[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-583-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":623},{"id":5,"name":6,"category":7,"favorite":8},583,"建设工程技术与计量（安装)","建筑工程",0,34,50,2472,[13,35,47,60,73,86,98,111,124,136,148,160,172,184,196,208,220,232,244,256,268,280,293,304,316,329,341,353,363,375,387,399,411,420,432,444,456,468,479,491,503,515,527,539,551,563,575,587,599,611],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},901828,2,"多选题","(2018年)摩擦焊是利用焊件接触面的强烈摩擦产生的热量，将焊件连接面快速加热到塑性状态，并在压力下形成接头的热压焊方法。其特点有（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","焊接过程可控性好，质量稳定，焊件精度高",true,{"key":24,"text":25,"correct":22},"B","在各种回转体结构焊接方法中可逐步取代电弧焊、电阻焊、闪光焊",{"key":27,"text":28,"correct":22},"C","可用于一些用熔焊、电阻焊不能焊的异种金属",{"key":30,"text":31,"correct":32},"D","劳动条件差，有弧光、烟尘、射线污染",false,"ABC","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":33,"analysis":34},901831,"(2012年)与湿喷砂法除锈相比，干喷砂法的特点有()。",[39,41,43,45],{"key":20,"text":40,"correct":22},"除锈效率高",{"key":24,"text":42,"correct":22},"除锈质量好",{"key":27,"text":44,"correct":22},"设备简单",{"key":30,"text":46,"correct":32},"适用于成批小零件除锈",{"id":48,"libraryId":5,"type":15,"typeLabel":16,"stem":49,"options":50,"answer":59,"analysis":34},901832,"(2014年)涂料涂覆施工中，高压无空气喷涂法的特点有()。",[51,53,55,57],{"key":20,"text":52,"correct":32},"降低了漆雾的飞散损失",{"key":24,"text":54,"correct":22},"漆膜的附着力强",{"key":27,"text":56,"correct":22},"适合喷涂高黏度涂料",{"key":30,"text":58,"correct":22},"工效高，适合大面积施工","BCD",{"id":61,"libraryId":5,"type":15,"typeLabel":16,"stem":62,"options":63,"answer":72,"analysis":34},901833,"(2016年)涂料涂覆工艺中的电泳涂装的主要特点有()。",[64,66,68,70],{"key":20,"text":65,"correct":32},"使用水溶性涂料和油溶性涂料",{"key":24,"text":67,"correct":22},"涂装效率高，涂料损失小",{"key":27,"text":69,"correct":22},"涂膜厚度均匀，附着力强",{"key":30,"text":71,"correct":32},"不适用复杂形状工件的涂装","BC",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":85,"analysis":34},901834,"(2013年)电泳漆装是利用外加电场使悬浮于电泳液中的颜料和树脂微粒定向迁移并沉积于电极之一的工件表面的涂装方法，其主要特点有()。",[77,79,81,83],{"key":20,"text":78,"correct":22},"采用水溶性涂料，节省有机溶剂，安全卫生",{"key":24,"text":80,"correct":22},"涂装效率高，涂料损失小，生产效率高",{"key":27,"text":82,"correct":32},"涂膜厚度不均，附着力差，不适用于复杂形状工件",{"key":30,"text":84,"correct":22},"设备复杂，投资费用高，耗电量大","ABD",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":33,"analysis":34},901835,"(2017年)与空气喷涂法相比，高压无空气喷涂法的特点有()。",[90,92,94,96],{"key":20,"text":91,"correct":22},"避免发生涂料回弹和漆雾飞扬",{"key":24,"text":93,"correct":22},"工效要高出数倍至十几倍",{"key":27,"text":95,"correct":22},"涂膜附着力较强",{"key":30,"text":97,"correct":32},"漆料用量较大",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":110,"analysis":34},901836,"(2018年)对钢材表面处理的要求，以下表述正确的有（ ）。",[102,104,106,108],{"key":20,"text":103,"correct":22},"对普通钢材以喷砂法进行除锈处理时，表面处理质量控制应达到Sa2.5 级",{"key":24,"text":105,"correct":32},"喷砂后的钢材应在4h 