[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903948":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},903948,584,2,"多选题","隧道开挖应遵循（ ）的原则进行开挖掘进。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","短进尺",true,{"key":16,"text":17,"correct":14},"B","强支护",{"key":19,"text":20,"correct":21},"C","快支护",false,{"key":23,"text":24,"correct":14},"D","弱爆破",{"key":26,"text":27,"correct":14},"E","勤观测","ABDE","本题考查的是公路隧道施工技术。隧道开挖的主要方法是钻孔爆破法。应遵循“短进尺、强支护、弱爆破、勤观测”的原则进行开挖掘进；在确定开挖断面时，除应满足隧道净空和结构尺寸外，并应考虑围岩及初期支护影响变形。当采用复合式衬砌时，还应考虑适当预留变形量，预留变形量的大小可根据围岩级别、断面大小、埋置深度、施工方法及支护情况等。在施工过程中，预留变形量应根据现场监控量测结果进行调整。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（交通）","建筑工程",0]