[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904143":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},904143,584,2,"多选题","招标工程量清单基本的编制流程包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","现场踏勘、询价",false,{"key":16,"text":17,"correct":18},"B","造价资料收集与调查",true,{"key":20,"text":21,"correct":14},"C","计算基础标价",{"key":23,"text":24,"correct":18},"D","招标工程量清单编制",{"key":26,"text":27,"correct":14},"E","研究招标文件","BD","现阶段招标控制价主要采用定额单价法编制，编制方法与清单预算类似，即“采用工程量清单的表现形式，按照施工图预算的方法组价”。其基本的编制流程如下：①造价资料收集与调查；②招标工程量清单编制。ACE三项均属于投标工程量清单编制的流程。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（交通）","建筑工程",0]