[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},903403,584,1,"单选题","下列关于车道计算机系统设备的施工技术要求说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设备摆放平稳",false,{"key":16,"text":17,"correct":18},"B","设备后部散热空间不足",true,{"key":20,"text":21,"correct":14},"C","计算机电源线无漏接、错接",{"key":23,"text":24,"correct":14},"D","标志铭牌正确、完整、无误","省收费管理中心、路段收费分中心、收费站、计算机系统设备的施工要求包括：①设备摆放要平稳，后部留有足够的空间散热。②计算机电源线、控制线、信号线的接插头安装牢固，无漏接、错接现象。③标志铭牌正确、完整、无误。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]