[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-583-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},583,"建设工程技术与计量（安装)","建筑工程",0,28,50,2472,[13,34,46,58,70,82,94,105,117,129,141,153,165,177,189,201,213,225,237,248,260,272,284,296,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,508,516,528,536,544,553,562,571,583],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},901520,1,"单选题","（2016年考题）对于铁磁性和非铁磁性金属材料而言，只能检查其表面和近表面缺陷的无损探伤方法为（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","超声波探伤",false,{"key":24,"text":25,"correct":26},"B","涡流检测",true,{"key":28,"text":29,"correct":22},"C","磁粉检测",{"key":31,"text":32,"correct":22},"D","液体渗透检测","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},901521,"（2016年考题）将钢件加热到热处理工艺所要求的的适当温度，保持一定时间后在空气中冷却，得到需要的基本组织结构。其目的是消除应力、细化组织、改善切削加工性能。这种生产周期短、能耗低的热处理工艺为（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"正火",{"key":24,"text":41,"correct":22},"完全退火",{"key":28,"text":43,"correct":22},"不完全退火",{"key":31,"text":45,"correct":22},"去应力退火",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},901522,"（2017年考题）用熔化极氩气气体保护焊焊接铝、镁等金属时，为有效去除氧化膜，提高接头焊接质量，应采取（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"交流电源反接法",{"key":24,"text":53,"correct":22},"交流电源正接法",{"key":28,"text":55,"correct":26},"直流电源反接法",{"key":31,"text":57,"correct":22},"直流电源正接法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},901523,"（2020年真题）主要应用30m以上的厚件,可与铸造及锻压相结合生产组合件,以解决铸、锻能力的不足,因此特别适用于重型机械制造业,如轧钢机、水轮机、水压机及其他大型锻压机械。在高压锅炉、石油高压精炼塔、电站的大型容器、炼铁高炉以及造船工业中亦获得大量应用，可进行大面积堆焊和补焊,该焊接方法是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"手弧焊",{"key":24,"text":65,"correct":22},"埋弧焊",{"key":28,"text":67,"correct":22},"等离子弧焊",{"key":31,"text":69,"correct":26},"电渣焊",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},901524,"（2020年真题）直径DN40的低压碳素钢坡口加工方式为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"氧乙炔",{"key":24,"text":77,"correct":26},"手提砂轮机",{"key":28,"text":79,"correct":22},"坡口机",{"key":31,"text":81,"correct":22},"车床加工坡口",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},901525,"（2020年真题）将钢件加热到250-500℃回火,使工件得到好的弹性、韧性及相应的硬度,一般适用于中等硬度的零件、弹簧等。该热处理方法是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"低温回火",{"key":24,"text":89,"correct":26},"中温回火",{"key":28,"text":91,"correct":22},"高温回火",{"key":31,"text":93,"correct":22},"淬火",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},901526,"（2020年真题）只能检测磁性和非磁性金属材料的表面和近表面缺陷的方法是（ ）",[98,100,102,103],{"key":20,"text":99,"correct":22},"射线探伤",{"key":24,"text":101,"correct":22},"磁粉探伤",{"key":28,"text":21,"correct":22},{"key":31,"text":104,"correct":26},"涡流探伤",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},901527,"（2018年考题）使加砂、喷砂、集砂等操作过程连续化，使砂流在一密闭系统内循环，从而避免了粉尘的飞扬，除锈质量好，改善了操作条件，该种除锈方法为（）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"干喷砂法",{"key":24,"text":112,"correct":22},"湿喷砂法",{"key":28,"text":114,"correct":22},"高压喷砂法",{"key":31,"text":116,"correct":26},"无尘喷砂法",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":31,"analysis":33},901528,"（2016年考题）采用氢-氧焰将铅条熔融后贴覆在被衬的物件或设备表面上，形成具有一定厚度的密实的铅层。