[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903818":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},903818,584,2,"多选题","为有效降低车辆行驶速度，在可用于（ ）进入城镇、村庄的路段，或者进入干线的支路上，全断面铺设减速丘，并设置相应的减速丘标志、标线、建议速度或限制速度标志",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","高速公路",false,{"key":16,"text":17,"correct":14},"B","一级公路",{"key":19,"text":20,"correct":14},"C","二级公路",{"key":22,"text":23,"correct":24},"D","三级公路",true,{"key":26,"text":27,"correct":24},"E","四级公路","DE","本题考查的是公路交通安全设施。为有效降低车辆行驶速度，在可用于三、四级公路进入城镇、村庄的路段，或者进入干线的支路上，全断面铺设减速丘，并设置相应的减速丘标志、标线、建议速度或限制速度标志。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（交通）","建筑工程",0]