之内完成至少二道油漆的涂装",{"key":27,"text":107,"correct":32},"采用无机磷酸盐长效型富锌涂料作为底漆，应先采用喷砂处理，不能带锈涂刷",{"key":30,"text":109,"correct":22},"对镀锌层必须采用轻扫级喷砂法处理，然后涂刷环氧铁红防腐漆","AD",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":123,"analysis":34},901838,"(2012年)在安装工程常用的机械化吊装设备中，履带起重机的工作特点有()。",[115,117,119,121],{"key":20,"text":116,"correct":22},"操作灵活，使用方便",{"key":24,"text":118,"correct":32},"不能全回转作业",{"key":27,"text":120,"correct":22},"适用于没有道路的工地",{"key":30,"text":122,"correct":22},"可安装打桩、拉铲等装置","ACD",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":59,"analysis":34},901839,"(2010年)水压试验是用来检验设备焊缝的致密性和强度，水压试验的方法及要求中应包括()。",[128,130,132,134],{"key":20,"text":129,"correct":32},"设备焊缝致密性实验合格后再进行强度试验",{"key":24,"text":131,"correct":22},"达到规定试验压力后，至少保持30min无渗漏",{"key":27,"text":133,"correct":22},"对于碳钢和一般低合金钢，试验水温不应低于5℃",{"key":30,"text":135,"correct":22},"对于不锈耐酸钢容器，试验用水的氯离子含量不应超过25×10",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":123,"analysis":34},901840,"(2013年)有防锈要求的脱脂件经脱脂处理后，宜采取的保护措施有()。",[140,142,144,146],{"key":20,"text":141,"correct":22},"充氮封存",{"key":24,"text":143,"correct":32},"固相防锈纸密封",{"key":27,"text":145,"correct":22},"气相防锈纸密封",{"key":30,"text":147,"correct":22},"气相防锈塑料薄膜密封",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":85,"analysis":34},901841,"(2016年)输送极度和高度危害介质以及可燃介质的管道，必须进行泄漏性试验。关于泄漏性试验正确描述的有()",[152,154,156,158],{"key":20,"text":153,"correct":22},"泄漏性试验应在压力试验合格后进行",{"key":24,"text":155,"correct":22},"泄漏性试验的介质宜采用空气",{"key":27,"text":157,"correct":32},"泄漏性试验的压力为设计压力1.2倍",{"key":30,"text":159,"correct":22},"采用涂刷中性发泡剂来检查有无泄漏",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":123,"analysis":34},901842,"(2017年)设备气密性试验是用来检查连接部位的密封性能，其应遵循的规定有()c",[164,166,168,170],{"key":20,"text":165,"correct":22},"设备经液压试验合格后方可进行气密性试验",{"key":24,"text":167,"correct":32},"气密性试验的压力应为设计压力的1.15倍",{"key":27,"text":169,"correct":22},"缓慢升压至试验压力后，保压30min以上",{"key":30,"text":171,"correct":22},"连接部位等应用检漏液检查",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":72,"analysis":34},901843,"(2015年)经酸洗后的设备和管道内壁要进行钝化，钝化时应遵循的规定有（）。",[176,178,180,182],{"key":20,"text":177,"correct":32},"酸洗后的设备和管道，应在两周内钝化",{"key":24,"text":179,"correct":22},"钝化液通常采用亚硝酸钠溶液",{"key":27,"text":181,"correct":22},"钝化结束后，要用偏碱的水冲洗",{"key":30,"text":183,"correct":32},"钝化时不得采用流动清洗法",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":33,"analysis":34},901844,"(2011年)管道进行水压试验时，试压前的准备工作包括()。",[188,190,192,194],{"key":20,"text":189,"correct":22},"安装临时注水和排水管线",{"key":24,"text":191,"correct":22},"管道系统的最高点安装排气阀",{"key":27,"text":193,"correct":22},"管道系统的末端安装排气阀",{"key":30,"text":195,"correct":32},"管道系统的最低点安装压力表",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":33,"analysis":34},901845,"(2012年)对清洗后的设备及管道进行预膜时，按膜的主要组成物的类型划分，可包括()。",[200,202,204,206],{"key":20,"text":201,"correct":22},"氧化物膜",{"key":24,"text":203,"correct":22},"铬酸盐膜",{"key":27,"text":205,"correct":22},"磷酸盐膜",{"key":30,"text":207,"correct":32},"硅酸盐膜",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":33,"analysis":34},901846,"(2014年)大型机械的润滑油、密封油等管道系统进行油清洗时，应遵循的规定有()。",[212,214,216,218],{"key":20,"text":213,"correct":22},"系统酸洗合格后、试运转前进行油清洗",{"key":24,"text":215,"correct":22},"不锈钢油管道系统宜采用蒸汽吹净后，再进行油清洗",{"key":27,"text":217,"correct":22},"酸洗钝化或蒸汽吹扫合格后，应在两周内进行油清洗",{"key":30,"text":219,"correct":32},"油清洗合格的管道，应脱脂后进行封闭保护",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":85,"analysis":34},901847,"(2018年)关于酸洗法的描述,正确的有（ ）",[224,226,228,230],{"key":20,"text":225,"correct":22},"循环酸洗法各回路不大于300m",{"key":24,"text":227,"correct":22},"酸洗时可采用脱脂、酸洗、中和、钝化四工序合一的清洗液",{"key":27,"text":229,"correct":32},"液压站至使用点采用槽式酸洗法",{"key":30,"text":231,"correct":22},"酸洗合格后,如不能马上使用,应采用充氮保护措施",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":243,"analysis":34},901848,"(2018年)对设备和管道内壁有特殊清洁要求的，如液压、润滑管道的除锈可采用酸洗法。采用酸洗法应符合（ ）。",[236,238,239,241],{"key":20,"text":237,"correct":32},"循环酸洗法时，组成回路的管道长度不宜超过300m",{"key":24,"text":227,"correct":22},{"key":27,"text":240,"correct":32},"从液压站至使用点的管道宜采用槽式酸洗法",{"key":30,"text":242,"correct":22},"酸洗合格后管道若不马上投入运行，应采取充氮保护措施","BD",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":33,"analysis":34},901851,"(2018年)安全文明施工措施项目的工作内容中包括（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":22},"生活垃圾清理外运",{"key":24,"text":251,"correct":22},"现场防扰民措施",{"key":27,"text":253,"correct":22},"现场操作场地硬化",{"key":30,"text":255,"correct":32},"大口径管道内施工时的通风措施",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":123,"analysis":34},901852,"(2018年)下列工作内容应列入专业措施项目的有（ ）。",[260,262,264,266],{"key":20,"text":261,"correct":22},"行车梁加固",{"key":24,"text":263,"correct":32},"电缆试验",{"key":27,"text":265,"correct":22},"地震防护",{"key":30,"text":267,"correct":22},"顶升装置安装、拆除",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":33,"analysis":34},901853,"(2018年)编制一份分部分项工程量清单应包括五个要件，它们是项目编码及（ ）。",[272,274,276,278],{"key":20,"text":273,"correct":22},"项目名称",{"key":24,"text":275,"correct":22},"项目特征",{"key":27,"text":277,"correct":22},"计量单位",{"key":30,"text":279,"correct":32},"工程量计算规则",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":292,"analysis":34},901854,"(2013年)根据《通用安装工程工程量计算规范》，属于安装专业措施项目的有()。",[284,286,288,290],{"key":20,"text":285,"correct":22},"脚手架搭拆",{"key":24,"text":287,"correct":32},"冬雨季施工增加",{"key":27,"text":289,"correct":22},"特殊地区施工增加",{"key":30,"text":291,"correct":32},"已完工程及设备保护","AC",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":85,"analysis":34},901855,"(2013年)在安装专业措施项目清单中，吊装加固项目工作内容及包含范围为()。",[297,298,300,302],{"key":20,"text":261,"correct":22},{"key":24,"text":299,"correct":22},"桥式起重机加固及负荷试验",{"key":27,"text":301,"correct":32},"吊装设备吊耳的制作、加固及安装",{"key":30,"text":303,"correct":22},"整体吊装临时加固件、加固设施拆除、清理",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":59,"analysis":34},901856,"(2014年)依据《通用安装工程工程量计算规范》(GB50856-2013)的规定，属于安全文明施工及其他措施项目的有()。",[308,310,312,314],{"key":20,"text":309,"correct":32},"在有害身体健康环境中施工增加",{"key":24,"text":311,"correct":22},"环境保护",{"key":27,"text":313,"correct":22},"非夜间施工增加",{"key":30,"text":315,"correct":22},"高层施工增加",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":328,"analysis":34},901857,"(2015年)依据《通用安装工程工程量计算规范》(GB 