这种防腐方法为（）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"涂铅",{"key":24,"text":124,"correct":22},"粘铅",{"key":28,"text":126,"correct":22},"衬铅",{"key":31,"text":128,"correct":26},"搪铅",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},901529,"（2016年考题）绝热结构金属保护层的搭接缝，宜采用的连接方式为（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"自攻螺钉连接",{"key":24,"text":136,"correct":22},"普通铆钉连接",{"key":28,"text":138,"correct":26},"抽芯铆钉连接",{"key":31,"text":140,"correct":22},"焊接连接",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},901530,"（2015年考题）涂料涂覆工艺中，为保障环境安全，需要设置废水处理工艺的涂覆方法是（）。",[145,147,149,151],{"key":20,"text":146,"correct":26},"电泳涂装法",{"key":24,"text":148,"correct":22},"静电喷涂法",{"key":28,"text":150,"correct":22},"压缩空气喷涂法",{"key":31,"text":152,"correct":22},"高压无空气喷涂法",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},901531,"（2019年考题）涂装质量好,工件各个部们如内层,凹陷,焊缝等处都能获得均匀平滑的漆膜（）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"刷涂法",{"key":24,"text":160,"correct":22},"滚涂法",{"key":28,"text":162,"correct":22},"高压无气喷涂法",{"key":31,"text":164,"correct":26},"电泳涂装法。",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},901532,"（2015年考题）管道绝热工程施工时，适用于纤维质绝热层面上的防潮层材料应该采用（）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"沥青油毡",{"key":24,"text":172,"correct":26},"塑料薄膜",{"key":28,"text":174,"correct":22},"石棉水泥",{"key":31,"text":176,"correct":22},"麻刀石灰泥",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},901533,"（2017年考题）某一回转运动的反应釜，工艺要求在负压下工作，釜内壁需采用金属铅防腐蚀，覆盖铅的方法应为（）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"螺栓固定法",{"key":24,"text":184,"correct":22},"压板条固定法",{"key":28,"text":186,"correct":22},"搪钉固定法",{"key":31,"text":188,"correct":26},"搪铅法",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},901534,"（2017年考题）用金属薄板作保冷结构的保护层时，保护层接缝处的连接方法除咬口连接外，还宜采用的连接方法为（）。",[193,195,197,199],{"key":20,"text":194,"correct":26},"钢带捆扎法",{"key":24,"text":196,"correct":22},"自攻螺钉法",{"key":28,"text":198,"correct":22},"铆钉固定法",{"key":31,"text":200,"correct":22},"带垫片抽芯铆钉固定法",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},901535,"（2020年真题）异性管件、阀门、法兰的绝热方式应选用（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"捆扎绝热层",{"key":24,"text":208,"correct":22},"粘贴绝热层",{"key":28,"text":210,"correct":26},"浇筑式绝热层",{"key":31,"text":212,"correct":22},"钉贴绝热层",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},901536,"（2020年真题）可用于一些薄壁、形状复杂的物件除锈方法是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"喷射除锈",{"key":24,"text":220,"correct":22},"抛射除锈",{"key":28,"text":222,"correct":22},"火焰除锈",{"key":31,"text":224,"correct":26},"化学除锈",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},901537,"（2018年考题）结构简单，易于制作，操作容易，移动方便，一般用于起重量不大，起重速度较慢又无电源的起重作业中，该起重设备为（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"滑车",{"key":24,"text":232,"correct":22},"起重葫芦",{"key":28,"text":234,"correct":22},"手动卷扬机",{"key":31,"text":236,"correct":26},"绞磨",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},901538,"（2018年考题）流动式起重机的选用步骤（）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"确定站车位置，确定臂长，确定额定起重量，选择起重机，校核通过性能",{"key":24,"text":244,"correct":22},"确定站车位置，确定臂长，确定额定起重量，校核通过性能，选择起重机",{"key":28,"text":246,"correct":22},"确定臂长，确定站车位置，确定额定起重量，选择起重机，校核通过性能",{"key":31,"text":246,"correct":22},{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},901539,"（2017年考题）某工作现场要求起重机吊装能力为3~100t，臂长40~80m，使用地点固定、使用周期较长且较经济。