[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903505":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},903505,584,1,"单选题","工程造价编制流程中，建安工程费用计算的前一道流程是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程量摘取",false,{"key":16,"text":17,"correct":18},"B","分项工程费用摘取",true,{"key":20,"text":21,"correct":14},"C","选择施工方法",{"key":23,"text":24,"correct":14},"D","预备费用计算","本题考查的是公路工程造价费用组成。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]