[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903361":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},903361,584,1,"单选题","下列关于加劲梁施工说法正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","钢桁架一般采用工地焊接连接施工",false,{"key":16,"text":17,"correct":14},"B","钢箱梁接头焊缝宜从桥面两侧向中轴线对称施焊",{"key":19,"text":20,"correct":14},"C","全铰接法架设接近设计线形后对全部铰接点逐固结",{"key":22,"text":23,"correct":24},"D","逐次固结法架设时宜在不同架设阶段用千斤顶调整吊索张力",true,"A项，钢桁架一般采用工厂焊接、工地高强度螺栓连接施工。B项，钢箱加劲梁采用焊接连接时，应先将待连接钢箱加劲梁的节段与已安装节段临时刚性连接，接头焊缝的施焊宜从桥面中轴线向两侧对称进行。CD两项，钢桁架采用全铰接法架设时，在桁架梁逐渐接近设计线形后，可对部分铰接点逐固结；采用逐次固结法架设时，宜采用接长杆牵引吊索与桁架梁连接，且宜在不同架设阶段采用千斤顶调整吊索张力，直至最后拆除接长杆入锚。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]