[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-904133":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},904133,584,2,"多选题","工程量清单由（ ）组成。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程量清单表",true,{"key":16,"text":17,"correct":14},"B","计日工明细表",{"key":19,"text":20,"correct":14},"C","暂估价表",{"key":22,"text":23,"correct":24},"D","暂列金额表",false,{"key":26,"text":27,"correct":14},"E","工程量清单汇总表","ABCE","本题考查的是工程量清单计量规则。工程量清单由说明、工程量清单表、计日工明细表、暂估价表、工程量清单汇总表组成",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（交通）","建筑工程",0]