50856—2013)，附录H工业管道工程中低压碳钢管安装的“工程内容”有安装、压力试验、吹扫，还包括( )。",[320,322,324,326],{"key":20,"text":321,"correct":22},"清洗",{"key":24,"text":323,"correct":22},"脱脂",{"key":27,"text":325,"correct":32},"钝化",{"key":30,"text":327,"correct":32},"预膜","AB",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":85,"analysis":34},901858,"(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，脚手架搭拆措施项目包括的工作内容有()。",[333,335,337,339],{"key":20,"text":334,"correct":22},"场内、场外相关材料搬运",{"key":24,"text":336,"correct":22},"搭设、拆除脚手架",{"key":27,"text":338,"correct":32},"搭设、超出围护网",{"key":30,"text":340,"correct":22},"拆除脚手架后材料的堆放",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":110,"analysis":34},901859,"(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，临时设施属于安全文明施工及其他措施项目，其项目内容包括()。",[345,347,349,351],{"key":20,"text":346,"correct":22},"施工场地砖、混凝土砌块等围挡的安砌、维修、拆除",{"key":24,"text":348,"correct":32},"地下（暗）室等部位施工时所用照明设备的安拆、维护",{"key":27,"text":350,"correct":32},"已完成工程及设备的覆盖、包裹、封闭、隔离等保护措施",{"key":30,"text":352,"correct":22},"其他临时设施的搭设、维护、拆除",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":110,"analysis":34},901860,"(2016年)依据《通用安装工程工程量计算规范》GB50856-2013的规定，下列项目中属于安全文明施工及其他措施项目的有()。",[357,358,360,362],{"key":20,"text":291,"correct":22},{"key":24,"text":359,"correct":32},"有害化合物防护",{"key":27,"text":361,"correct":32},"高浓度氧气防护",{"key":30,"text":315,"correct":22},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":59,"analysis":34},901861,"(2017年)依据《通用安装工程工程量计算规范》(GB50856-2013)，措施项目清单中，属于专业措施项目的有()。",[367,369,371,373],{"key":20,"text":368,"correct":32},"二次搬运",{"key":24,"text":370,"correct":22},"平台铺设、拆除",{"key":27,"text":372,"correct":22},"焊接工艺评定",{"key":30,"text":374,"correct":22},"防护棚制作、安装、拆除",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":123,"analysis":34},901862,"(2017年)依据《通用安装工程工程量计算规范》(GB50856-2013)，其他项目清单中的暂列金额包括()。",[379,381,383,385],{"key":20,"text":380,"correct":22},"工程合同签订时尚未确定或者不可预见的所需材料、工程设备、服务的采购等费用",{"key":24,"text":382,"correct":32},"施工过程中出现质量问题或事故的处理费用",{"key":27,"text":384,"correct":22},"施工中可能发生工程变更所需费用",{"key":30,"text":386,"correct":22},"合同约定调整因素出现时的合同价款调整及发生的索赔、现场签证确认等的费用",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":110,"analysis":34},901863,"(2014年)依据《通用安装工程工程量计算规范》(GB50856-2013)的规定，项目安装高度若超过基本高度时，应在项目特征中描述。附录中基本安装高度为6m的项目名称为()。",[391,393,395,397],{"key":20,"text":392,"correct":22},"附录G通风空调工程",{"key":24,"text":394,"correct":32},"附录J消防工程",{"key":27,"text":396,"correct":32},"附录K给排水、采暖、燃气工程",{"key":30,"text":398,"correct":22},"附录M刷油、防腐蚀、绝热工程",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":85,"analysis":34},901864,"(2014年)依据《建设工程工程量清单计价规范》(GB50500-2013)的规定，安装工程量清单中的其他项目清单除包括暂估价外，一般还有()。",[403,405,407,409],{"key":20,"text":404,"correct":22},"暂列金额",{"key":24,"text":406,"correct":22},"计日工",{"key":27,"text":408,"correct":32},"分包服务费",{"key":30,"text":410,"correct":22},"总承包服务费",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":33,"analysis":34},901865,"(2015年)依据《通用安装工程工程量计算规范》(GB 