[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-903326":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},903326,584,1,"单选题","基坑顶面应设置防止地面水流入基坑的设施，基顶有动荷载时，其边缘与动荷载之间应留有不小于（ ）m宽的护道。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",true,{"key":16,"text":17,"correct":18},"B","1.5",false,{"key":20,"text":21,"correct":18},"C","2",{"key":23,"text":24,"correct":18},"D","5","本题考查的是桥涵工程施工技术。基坑顶面应设置防止地面水流入基坑的设施，基顶有动荷载时，其边缘与动荷载之间应留有不小于1m宽的护道。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（交通）","建筑工程",0]