[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903557":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},903557,584,1,"单选题","清单计价工程细目、预算定额子目、图纸中的设计工程量细目之间的工作内容综合程度关系正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预算定额子目≥清单计价细目≥设计图纸细目",false,{"key":16,"text":17,"correct":18},"B","清单计价细目≥预算定额子目≥设计图纸细目",true,{"key":20,"text":21,"correct":14},"C","设计图纸细目≥清单计价细目≥预算定额子目",{"key":23,"text":24,"correct":14},"D","设计图纸细目≥预算定额子目≥清单计价细目","本题考查的是工程量清单计价。清单计价工程细目、预算定额子目、图纸中的设计工程量细目之间的工作内容综合程度关系如下：清单计价细目≥预算定额子目≥设计图纸细目。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]