50856—2013)，下列项目中属于安全文明施工及其他措施项目的有( )。",[415,417,418,419],{"key":20,"text":416,"correct":22},"夜间施工增加",{"key":24,"text":287,"correct":22},{"key":27,"text":315,"correct":22},{"key":30,"text":289,"correct":32},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":123,"analysis":34},901866,"(2017年)依据《通用安装工程工程量计算规范》(GB50856-2013)，措施项目清单中，关于高层施工增加的规定，正确的表述有()。",[424,426,428,430],{"key":20,"text":425,"correct":22},"单层建筑物檐口高度超过20m应分别列项",{"key":24,"text":427,"correct":32},"多层建筑物超过8层时，应分别列项",{"key":27,"text":429,"correct":22},"突出主体建筑物顶的电梯机房、水箱间、排烟机房等不计入檐口高度",{"key":30,"text":431,"correct":22},"计算层数时，地下室不计入层数",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":292,"analysis":34},901869,"(2012年)设备安装时，垫铁组正确安放的方法有()。",[436,438,440,442],{"key":20,"text":437,"correct":22},"斜垫铁放在平垫铁上面",{"key":24,"text":439,"correct":32},"厚垫铁置于薄垫铁上面",{"key":27,"text":441,"correct":22},"同一组垫铁几何尺寸相同",{"key":30,"text":443,"correct":32},"斜垫铁必须成对使用",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":72,"analysis":34},901870,"(2016年)对于提升倾角较大的散装固体物料，其使用的输送设备有()。",[448,450,452,454],{"key":20,"text":449,"correct":32},"振动输送机",{"key":24,"text":451,"correct":22},"斗式输送机",{"key":27,"text":453,"correct":22},"斗式提升机",{"key":30,"text":455,"correct":32},"带上输送机",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":72,"analysis":34},901871,"(2012年)按照泵的作用原理分类，下列泵中属于容积式泵的有()。",[460,462,464,466],{"key":20,"text":461,"correct":32},"旋涡泵",{"key":24,"text":463,"correct":22},"隔膜泵",{"key":27,"text":465,"correct":22},"柱塞泵",{"key":30,"text":467,"correct":32},"喷射泵",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":292,"analysis":34},901872,"(2016年)按照作用原理分类，泵可分为动力式泵、容积式泵及其他类型泵。下列属于动力泵的有()。",[472,474,476,477],{"key":20,"text":473,"correct":22},"轴流泵",{"key":24,"text":475,"correct":32},"转子泵",{"key":27,"text":461,"correct":22},{"key":30,"text":478,"correct":32},"齿轮泵",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":243,"analysis":34},901873,"(2015年)离心式深井潜水泵与离心式深井泵的共同特点有( )。",[483,485,487,489],{"key":20,"text":484,"correct":32},"泵与电动机制成一体",{"key":24,"text":486,"correct":22},"泵的扬程高，需较长的出水管",{"key":27,"text":488,"correct":32},"需要较长的传动轴",{"key":30,"text":490,"correct":22},"均为多级离心泵",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":292,"analysis":34},901874,"(2013年)编制工程量清单时，刮板输送机安装项目特征描述中除包括名称、型号、槽宽、长度外，还要求有()。",[495,497,499,501],{"key":20,"text":496,"correct":22},"驱动装置组数",{"key":24,"text":498,"correct":32},"运行速度",{"key":27,"text":500,"correct":22},"单机试运转要求",{"key":30,"text":502,"correct":32},"符合试运转要求",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":85,"analysis":34},901875,"(2012年)机械设备安装准备工作关系到工程质量好坏、施工速度快慢等，准备工作主要包括()。",[507,509,511,513],{"key":20,"text":508,"correct":22},"技术准备",{"key":24,"text":510,"correct":22},"组织准备",{"key":27,"text":512,"correct":32},"生产准备",{"key":30,"text":514,"correct":22},"供应工作准备",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":33,"analysis":34},901876,"(2014年)清洗设备及装配件表面的除锈油脂，宜采用的清洗方法有()。",[519,521,523,525],{"key":20,"text":520,"correct":22},"对中小型形状复杂的装配件采用多步清洗法或浸、涮结合法",{"key":24,"text":522,"correct":22},"对形状复杂、污垢严重、清洗要求高的装配件采用浸 — 