[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903562":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},903562,584,1,"单选题","现阶段招标控制价主要采用（ ）编制。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","清单预算法",false,{"key":16,"text":17,"correct":14},"B","定额计价法",{"key":19,"text":20,"correct":14},"C","清单计价法",{"key":22,"text":23,"correct":24},"D","定额单价法",true,"招标工程量清单由招标人或招标人委托的代理人编制用于确定招标控制价。现阶段招标控制价主要采用定额单价法编制，编制方法与清单预算类似，即“采用工程量清单的表现形式，按照施工图预算的方法组价”。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]