[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":604},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,12,50,1453,[13,34,46,58,70,82,94,106,118,130,138,150,162,174,186,198,210,222,232,244,256,268,280,292,304,316,328,337,349,360,372,384,395,407,417,429,441,451,463,475,487,499,511,523,535,545,556,568,580,592],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},903246,1,"单选题","填方路基施工中，土质路堤填料的最大粒径应小于（ ）mm。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","50",false,{"key":24,"text":25,"correct":22},"B","100",{"key":27,"text":28,"correct":29},"C","150",true,{"key":31,"text":32,"correct":22},"D","200","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},903247,"路面结构层包括面层、垫层、基层、底基层，从上到下排序正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"面层、基层、底基层、垫层",{"key":24,"text":41,"correct":22},"面层、垫层、基层、底基层",{"key":27,"text":43,"correct":22},"面层、垫层、底基层、基层",{"key":31,"text":45,"correct":22},"面层、基层、垫层、底基层",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},903248,"在多雨地区，梯形边沟每段长度不宜超过______m，三角形边沟不宜超过______m（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"200；300",{"key":24,"text":53,"correct":22},"200；100",{"key":27,"text":55,"correct":22},"100；200",{"key":31,"text":57,"correct":29},"300；200",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},903249,"公路工程中的路基施工内容不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"路基施工技术准备",{"key":24,"text":65,"correct":22},"路基土石方工程",{"key":27,"text":67,"correct":22},"排水工程",{"key":31,"text":69,"correct":29},"路基加固工程",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},903250,"下列关于石质路堑施工中路床清理及验收的相关说法不正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"超挖部分应采用细粒土找平",{"key":24,"text":77,"correct":22},"欠挖部分必须凿除",{"key":27,"text":79,"correct":22},"设置渗沟排导地下水的，渗沟应用坚硬碎石回填",{"key":31,"text":81,"correct":22},"石质路床的边沟应与路床同步施工",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},903251,"挖方路基施工中，土质路堑的施工工艺中包括：①路槽整修；②开挖截水沟；③边坡修理；④开挖边沟。正确的排序是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"②—①—④—③",{"key":24,"text":89,"correct":29},"②—③—④—①",{"key":27,"text":91,"correct":22},"①—②—③—④",{"key":31,"text":93,"correct":22},"①—③—②—④",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},903252,"土质路堑的开挖方法不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"横向挖掘法",{"key":24,"text":101,"correct":29},"斜向挖掘法",{"key":27,"text":103,"correct":22},"纵向挖掘法",{"key":31,"text":105,"correct":22},"混合式挖掘法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},903253,"单层横向全宽挖掘法适用于挖掘（ ）的土质路堑。",[110,112,114,116],{"key":20,"text":111,"correct":29},"浅且短",{"key":24,"text":113,"correct":22},"深且短",{"key":27,"text":115,"correct":22},"长且一侧堑壁较薄",{"key":31,"text":117,"correct":22},"深且长",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},903254,"综合爆破施工技术中，最省工，省药的一种方法是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"钢钎炮",{"key":24,"text":125,"correct":22},"深孔爆破",{"key":27,"text":127,"correct":29},"药壶炮",{"key":31,"text":129,"correct":22},"猫洞炮",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},903255,"在有裂缝的坚石中，阶梯高度大于4m时，采用（ ）爆破方法，可以获得好的爆破效果。",[134,135,136,137],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":22},{"key":31,"text":129,"correct":29},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},903256,"高速公路、一级公路和铺设高级路面的其他等级公路的填石路堤采用（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"倾填法",{"key":24,"text":145,"correct":29},"碾压法",{"key":27,"text":147,"correct":22},"冲击压实法",{"key":31,"text":149,"correct":22},"强力夯实法",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},903257,"路基填料的强度指标是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"压实度",{"key":24,"text":157,"correct":29},"CBR值",{"key":27,"text":159,"correct":22},"稳定度",{"key":31,"text":161,"correct":22},"塑性指数",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},903258,"土石路堤采用推土机铺填时，每层松铺厚度不宜超过（ ）cm。",[166,168,170,172],{"key":20,"text":167,"correct":22},"30",{"key":24,"text":169,"correct":29},"40",{"key":27,"text":171,"correct":22},"10",{"key":31,"text":173,"correct":22},"20",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":27,"analysis":33},903259,"软土地基的浅层处置方法不包括（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"换填法",{"key":24,"text":181,"correct":22},"抛石挤淤",{"key":27,"text":183,"correct":29},"缝接法",{"key":31,"text":185,"correct":22},"爆炸挤淤",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},903260,"下列不属于滑坡防治工程措施的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"滑坡排水",{"key":24,"text":193,"correct":29},"植树造林",{"key":27,"text":195,"correct":22},"力学平衡",{"key":31,"text":197,"correct":22},"改变滑带土",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},903261,"用以支挡边坡、保持土体稳定、加强路基强度和稳定性、避免边坡在水流条件变化时发生破坏的工程称做（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"路基防护工程",{"key":24,"text":205,"correct":22},"路基排水工程",{"key":27,"text":207,"correct":29},"路基支档工程",{"key":31,"text":209,"correct":22},"挡土墙",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},903262,"下列关于边坡锚固防护施工的说法不符合规定的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"锚固端灌浆中，黏结锚索孔灌浆宜一次注满锚固段和自由段",{"key":24,"text":217,"correct":22},"锚索张拉设备标定间隔期不宜超过6个月",{"key":27,"text":219,"correct":29},"锚索束制作安装时，下料应采用机械切割或者电弧切割",{"key":31,"text":221,"correct":22},"封孔灌浆时，进浆管必须插到底，灌浆必须饱满",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},903263,"一般公路中，底基层比面层宽（ ）cm。",[226,227,229,231],{"key":20,"text":173,"correct":22},{"key":24,"text":228,"correct":29},"25",{"key":27,"text":230,"correct":22},"15",{"key":31,"text":171,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},903264,"石灰稳定土底基层、基层可采用路拌法或厂拌法施工。其中，路拌法施工流程为（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":29},"基层清理→摊铺→拌和→压实→养护",{"key":24,"text":239,"correct":22},"基层清理→摊铺→养护→拌和→压实",{"key":27,"text":241,"correct":22},"基层清理→拌和→摊铺→压实→养护",{"key":31,"text":243,"correct":22},"基层清理→拌和→摊铺→养护→压实",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},903265,"粒料类基层按强度构成原理可分为嵌锁型与级配型。下列关于粒料类基层施工说法正确的是（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"填隙碎石基层施工前填隙料应用水润湿",{"key":24,"text":251,"correct":22},"级配碎（砾）石基层碾压时遵循先重后轻的原则",{"key":27,"text":253,"correct":22},"粒料类基层未洒透层沥青或未铺封层时可直接开放交通",{"key":31,"text":255,"correct":29},"填隙碎石基层单层压实厚度宜为公称最大直径的1.5～2倍",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":31,"analysis":33},903266,"沥青稳定类基层包括热拌沥青碎石、贯入式沥青碎石、乳化沥青碎石混合料基层等。下列关于沥青稳定类基层施工说法错误的是（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"施工前，承包人应做200m的试验路段",{"key":24,"text":263,"correct":22},"机械摊铺的混合料，不应用人工反复修整",{"key":27,"text":265,"correct":22},"沥青混合料的分层压实厚度不得大于10cm",{"key":31,"text":267,"correct":29},"压路机应从中心向外侧碾压，相邻碾压带应重叠1\u002F3～1\u002F2轮宽",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},903268,"下列关于热拌沥青混合料路面施工说法正确的是（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"表面层采用走线法施工",{"key":24,"text":275,"correct":29},"铺前将摊铺机的熨平板加热至不低于65℃",{"key":27,"text":277,"correct":22},"初压采用胶轮压路机和双轮双振压路机碾压1～2遍",{"key":31,"text":279,"correct":22},"碾压顺纵向由高边向低边按规定要求的碾压速度均匀进行",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":27,"analysis":33},903269,"下列关于水泥混凝土路面施工说法正确的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"施工模板应采用木模板以降低造价",{"key":24,"text":287,"correct":22},"纵横曲线路段每块横板中点应安装在曲线终点上",{"key":27,"text":289,"correct":29},"横向连接摊铺时侧边缺少的拉杆应钻孔锚固植入",{"key":31,"text":291,"correct":22},"模板拆除应在混凝土抗压强度不小于10MPa时方可进行",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},903270,"水泥混凝土路面施工时，当一次铺筑宽度小于路面和硬路肩总宽度时，应设纵向施工缝，下列关于纵缝施工说法错误的是（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"纵向施工缝位置应重合或靠近车道线",{"key":24,"text":299,"correct":29},"纵缝拉杆应采用光面钢筋，设在板厚中央",{"key":27,"text":301,"correct":22},"钢纤维混凝土路面切开的假纵缝可不设拉杆",{"key":31,"text":303,"correct":22},"一次铺筑宽度大于4.5m时应采用假缝拉杆型纵缝",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},903271,"常用的爆破施工方法中，浅孔深孔爆破发展的方向是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"斜坡地形路堑的抛掷爆破",{"key":24,"text":311,"correct":29},"多排孔微差爆破",{"key":27,"text":313,"correct":22},"平坦地形的抛掷爆破",{"key":31,"text":315,"correct":22},"斜坡地形半路堑的抛坍爆破",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":31,"analysis":33},903272,"在爆破技术的分类中，（ ）属于洞室爆破。",[320,322,324,326],{"key":20,"text":321,"correct":22},"光面爆破",{"key":24,"text":323,"correct":22},"微差爆破",{"key":27,"text":325,"correct":22},"预裂爆破",{"key":31,"text":327,"correct":29},"抛掷爆破",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},903273,"自然地面坡角α＞30°，地形地质条件均较复杂，临空面大时，宜采用（ ）的爆破方法。",[332,333,334,336],{"key":20,"text":313,"correct":22},{"key":24,"text":315,"correct":29},{"key":27,"text":335,"correct":22},"平坦地形的定向爆破",{"key":31,"text":309,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},903274,"路堤填料的一般要求中规定，不得直接作为路堤填料的土，其液限和塑性指数应分别满足（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"大于50%；大于20",{"key":24,"text":344,"correct":29},"大于50%；大于26",{"key":27,"text":346,"correct":22},"大于55%；大于20",{"key":31,"text":348,"correct":22},"大于55%；大于26",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},903275,"填石路堤压实质量标准的控制指标宜采用（ ）。",[353,355,356,358],{"key":20,"text":354,"correct":29},"孔隙率",{"key":24,"text":155,"correct":22},{"key":27,"text":357,"correct":22},"沉降差",{"key":31,"text":359,"correct":22},"密度",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},903276,"下列不属于土质路堤填筑方法的是（ ）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"联合填筑",{"key":24,"text":367,"correct":22},"水平分层填筑",{"key":27,"text":369,"correct":22},"纵向分层填筑",{"key":31,"text":371,"correct":29},"横向分层填筑",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},903277,"坡面排水中，排除地下水可采取的措施不包括（ ）。",[376,378,380,382],{"key":20,"text":377,"correct":29},"拦水带",{"key":24,"text":379,"correct":22},"明沟",{"key":27,"text":381,"correct":22},"渗沟",{"key":31,"text":383,"correct":22},"检查井",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":27,"analysis":33},903278,"一般情况下，同一路段应先施工的路基地面排水设施是（ ）。",[388,390,392,394],{"key":20,"text":389,"correct":22},"边沟",{"key":24,"text":391,"correct":22},"急流槽",{"key":27,"text":393,"correct":29},"截水沟",{"key":31,"text":377,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},903279,"渗沟包括填石渗沟、管式渗沟和洞式渗沟，这三种渗沟均应设置的结构不包括（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"排水层",{"key":24,"text":402,"correct":22},"反滤层",{"key":27,"text":404,"correct":22},"封闭层",{"key":31,"text":406,"correct":29},"过滤层",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},903280,"当地下水埋藏较深或有固定含水层时，宜采用的地下水排除设施是（ ）",[411,412,414,415],{"key":20,"text":381,"correct":22},{"key":24,"text":413,"correct":29},"渗井",{"key":27,"text":383,"correct":22},{"key":31,"text":416,"correct":22},"暗沟",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},903281,"下列基层中，不属于半刚性基层的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"二灰稳定土基层",{"key":24,"text":424,"correct":22},"石灰稳定土基层",{"key":27,"text":426,"correct":29},"沥青碎石基层",{"key":31,"text":428,"correct":22},"水泥稳定碎石基层",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},903282,"沥青稳定类基层又称柔性基层，下列不属于沥青稳定类基层的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"贯入式沥青碎石",{"key":24,"text":436,"correct":22},"乳化沥青碎石",{"key":27,"text":438,"correct":29},"冷拌沥青碎石",{"key":31,"text":440,"correct":22},"热拌沥青碎石",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},903283,"下列路面结构层中，属于柔性基层的是（ ）。",[445,446,448,450],{"key":20,"text":428,"correct":22},{"key":24,"text":447,"correct":29},"贯入式沥青碎石基层",{"key":27,"text":449,"correct":22},"二灰碎石基层",{"key":31,"text":424,"correct":22},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},903284,"下列关于透层的施工要求的说法不正确的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"透层沥青宜紧接在基层碾压成型后表面稍干但尚未硬化的情况下喷洒",{"key":24,"text":458,"correct":22},"透层施工应采用沥青洒布车，在铺筑沥青层前1～2天，一次均匀洒布透层",{"key":27,"text":460,"correct":22},"透层沥青洒布后应不致流淌，渗透入基层一定深度，不得在表面形成油膜",{"key":31,"text":462,"correct":29},"在无机结合料稳定半刚性基层上浇洒透层沥青后，不宜立即撒布石屑或粗砂",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},903285,"下列封层施工中不符合规定的做法是（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"封层施工宜选在干燥或较热的季节，气温不低于10℃",{"key