喷联合清洗",{"key":27,"text":524,"correct":22},"对装配件的最后清洗，采用超声波装置，用溶剂油清洗",{"key":30,"text":526,"correct":32},"对精密零件、滚动轴承等采用清洗剂进行喷洗",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":85,"analysis":34},901877,"(2014年)与活塞式压缩机相比，透平式压缩机的主要性能特点有()。",[531,533,535,537],{"key":20,"text":532,"correct":22},"气流速度高、损失大",{"key":24,"text":534,"correct":22},"小流量、超高压范围不适用",{"key":27,"text":536,"correct":32},"流量不随出口压力变化",{"key":30,"text":538,"correct":22},"外形尺寸及重量较小，结构简单",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":72,"analysis":34},901878,"(2018年)依据《通用安装工程工程量计算规范》（GB 50856－2013），机械设备安装工程量中以“台”为计量单位的有（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":32},"直流电梯安装",{"key":24,"text":546,"correct":22},"冷水机组",{"key":27,"text":548,"correct":22},"多级离心泵安装",{"key":30,"text":550,"correct":32},"风力发电机",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":110,"analysis":34},901879,"(2018年)与透平式压缩机相比，活塞式压缩机的主要性能有（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"气流速度低、损失小",{"key":24,"text":558,"correct":32},"小流量，超高压范围不适用",{"key":27,"text":560,"correct":32},"旋转零部件常用高强度合金钢",{"key":30,"text":562,"correct":22},"外形尺寸较大、重量大、结构复杂",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":33,"analysis":34},901883,"(2013年)根据《通用安装工程工程量计算规范》热力设备安装工程按设计图示设备质量以“t”计算的有()。",[567,569,571,573],{"key":20,"text":568,"correct":22},"烟道、热风道",{"key":24,"text":570,"correct":22},"渣仓",{"key":27,"text":572,"correct":22},"脱硫吸收塔",{"key":30,"text":574,"correct":32},"除尘器",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":59,"analysis":34},901884,"(2015年)锅炉燃烧中产生的烟气除烟尘外，还含有SO2等污染物质。燃烧前对燃料脱硫是防止SO2对大气污染的重要途径之一，主要包括( )。",[579,581,583,585],{"key":20,"text":580,"correct":32},"加入CaO制成型煤脱硫",{"key":24,"text":582,"correct":22},"化学浸出法脱硫",{"key":27,"text":584,"correct":22},"细菌法脱硫",{"key":30,"text":586,"correct":22},"洗选法脱硫",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":72,"analysis":34},901885,"(2017年)依据《通用安装工程工程量计算规范》(GB50856-2013)的规定，中压锅炉及其他辅助设备安装工程量计量时，以“只”为计量单位的项目有()。",[591,593,595,597],{"key":20,"text":592,"correct":32},"省煤器",{"key":24,"text":594,"correct":22},"煤粉分离器",{"key":27,"text":596,"correct":22},"暖风器",{"key":30,"text":598,"correct":32},"旋风分离器",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":59,"analysis":34},901886,"(2014年)依据《通用安装工程工程量计算规范》(GB508562013)的规定，上煤设备安装工程量计量中，下列计量单位表述正确的有()。",[603,605,607,609],{"key":20,"text":604,"correct":32},"皮带机按设计图示数量以“套”计算",{"key":24,"text":606,"correct":22},"皮带秤按设计图示数量以“台”计算",{"key":27,"text":608,"correct":22},"输煤转运站落煤设备按设计图示数量以“套”计算",{"key":30,"text":610,"correct":22},"配仓皮带机按设计图示长度以“m”计算",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":243,"analysis":34},901887,"(2018年)属于热水锅炉供热水系统组成部分的设备及附件有（ ）。",[615,617,619,621],{"key":20,"text":616,"correct":32},"过热器",{"key":24,"text":618,"correct":22},"换热器",{"key":27,"text":620,"correct":32},"冷却器",{"key":30,"text":622,"correct":22},"分水器",[624,628,631,634,637,640],{"id":625,"name":626,"category":7,"favorite":627},1,"领导干部任职前廉政法规知识测试题",92,{"id":629,"name":630,"category":7,"favorite":625},595,"建筑结构与设备",{"id":632,"name":633,"category":7,"favorite":625},715,"招标采购专业知识与法律法规",{"id":635,"name":636,"category":7,"favorite":625},848,"市政方向-通用基础",{"id":638,"name":639,"category":7,"favorite":8},534,"BIM工程师",{"id":641,"name":639,"category":7,"favorite":8},535]