[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903567":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},903567,584,1,"单选题","工程量清单说明强调的主要内容不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程量清单中工程量的性质与作用",false,{"key":16,"text":17,"correct":14},"B","投标人填报工程量清单时的要求",{"key":19,"text":20,"correct":21},"C","计日工的设计原则",true,{"key":23,"text":24,"correct":14},"D","工程量清单单价和总价的含义","工程量清单说明是对清单细目中不能具体表述的内容进行进一步的明确。概括起来工程量清单说明强调的主要内容如下：①工程量清单中工程量的性质与作用；②工程量清单与其他招标文件的关系；③投标人填报工程量清单时的要求；④工程量清单单价和总价的含义；⑤计日工总则；⑥计日工单价的含义。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]