correct":22},"5",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},903327,"锚体嵌入地基基岩内，借助基岩抵抗主缆拉力的锚碇为（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"重力式锚碇",{"key":24,"text":385,"correct":26},"隧道式锚碇",{"key":28,"text":387,"correct":22},"岩锚",{"key":31,"text":389,"correct":22},"索锚",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},903328,"片石混凝土墩台中，片石的体积不多于该结构体积的（ ）",[394,396,398,400],{"key":20,"text":395,"correct":26},"20%",{"key":24,"text":397,"correct":22},"30%",{"key":28,"text":399,"correct":22},"40%",{"key":31,"text":401,"correct":22},"50%",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},903329,"施加预应力时，实际伸长值与理论伸长值的差值应控制在（ ）以内，否则应暂停张拉，查明原因并调整。",[406,408,410,412],{"key":20,"text":407,"correct":22},"±3%",{"key":24,"text":409,"correct":22},"±4%",{"key":28,"text":411,"correct":22},"±5%",{"key":31,"text":413,"correct":26},"±6%",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},903330,"挖孔灌注桩孔口处应设置高出地面至少（ ）mm的护圈。",[418,420,422,424],{"key":20,"text":419,"correct":22},"100",{"key":24,"text":421,"correct":22},"200",{"key":28,"text":423,"correct":26},"300",{"key":31,"text":425,"correct":22},"500",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},903331,"为悬索桥的主要承重构件，主要抵抗来自主缆的拉力，并传递给地基基础的结构是（ ）",[430,432,434,436],{"key":20,"text":431,"correct":22},"索塔",{"key":24,"text":433,"correct":22},"索鞍",{"key":28,"text":435,"correct":26},"锚碇",{"key":31,"text":437,"correct":22},"吊索",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},903332,"下列属于悬索桥上部结构安装内容的有（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"塔身及锚体施工",{"key":24,"text":445,"correct":26},"主、散索鞍安装",{"key":28,"text":447,"correct":22},"加劲梁节段安装",{"key":31,"text":449,"correct":22},"桥面铺装",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},903333,"下图中的中心角角度，在无特殊荷载时，一般采用（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"45°",{"key":24,"text":457,"correct":26},"90°",{"key":28,"text":459,"correct":22},"135°",{"key":31,"text":461,"correct":22},"180°",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},903334,"斜拉桥索塔施工中，使用最多的模板是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"翻模法",{"key":24,"text":469,"correct":22},"滑模法",{"key":28,"text":471,"correct":26},"爬模法",{"key":31,"text":473,"correct":22},"吊挂模板",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},903335,"悬索桥的防腐涂装说法错误的是（ ）",[478,480,482,484],{"key":20,"text":479,"correct":22},"主缆防护应在桥面铺装完成后进行",{"key":24,"text":481,"correct":22},"缠丝工作宜在二期恒载作用于主缆之后进行",{"key":28,"text":483,"correct":22},"缠丝材料以选用软质镀锌钢丝为宜，缠丝工作应由电动缠丝机完成",{"key":31,"text":485,"correct":26},"工地焊接的表面补涂油漆应在表面除锈48h内进行，分层补涂底漆和面漆，并达到设计的漆膜总厚度",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},903336,"一般只适宜用于桥墩高度不大于15m、无常流水、河床干涸又平坦的梁板式桥梁安装工作的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"自行式吊装设备吊装法",{"key":24,"text":493,"correct":26},"跨墩龙门安装法",{"key":28,"text":495,"correct":22},"架桥机安装法",{"key":31,"text":497,"correct":22},"扒杆吊装法",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},903337,"预应力钢筋张拉锚固后，孔道应尽早压浆，且应在（ ）h内完成",[502,504,506,508],{"key":20,"text":503,"correct":22},"12",{"key":24,"text":505,"correct":22},"24",{"key":28,"text":507,"correct":22},"28",{"key":31,"text":509,"correct":26},"48",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},903338,"轴心受拉和小偏心受拉构件不应采用（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"闪光对焊",{"key":24,"text":517,"correct":22},"机械连接",{"key":28,"text":519,"correct":26},"绑扎连接",{"key":31,"text":521,"correct":22},"电弧焊",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},903339,"钻孔灌注桩灌注水下混凝土的技术要求说法正确的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"当桩径D＜1.5m时，其坍落度宜为160～200mm",{"key":24,"text":529,"correct":22},"桩径D>1.5m时，坍落度宜为180～220mm",{"key":28,"text":531,"correct":22},"首批灌注混凝土的数量应能满足导管首次埋置深度0.3m以上",{"key":31,"text":533,"correct":26},"在灌注中，应保持孔内的水头高度，导管的埋置深度宜控制在2～6m",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},903340,"钻孔灌注桩护筒宜采用钢板卷制，护筒顶宜高于地面（ ）m",[538,540,542,544],{"key":20,"text":539,"correct":22},"0.1",{"key":24,"text":541,"correct":22},"0.2",{"key":28,"text":543,"correct":26},"0.3",{"key":31,"text":545,"correct":22},"0.4",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},903341,"采用泵送时，泵送间隔时间不宜超过（ ）",[550,552,554,556],{"key":20,"text":551,"correct":26},"15min",{"key":24,"text":553,"correct":22},"20min",{"key":28,"text":555,"correct":22},"30min",{"key":31,"text":557,"correct":22},"60min",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},903342,"外露面的模板板面宜采用钢模板、胶合板。为减少模板的拼缝，对于大面积的混凝土，其每块模板的面积宜大于（ ）㎡。",[562,564,566,567],{"key":20,"text":563,"correct":22},"0.5",{"key":24,"text":565,"correct":26},"1.0",{"key":28,"text":373,"correct":22},{"key":31,"text":568,"correct":22},"2.0",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},903343,"绑扎接头仅当钢筋构造施工困难时方可采用，直径不宜大于（ ）mm，对轴心受压或偏心受压构件中的受压钢筋可不大于（ ）mm",[573,575,577,579],{"key":20,"text":574,"correct":22},"25；28",{"key":24,"text":576,"correct":22},"25；32",{"key":28,"text":578,"correct":26},"28；32",{"key":31,"text":580,"correct":22},"32；28",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},903344,"混凝土抗压强度应以边长150mm的立方体标准试件测定，保证率95%，试件以同龄期3个为一组，每组试件抗压强度以3个试件测值的算术平均值为测定值（精确至0.1MPa），当有1个测值与中间值的差值超中间值15%时（ ）",[585,587,589,591],{"key":20,"text":586,"correct":22},"该组试验无效",{"key":24,"text":588,"correct":26},"取中间值为测定值",{"key":28,"text":590,"correct":22},"取最小值为测定值",{"key":31,"text":592,"correct":22},"取平均值为测定值",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":28,"analysis":33},903345,"下列关于大体积混凝土施工说法错误的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"选用低水化热和凝结时间长的水泥",{"key":24,"text":600,"correct":22},"温度控制宜按照“内降外保”原则",{"key":28,"text":602,"correct":26},"大体积混凝土浇筑宜在气温较高时进行",{"key":31,"text":604,"correct":22},"分层浇筑上下层混凝土温差不宜大于20℃",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":31,"analysis":33},903346,"模板、拱架和支架均应进行施工图设计，经批准后方可用于施工。其设计原则不包括（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"制作装拆方便",{"key":24,"text":612,"correct":22},"接缝严密不漏浆",{"key":28,"text":614,"correct":22},"需验算刚度及稳定性",{"key":31,"text":616,"correct":26},"优先使用胶合板和木模板",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]