[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903971":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},903971,584,2,"多选题","索塔完工后，须测定裸塔（ ）作为主缆线形计算调整的依据",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","倾斜度",true,{"key":16,"text":17,"correct":18},"B","中线",false,{"key":20,"text":21,"correct":14},"C","跨距",{"key":23,"text":24,"correct":14},"D","塔顶高程",{"key":26,"text":27,"correct":18},"E","塔底高程","ACD","本题考查的是桥涵工程施工技术。塔顶钢框架的安装必须在索塔上系梁施工完毕后方能进行。索塔完工后，须测定裸塔倾斜度、跨距和塔顶高程，作为主缆线形计算调整的依据。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（交通）","建筑工程",0]