[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-584-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},584,"建设工程技术与计量（交通）","建筑工程",0,11,50,1453,[13,34,46,58,70,82,94,106,118,130,142,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,388,400,412,424,436,447,459,471,483,495,507,519,531,543,555,567,577,589,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},903195,1,"单选题","对大跨径跨江河不能采用支架施工的上部现浇混凝土施工，例如T形刚构、变截面连续梁，一般采用（ ）施工。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","贝雷架",false,{"key":24,"text":25,"correct":22},"B","移动模架",{"key":27,"text":28,"correct":29},"C","挂篮",true,{"key":31,"text":32,"correct":22},"D","扇形托架","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},903196,"一般适用于墩台高度在12m以下的现浇混凝土梁式桥上部构造的辅助设施是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"桁构式木支架",{"key":24,"text":41,"correct":29},"满堂式木支架",{"key":27,"text":43,"correct":22},"满堂式轻型钢支架",{"key":31,"text":45,"correct":22},"钢木混合支架",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},903197,"公路施工前需要对施工现场进行勘察，勘察的主要对象不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"路线",{"key":24,"text":53,"correct":29},"地质",{"key":27,"text":55,"correct":22},"桥位",{"key":31,"text":57,"correct":22},"大型土石方地段",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},903198,"施工图预算的主要组成部分不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"设备、工具、器具及家具购置费",{"key":24,"text":65,"correct":22},"工程建设其他费用",{"key":27,"text":67,"correct":29},"规费",{"key":31,"text":69,"correct":22},"建筑安装工程费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},903199,"施工组织调查收集资料的基本要求是不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"座谈有纪要",{"key":24,"text":77,"correct":22},"协商有协议",{"key":27,"text":79,"correct":29},"讲求经济性",{"key":31,"text":81,"correct":22},"有文件规定的要索取的书面资料",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},903200,"施工组织计划的内容不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程进度图",{"key":24,"text":89,"correct":22},"主要材料计划表",{"key":27,"text":91,"correct":22},"临时工程表",{"key":31,"text":93,"correct":29},"施工方案的修正",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},903201,"下列关于施工中的安全管理原则的说法不正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"预防为主，综合考虑",{"key":24,"text":101,"correct":22},"安全管理应贯穿于施工全过程",{"key":27,"text":103,"correct":29},"进行针对性管理，安全第一",{"key":31,"text":105,"correct":22},"管生产必须同时管安全",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},903202,"标后设计编制过程中包括：①设计施工平面图；②编制施工准备工作计划；③确定施工部署；④拟定施工方案；⑤计算技术经济指标。正确的排序是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"③—①—⑤—④—②",{"key":24,"text":113,"correct":22},"④—①—⑤—②—③",{"key":27,"text":115,"correct":22},"④—②—⑤—①—③",{"key":31,"text":117,"correct":29},"③—④—②—①—⑤",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},903203,"下列关于施工组织设计的说法不正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"施工组织设计是根据工程发包组织的需要编制的技术经济文件",{"key":24,"text":125,"correct":22},"施工组织设计具有组织、规划和据以指挥、协调、控制的作用",{"key":27,"text":127,"correct":22},"施工组织设计是全局性的文件，即文件内容是全面的，发挥作用是全方位的",{"key":31,"text":129,"correct":22},"施工组织设计指导承包全过程，从投标开始，到竣工结束",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},903204,"下列不属于单位工程施工组织设计编制依据的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"水、电供应情况",{"key":24,"text":137,"correct":29},"设备材料订货指标",{"key":27,"text":139,"correct":22},"施工现场的具体情况",{"key":31,"text":141,"correct":22},"建设用地征购、拆迁情况",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},903205,"施工组织设计资料收集过程中，基本要求不包括（ ）。",[146,147,148,149],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":27,"text":79,"correct":29},{"key":31,"text":81,"correct":22},{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":20,"analysis":33},903206,"不属于施工平面图内容的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":29},"单位工程施工平面图",{"key":24,"text":157,"correct":22},"单项工程施工平面图",{"key":27,"text":159,"correct":22},"分部分项工程施工平面图",{"key":31,"text":161,"correct":22},"施工总平面图",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},903207,"下列不属于公路工程建设中的临时工程的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"汽车便道",{"key":24,"text":169,"correct":22},"轨道铺设",{"key":27,"text":171,"correct":22},"架设输电线路",{"key":31,"text":173,"correct":29},"混凝土浇筑",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},903208,"满堂式木支架结构形式中，排架式的跨度一般不宜大于（ ）m。",[178,180,182,184],{"key":20,"text":179,"correct":29},"4",{"key":24,"text":181,"correct":22},"5",{"key":27,"text":183,"correct":22},"7",{"key":31,"text":185,"correct":22},"8",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},903209,"工地建设中应满足的要求不包括（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"安全",{"key":24,"text":193,"correct":29},"高效",{"key":27,"text":195,"correct":22},"实用",{"key":31,"text":197,"correct":22},"环保",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},903210,"公路施工标准化的核心是（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"管理制度标准化",{"key":24,"text":205,"correct":29},"施工作业标准化",{"key":27,"text":207,"correct":22},"考核办法标准化",{"key":31,"text":209,"correct":22},"人员配备标准化",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":27,"analysis":33},903211,"不宜直接填筑于路床，不得直接填筑于冰冻地区的路床及浸水部分的路堤的填料是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"砂砾",{"key":24,"text":217,"correct":22},"有机质土",{"key":27,"text":219,"correct":29},"粉土",{"key":31,"text":221,"correct":22},"膨胀土",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},903212,"处理深厚软土地基荷载较大、变形要求较严格的高路堤段、桥头或通道与路堤衔接段的处置方法为（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"粒料桩",{"key":24,"text":229,"correct":22},"CFG桩",{"key":27,"text":231,"correct":29},"沉管灌注桩",{"key":31,"text":233,"correct":22},"加固土桩",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},903213,"袋装砂井施工工艺流程中，最后一步工艺是（ ）",[238,240,242,244],{"key":20,"text":239,"correct":22},"埋砂袋头",{"key":24,"text":241,"correct":22},"机具移位",{"key":27,"text":243,"correct":29},"摊铺上层砂垫层",{"key":31,"text":245,"correct":22},"拔出套管",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},903214,"当路基附近的地面水或浅层地下水无法排除、影响路基稳定时，可设置（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"渗沟",{"key":24,"text":253,"correct":29},"渗井",{"key":27,"text":255,"correct":22},"暗沟",{"key":31,"text":257,"correct":22},"排水沟",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},903215,"关于热拌沥青混凝土混合料压实的说法，错误的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"碾压分为初压、复压和终压",{"key":24,"text":265,"correct":22},"为保证沥青混合料碾压过程中不粘轮，可以采用雾状喷水法喷水碾压",{"key":27,"text":267,"correct":29},"边角部分压路机碾压不到的位置，采用人工静压",{"key":31,"text":269,"correct":22},"碾压进行中，压路机不得中途停留、转向",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},903216,"滑坡地段路基施工应符合的规定说法错误的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"宜在旱季施工",{"key":24,"text":277,"correct":22},"及时封闭滑坡体上的裂隙，在滑坡边缘一定距离外的稳定地层上，修筑一条或数条环形截水沟",{"key":27,"text":279,"correct":29},"采用削坡减载方案整治滑坡时，减载应自下而上进行，严禁超挖或乱挖",{"key":31,"text":281,"correct":22},"采用加填压脚方案整治滑坡时，只能在抗滑段加重反压",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},903217,"混凝土板养护初期，严禁人、畜、车辆通行，在达到设计强度（ ）后，行人方可通行。",[286,288,290,292],{"key":20,"text":287,"correct":22},"30%",{"key":24,"text":289,"correct":29},"40%",{"key":27,"text":291,"correct":22},"75%",{"key":31,"text":293,"correct":22},"80%",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},903218,"加筋土挡土墙一般布置在（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"岩石路堑边坡",{"key":24,"text":301,"correct":29},"地形平坦的填方路堤",{"key":27,"text":303,"correct":22},"陡坡路堤",{"key":31,"text":305,"correct":22},"土方路堑",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},903219,"截水沟应先施工，与其他排水设施应衔接平顺；应于挖方坡顶（ ）以外设置截水沟。",[310,312,314,316],{"key":20,"text":311,"correct":22},"2m",{"key":24,"text":313,"correct":22},"3m",{"key":27,"text":315,"correct":29},"5m",{"key":31,"text":317,"correct":22},"10m",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},903220,"进行中央分隔带的开挖一般是紧随（ ）工作。",[322,324,326,328],{"key":20,"text":323,"correct":29},"路面基层施工完毕后",{"key":24,"text":325,"correct":22},"路面底基层施工完毕后",{"key":27,"text":327,"correct":22},"路基施工完毕后",{"key":31,"text":329,"correct":22},"路面面层施工完毕后",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},903222,"沥青混凝土路面施工应做（ ）的试验路段。",[334,336,338,340],{"key":20,"text":335,"correct":22},"100m",{"key":24,"text":337,"correct":29},"200m",{"key":27,"text":339,"correct":22},"300m",{"key":31,"text":341,"correct":22},"400m",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},903223,"砾（碎）石桩施工采用振动沉管法，施工顺序为（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"先里排后外排，隔排隔桩跳打",{"key":24,"text":349,"correct":29},"先外排后里排，隔排隔桩跳打",{"key":27,"text":351,"correct":22},"先外排后里排，依次顺序施打",{"key":31,"text":353,"correct":22},"先里排后外排，依次顺序施打",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},903224,"培土路肩施工流程为：备料→推平→平整→X→Y→平整→碾压，其中X、Y工序分别是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"回填、切边",{"key":24,"text":361,"correct":22},"切边、回填",{"key":27,"text":363,"correct":29},"静压、切边",{"key":31,"text":365,"correct":22},"切边、静压",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},903225,"普通混凝土路面的胀缝不应设置（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"胀缝补强钢筋支架",{"key":24,"text":373,"correct":22},"胀缝板",{"key":27,"text":375,"correct":22},"传力杆",{"key":31,"text":377,"correct":29},"拉杆",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},903226,"普通混凝土路面横向缩缝宜等间距布置，不宜采用斜缩缝和不等间距缩缝，不得不调整板长时，最大板长宜不大于（ ），最小板长不宜小于板宽。",[382,383,385,386],{"key":20,"text":313,"correct":22},{"key":24,"text":384,"correct":22},"4m",{"key":27,"text":315,"correct":22},{"key":31,"text":387,"correct":29},"6m",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":20,"analysis":33},903227,"适用于挖掘浅且短的路堑的开挖方法是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":29},"横向单层",{"key":24,"text":395,"correct":22},"横向多层",{"key":27,"text":397,"correct":22},"纵向单层",{"key":31,"text":399,"correct":22},"纵向多层",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},903228,"适用于在设备附近、高压线下和开挖与浇筑过渡段等特定条件下的石质路堑开挖方式是（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"钻爆",{"key":24,"text":407,"correct":22},"机械",{"key":27,"text":409,"correct":29},"静态破碎",{"key":31,"text":411,"correct":22},"人工开挖",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},903229,"水泥混凝土路面模板拆除应在混凝土抗压强度不小于（ ）时方可进行。",[416,418,420,422],{"key":20,"text":417,"correct":22},"2.5MPa",{"key":24,"text":419,"correct":22},"5MPa",{"key":27,"text":421,"correct":29},"8MPa",{"key":31,"text":423,"correct":22},"10MPa",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},903230,"水泥稳定土基层用18～20t压路机碾压时，每层的压实厚度不应超过（ ）mm。",[428,430,432,434],{"key":20,"text":429,"correct":22},"100",{"key":24,"text":431,"correct":22},"150",{"key":27,"text":433,"correct":29},"200",{"key":31,"text":435,"correct":22},"250",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},903231,"填方分几个作业段施工时，接头部位如不能交替填筑，则先填路段，应按1：1坡度分层留台阶；如能交替填筑，则应分层相互交替搭接，搭接长度不小于（ ）m。",[440,442,444,446],{"key":20,"text":441,"correct":22},"1",{"key":24,"text":443,"correct":29},"2",{"key":27,"text":445,"correct":22},"3",{"key":31,"text":179,"correct":22},{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},903232,"土方路堤填筑时，地面纵坡大于12%、用推土机从路堑取料、填筑距离 较短的路堤填筑方式是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"水平分层填筑",{"key":24,"text":454,"correct":29},"纵向分层填筑",{"key":27,"text":456,"correct":22},"横向填筑",{"key":31,"text":458,"correct":22},"联合填筑",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":24,"analysis":33},903233,"土石路堤每层松铺厚度应根据压实机械类型和规格确定，不宜超过（ ）cm。",[463,465,467,469],{"key":20,"text":464,"correct":22},"30",{"key":24,"text":466,"correct":29},"40",{"key":27,"text":468,"correct":22},"50",{"key":31,"text":470,"correct":22},"60",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},903234,"为使沥青面层与基层结合良好，在基层上浇洒乳化沥青、煤沥青或液体沥青而形成的透入基层表面的薄层称为（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"垫层",{"key":24,"text":478,"correct":29},"透层",{"key":27,"text":480,"correct":22},"黏层",{"key":31,"text":482,"correct":22},"封层",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},903235,"我国在高等级公路水泥混凝土路面施工中广泛采用的是（ ）",[487,489,491,493],{"key":20,"text":488,"correct":22},"小型机具铺筑",{"key":24,"text":490,"correct":29},"滑模摊铺机铺筑",{"key":27,"text":492,"correct":22},"辊轴机组铺筑",{"key":31,"text":494,"correct":22},"碾压混凝土等",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":27,"analysis":33},903236,"下列不属于半刚性基层的有（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"石灰稳定类",{"key":24,"text":502,"correct":22},"水泥稳定类",{"key":27,"text":504,"correct":29},"矿渣类",{"key":31,"text":506,"correct":22},"石灰工业废渣稳定集料类",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":27,"analysis":33},903237,"下列粒料类基中属于级配型的是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"泥结碎石",{"key":24,"text":514,"correct":22},"泥灰结碎石",{"key":27,"text":516,"correct":29},"级配碎石",{"key":31,"text":518,"correct":22},"填隙碎石",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},903238,"一般公路的基层宽度每侧宜比面层宽出（ ）cm，底基层每侧宜比基层宽（ ）cm。",[523,525,527,529],{"key":20,"text":524,"correct":22},"5，10",{"key":24,"text":526,"correct":29},"10，15",{"key":27,"text":528,"correct":22},"15，20",{"key":31,"text":530,"correct":22},"20，30",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":27,"analysis":33},903239,"一般用于当泥沼及软土厚度小于3m且其软层位于水下、更换土施工困难或基底直接落在含水率极高的淤泥上使用的处置方案是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"换填法",{"key":24,"text":538,"correct":22},"垫层法",{"key":27,"text":540,"correct":29},"抛石挤淤",{"key":31,"text":542,"correct":22},"爆炸挤淤",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":27,"analysis":33},903240,"预裂爆破时炮眼采用（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"方格形",{"key":24,"text":550,"correct":22},"梅花形",{"key":27,"text":552,"correct":29},"一字形",{"key":31,"text":554,"correct":22},"十字形",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},903241,"在开挖界限处按适当间隔排列炮孔，在没有侧向临空面和最小抵抗线的情况下，用控制炸药用量的方法，预先炸出一条裂缝，使拟爆体与山体分开，作为隔震减震带，以保护开挖界限以外的山体或建筑物，减弱爆体爆破造成的破坏作用的爆破方法是（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"光面爆破",{"key":24,"text":562,"correct":29},"预裂爆破",{"key":27,"text":564,"correct":22},"微差爆破",{"key":31,"text":566,"correct":22},"定向爆破",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},903242,"重力式挡土墙当墙身的强度达到设计强度的 （ ）时，方可进行回填等工作。",[571,573,574,575],{"key":20,"text":572,"correct":22},"70%",{"key":24,"text":291,"correct":29},{"key":27,"text":293,"correct":22},{"key":31,"text":576,"correct":22},"85%",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},903243,"下列关于土质路堤的压实要求符合规定的是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":29},"压实过程中，直线段由两边向中间进行",{"key":24,"text":584,"correct":22},"压实机具应先重后轻",{"key":27,"text":586,"correct":22},"碾压速度宜先快后慢",{"key":31,"text":588,"correct":22},"碾压一段终了，不宜采取机械纵向退行方式碾压第二遍",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},903244,"在路基工程中，用于排除地下水的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":22},"拦水带",{"key":24,"text":596,"correct":22},"急流槽",{"key":27,"text":598,"correct":22},"截水沟",{"key":31,"text":253,"correct":29},{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":31,"analysis":33},903245,"塑料排水板的施工工艺流程中，“插入套管”的前一道工序是（ ）。",[604,605,607,609],{"key":20,"text":245,"correct":22},{"key":24,"text":606,"correct":22},"割断塑料排水板",{"key":27,"text":608,"correct":22},"机具就位",{"key":31,"text":610,"correct":29},"塑料排水板穿靴",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]