一般为单机作业，也可双机抬吊，应选用的吊装方法为（）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"液压提升法",{"key":24,"text":255,"correct":22},"桅杆系统吊装",{"key":28,"text":257,"correct":26},"塔式起重机吊装",{"key":31,"text":259,"correct":22},"桥式起重机吊装",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":31,"analysis":33},901540,"（2016年考题）某机械化吊装设备，稳定性能较好，车身短，转弯半径小，适合场地狭窄的作业场所，可以全回转作业。因其行使速度慢，对路面要求较高，故适宜于作业地点相对固定而作业量较大的场合。这种起重机为（）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"轻型汽车起重机",{"key":24,"text":267,"correct":22},"中型汽车起重机",{"key":28,"text":269,"correct":22},"重型汽车起重机",{"key":31,"text":271,"correct":26},"轮胎起重机",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":28,"analysis":33},901541,"（2016年考题）多台起重机共同抬吊一重40t的设备，索吊具重量0.8t，不均衡荷载系数取上、下限平均值，此时计算荷载应为（）。（取小数点后两位）",[276,278,280,282],{"key":20,"text":277,"correct":22},"46.92t",{"key":24,"text":279,"correct":22},"50.60t",{"key":28,"text":281,"correct":26},"51.61t",{"key":31,"text":283,"correct":22},"53.86t",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},901542,"（2019年考题）适用于某一范围内数量多,而每一单件重量较小的设备,构件吊装,作业周期长（）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"流动式起重机",{"key":24,"text":291,"correct":26},"塔式起重机",{"key":28,"text":293,"correct":22},"桅杆起重机",{"key":31,"text":295,"correct":22},"门式起重机",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},901543,"（2015年考题）吊装工程中常用的吊具除吊钩、吊梁外，还包括（）。（该考点教材已修改，卡环改为吊环）",[300,302,304,305],{"key":20,"text":301,"correct":22},"钢丝绳",{"key":24,"text":303,"correct":22},"尼龙带",{"key":28,"text":230,"correct":22},{"key":31,"text":306,"correct":26},"卡环",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},901544,"（2017年考题）某台起重机吊装一设备，已知吊装重物的重量为Q（包括索、吊具的重量）。吊装计算载荷应为（）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"Q",{"key":24,"text":314,"correct":26},"1.1Q",{"key":28,"text":316,"correct":22},"1.2Q",{"key":31,"text":318,"correct":22},"1.1×1.2Q",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},901545,"（2020年真题）通过起升机构的升降运动、小车运行机构和大车运行机构的水平运动,在矩形三维空间内完成对物料的搬运作业,属于（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"臂架型起重机",{"key":24,"text":326,"correct":26},"桥架型起重机",{"key":28,"text":328,"correct":22},"桅杆式起重机",{"key":31,"text":330,"correct":22},"桥式起重机",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},901546,"（2020年真题）借助机、电、液一体化工作原理,使提升能力可按实际需要进行任意组合配置,解决了常规起重机不能解决的大型构件整体提升技术难题。该吊装方法是（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"缆索系统提升",{"key":24,"text":338,"correct":26},"液压提升",{"key":28,"text":340,"correct":22},"汽车起重机提升",{"key":31,"text":342,"correct":22},"桥式起重机提升",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},901547,"（2017年考题）某DN100的输送常温液体的管道，在安装完毕后应做的后续辅助工作为（）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"气压试验，蒸汽吹扫",{"key":24,"text":350,"correct":22},"气压试验，压缩空气吹扫",{"key":28,"text":352,"correct":26},"水压试验，水清洗",{"key":31,"text":354,"correct":22},"水压试验，压缩空气吹扫",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},901548,"（2017年考题）某埋地敷设承受内压的铸铁管道，当设计压力为0.4MPa时，其液压试验的压力应为（）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"0.6MPa",{"key":24,"text":362,"correct":26},"0.8MPa",{"key":28,"text":364,"correct":22},"0.9MPa",{"key":31,"text":366,"correct":22},"1.0MPa",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},901549,"（2016年考题）某工艺管道系统，其管线长、口径大、系统容积也大，且工艺限定禁水。