":24,"text":470,"correct":22},"施工前应先清除原地面、修补坑槽、整平路面",{"key":27,"text":472,"correct":22},"使用乳化沥青稀浆封层施工必须使用专用的摊铺机进行摊铺",{"key":31,"text":474,"correct":29},"分两层摊铺时，下层摊铺后至少应开放交通10h后方可进行上层摊铺",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},903286,"下列垫层施工中符合规定的做法是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":29},"垫层材料选用砂砾或水泥稳定土",{"key":24,"text":482,"correct":22},"在铺筑垫层前，应清除路基面，保证路基干燥",{"key":27,"text":484,"correct":22},"摊铺后的碎石、砂砾应采用粗集料做嵌缝处理",{"key":31,"text":486,"correct":22},"两段作业衔接处，第一段留下3～6m不进行碾压",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":24,"analysis":33},903287,"下列无机结合料稳定类基层和底基层施工说法正确的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"水泥稳定土基层应采用路拌法施工",{"key":24,"text":494,"correct":29},"石灰稳定土基层施工气温应不低于5℃",{"key":27,"text":496,"correct":22},"石灰稳定土基层每层最小压实厚度为200mm",{"key":31,"text":498,"correct":22},"石灰粉煤灰稳定土基层养护期不得少于3天",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},903288,"水泥混凝土路面施工每天摊铺结束或因临时原因中断时，应设置横向施工缝，下列关于横缝说法正确的是（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":22},"横向胀缝应采用假缝",{"key":24,"text":506,"correct":22},"横向缩缝宜不等间距布置",{"key":27,"text":508,"correct":22},"横向施工缝在缩缝处应采用拉杆企口缝",{"key":31,"text":510,"correct":29},"横缝从功能上可分为横向施工缝、横向缩缝、横向胀缝",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},903289,"不仅适用于一般软弱破碎围岩，也适用于地下水丰富的松软围岩的隧道工程超前支护手段是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"超前锚杆",{"key":24,"text":518,"correct":22},"管棚",{"key":27,"text":520,"correct":29},"超前小导管注浆",{"key":31,"text":522,"correct":22},"预注浆",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},903290,"当边坡松软易坍塌及明洞与暗洞衔接时，明洞施工宜采用（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"先墙后拱法",{"key":24,"text":530,"correct":29},"先拱后墙法",{"key":27,"text":532,"correct":22},"拱墙同时",{"key":31,"text":534,"correct":22},"从下向上",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},903291,"根据《公路工程施工安全技术规范》（JTGF90—2015）中公路隧道施工安全步距要求，仰拱与掌子面的距离，IV级围岩不得超过（ ）m。",[539,540,541,543],{"key":20,"text":169,"correct":22},{"key":24,"text":21,"correct":29},{"key":27,"text":542,"correct":22},"70",{"key":31,"text":544,"correct":22},"90",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},903292,"可进一步扩大掏槽体积和增大爆破量，并为周边眼创造有利的爆破条件，其布置主要是解决间距和最小抵抗线问题，可以由施工经验解决的炮眼是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"掏槽眼",{"key":24,"text":552,"correct":29},"辅助眼",{"key":27,"text":554,"correct":22},"周边眼",{"key":31,"text":129,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},903293,"适用于各种地质条件的隧道地质超前预报方法是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"超前钻探法",{"key":24,"text":563,"correct":29},"地质调查法",{"key":27,"text":565,"correct":22},"物理勘探法",{"key":31,"text":567,"correct":22},"水力联系观测",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},903294,"隧道供电线路在施工地段应选用（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"绝缘良好胶皮线",{"key":24,"text":575,"correct":29},"橡套电缆",{"key":27,"text":577,"correct":22},"铠装电缆",{"key":31,"text":579,"correct":22},"密封阻燃铜芯电缆",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":24,"analysis":33},903295,"隧道内喷射混凝土常用的喷射方法是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"干喷",{"key":24,"text":587,"correct":29},"湿喷",{"key":27,"text":589,"correct":22},"潮喷",{"key":31,"text":591,"correct":22},"混合喷",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":24,"analysis":33},903296,"隧道通风，适用于有平行坑道的长隧道的通风方式为（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"风管式通风",{"key":24,"text":599,"correct":29},"巷道式通风",{"key":27,"text":601,"correct":22},"风墙式通风",{"key":31,"text":603,"correct":22},"自然通风",[605,608,611,614,617,620],{"id":15,"name":606,"category":7,"favorite":607},"领导干部任职前廉政法规知识测试题",92,{"id":609,"name":610,"category":7,"favorite":15},595,"建筑结构与设备",{"id":612,"name":613,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":615,"name":616,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":618,"name":619,"category":7,"favorite":8},534,"BIM工程师",{"id":621,"name":619,"category":7,"favorite":8},535]