[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903594":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},903594,584,1,"单选题","项目实施阶段造价监督的主要内容不包括（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","从事公路工程造价活动的单位和人员的信用情况",false,{"key":16,"text":17,"correct":14},"B","各阶段相关造价文件的落实情况",{"key":19,"text":20,"correct":14},"C","设计变更原因及费用变更情况",{"key":22,"text":23,"correct":24},"D","项目实施阶段的气象情况",true,"项目实施阶段造价监督的主要内容包括：①相关单位对公路工程造价管理法律、法规、规章、制度以及公路工程造价依据的执行情况。②各阶段造价文件编制、审查、审批、备案以及对批复意见的落实情况。③建设单位工程造价管理台账和计量支付制度的建立与执行、造价全过程管理与控制情况。④设计变更原因及费用变更情况。⑤建设单位对项目造价信息的收集、分析及报送情况。⑥从事公路工程造价活动的单位和人员的信用情况。⑦其他相关事项。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]