此管道的吹扫、清洗方法应选用（）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"无油压缩空气吹扫",{"key":24,"text":374,"correct":26},"空气爆破法吹扫",{"key":28,"text":376,"correct":22},"高压氮气吹扫",{"key":31,"text":378,"correct":22},"先蒸汽吹净后再进行油清洗",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},901550,"（2016年考题）承受内压的埋地铸铁管道进行水压试验，当设计压力为0.50MPa时，水压试验力为（）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"0.60MPa",{"key":24,"text":386,"correct":22},"0.75MPa",{"key":28,"text":388,"correct":26},"1.00MPa",{"key":31,"text":390,"correct":22},"1.50MPa",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},901551,"（2019年考题）埋地钢管工作压力为0.5MP A.,水压试验压力为（）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"0.4",{"key":24,"text":398,"correct":22},"0.5",{"key":28,"text":400,"correct":26},"0.75",{"key":31,"text":402,"correct":22},"1",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},901552,"（2019年考题）直径600mm,长度6000m的气体管道冲洗方法为（）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"氢气",{"key":24,"text":410,"correct":22},"蒸汽",{"key":28,"text":412,"correct":22},"压缩空气",{"key":31,"text":414,"correct":26},"空气爆破法",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},901553,"（2015年考题）对有严重锈蚀和污染的液体管道，当使用一般清洗方法未能达到要求时，可采取将管道分段进行（）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"高压空气吹扫",{"key":24,"text":422,"correct":22},"高压蒸汽吹扫",{"key":28,"text":424,"correct":26},"高压水冲洗",{"key":31,"text":426,"correct":22},"酸洗",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},901554,"（2020年真题）忌油管道用蒸汽吹扫脱脂,应按设计规定进行脱脂质量检查。利用间接法检验宜采用（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"白布",{"key":24,"text":434,"correct":22},"白滤纸",{"key":28,"text":436,"correct":22},"白靶板",{"key":31,"text":438,"correct":26},"纯樟脑",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},901555,"（2020年真题）设备耐压试验应采用液压试验,若用气压试验代替液压试验,压力容器的对接焊缝检测要求（ ）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"25%射线或超声波检测合格",{"key":24,"text":446,"correct":22},"50%射线或超声波检测合格",{"key":28,"text":448,"correct":22},"75%射线或超声波检测合格",{"key":31,"text":450,"correct":26},"100%射线或超声波检测合格",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},901556,"（2018年考题）安装工程项目编码第二级为06的工程为（）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"静置设备安装",{"key":24,"text":458,"correct":22},"电气设备安装",{"key":28,"text":460,"correct":26},"自动化控制仪表",{"key":31,"text":462,"correct":22},"工业管道",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},901557,"（2018年考题）刷油、防腐、绝热工程的基本安装高度为（）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"10m",{"key":24,"text":470,"correct":26},"6m",{"key":28,"text":472,"correct":22},"3.6m",{"key":31,"text":474,"correct":22},"5m",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},901558,"（2017年考题）依据《通用安装工程工程量计算规范》（GB50856—2013），室外给水管道与市政管道界限划分应为（）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"以项目区入口水表井为界",{"key":24,"text":482,"correct":22},"以项目区围墙外1.5m为界",{"key":28,"text":484,"correct":22},"以项目区围墙外第一个阀门为界",{"key":31,"text":486,"correct":26},"以市政管道碰头井为界",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},901559,"（2019年考题）附录 D.0304的专业工程为（）。",[491,493,495,497],{"key":20,"text":492,"correct":26},"电气设备安装工程",{"key":24,"text":494,"correct":22},"建筑智能化工程",{"key":28,"text":496,"correct":22},"工业管道工程",{"key":31,"text":498,"correct":22},"通风空调工程",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},901560,"（2019年考题）根据《安装工程计量规范》（G