[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903563":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},903563,584,1,"单选题","直接工程费的计算一般采用（ ）进行计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定额单价分析法",true,{"key":16,"text":17,"correct":18},"B","清单计价法",false,{"key":20,"text":21,"correct":18},"C","项目成本法",{"key":23,"text":24,"correct":18},"D","工程定额分析法","直接费是施工过程中直接耗费的构成工程实体和有助于工程形成的工、料、机费用，是标价构成中的主要部分。在编制投标工程量清单时，直接工程费的计算一般采用定额单价分析法进行计算，采用项目成本法进行校核和决策。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]