[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903590":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},903590,584,1,"单选题","经批准的概算是基本建设项目投资的最高限额，若概算突破批准的（ ）的10%时，应修编可行性研究报吿并报请原批准部门重新审批。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投资估算",true,{"key":16,"text":17,"correct":18},"B","工程概算",false,{"key":20,"text":21,"correct":18},"C","修正概算",{"key":23,"text":24,"correct":18},"D","施工图预算","本题考查的是各阶段公路工程造价的监督内容及程序。经批准的概算是基本建设项目投资的最高限额，若概算突破批准的投资估算10%时，应修编可行性研究报吿并报请原批准部门重新审批。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]