B.50856-2013）规定,机械设备安装工程基本安装高度为（）。",[503,504,505,506],{"key":20,"text":474,"correct":22},{"key":24,"text":470,"correct":22},{"key":28,"text":468,"correct":26},{"key":31,"text":507,"correct":22},"12m",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},901561,"（2015年考题）依据《通用安装工程工程量计算规范》（GB50856-2013），项目安装高度若超过基本高度时，应在“项目特征”中描述，对于附录J消防工程，其基本安装高度为（）。",[512,513,514,515],{"key":20,"text":472,"correct":22},{"key":24,"text":474,"correct":26},{"key":28,"text":470,"correct":22},{"key":31,"text":468,"correct":22},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":28,"analysis":33},901562,"（2015年考题）依据《通用安装工程工程量计算规范》（GB50856-2013）的规定，刷油、防腐蚀、绝热工程的编码为（）。",[520,522,524,526],{"key":20,"text":521,"correct":22},"0310",{"key":24,"text":523,"correct":22},"0311",{"key":28,"text":525,"correct":26},"0312",{"key":31,"text":527,"correct":22},"0313",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":28,"analysis":33},901563,"（2016年考题）依据《通用安装工程工程量计算规范》（GB50856-2013），项目安装高度若超过基本高度时，应在“项目特征”中描述。对于附录G通风空调工程。其基本安装高度为（）。",[532,533,534,535],{"key":20,"text":472,"correct":22},{"key":24,"text":474,"correct":22},{"key":28,"text":470,"correct":26},{"key":31,"text":468,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},901564,"（2016年考题）依据《通用安装工程工程量计算规范》（GB50856-2013）的规定，“给排水、采暖、燃气工程”的编码为（）。",[540,541,542,543],{"key":20,"text":521,"correct":26},{"key":24,"text":523,"correct":22},{"key":28,"text":525,"correct":22},{"key":31,"text":527,"correct":22},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},901565,"（2017年考题）依据《通用安装工程工程量计算规范》（GB50856—2013），安装工程分类编码体系中，第一、二级编码为0308，表示（）。",[548,549,550,551],{"key":20,"text":492,"correct":22},{"key":24,"text":498,"correct":22},{"key":28,"text":496,"correct":26},{"key":31,"text":552,"correct":22},"消防工程",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},901566,"（2020年真题）根据《安装工程计量规范》规定,给排水、釆暖、燃气工程基本安装高度为（ ）。",[557,559,560,561],{"key":20,"text":558,"correct":22},"2.2m",{"key":24,"text":472,"correct":26},{"key":28,"text":474,"correct":22},{"key":31,"text":470,"correct":22},{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},901567,"（2020年真题）依据《通用安装工程工程量计算规范》（ZYS199208-2013）规定,安装工程附录K0310表示的是（ ）。",[566,568,569,570],{"key":20,"text":567,"correct":26},"给排水、采暖、燃气工程",{"key":24,"text":552,"correct":22},{"key":28,"text":492,"correct":22},{"key":31,"text":496,"correct":22},{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},901568,"（2018年考题）中小型形状复杂的装配件，清洗方法为（）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"溶剂油擦洗和涮洗",{"key":24,"text":578,"correct":26},"清洗液浸泡或浸、涮结合清洗",{"key":28,"text":580,"correct":22},"溶剂油喷洗",{"key":31,"text":582,"correct":22},"乙醇和金属清洗剂擦洗和涮洗",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":28,"analysis":33},901569,"（2018年考题）可以输送具有磨琢性，化学腐蚀性或有毒的散状固体物料，运行费用较低，但输送能力有限，不能输送黏结性强，易破损的物料，不能大角度向土倾斜输送物料，此种输送机为（）。",[587,589,591,593],{"key":20,"text":588,"correct":22},"链式",{"key":24,"text":590,"correct":22},"螺旋式",{"key":28,"text":592,"correct":26},"振动",{"key":31,"text":594,"correct":22},"带式",[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]