[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903639":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},903639,584,2,"多选题","桥孔布置必须保证（ ）安全通过。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","设计洪水",true,{"key":16,"text":17,"correct":18},"B","大型船只",false,{"key":20,"text":21,"correct":14},"C","流冰",{"key":23,"text":24,"correct":14},"D","流木",{"key":26,"text":27,"correct":14},"E","较小的各级洪水和泥沙","ACDE","本题考查的是水文条件对工程建设的影响。桥孔布置应符合的原则之一：必须保证设计洪水以及较小的各级洪水和泥沙安全通过，并通过通航、流冰、流木及其他漂流物安全通过的要求。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（交通）","建筑工程",0]