[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903547":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},903547,584,1,"单选题","工程量应由（ ）计算，（ ）审核。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包人，发包人",false,{"key":16,"text":17,"correct":18},"B","承包人，监理人",true,{"key":20,"text":21,"correct":14},"C","发包人，监理人",{"key":23,"text":24,"correct":14},"D","监理人，发包人","本题考查的是工程量清单计量规则。工程量应由承包人计算，由监理人审核。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]