[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903580":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},903580,584,1,"单选题","桥梁基础和墩台工程的施工基本上都是采用（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","悬臂施工",false,{"key":16,"text":17,"correct":14},"B","预制安装或悬拼",{"key":19,"text":20,"correct":21},"C","就地砌筑或浇筑",true,{"key":23,"text":24,"correct":14},"D","顶推施工","20世纪70年代以来，随着预应力混凝土的广泛应用，施工机械设备的不断发展，桥梁施工方法多种多样，如现浇、预制安装、悬臂施工、顶推施工等。但就其施工工艺的全过程来看，可以归纳为两类：一是就地砌筑或浇筑；二是预制安装或悬拼。基础和墩台工程的施工基本上都是采用前一种施工方法，而上部构造多采用后一种施工方法。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]