[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902605":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":23,"analysis":24},902605,583,2,"多选题","（2017年考题）依据《通用安装工程工程量计算规范》（GB50856—2013），机械设备安装工程量中以“台”为计量单位的有（）。 A.离心式泵安装 B.刮板输送机安装 C.交流电梯安装 D.离心式压缩机安装",[11,14,16,19,21],{"key":12,"text":12,"correct":13},"A",true,{"key":15,"text":15,"correct":13},"B",{"key":17,"text":17,"correct":18},"C",false,{"key":20,"text":20,"correct":13},"D",{"key":22,"text":22,"correct":18},"E","ABD","交流自动电梯及直流自动快速电梯、直流自动高速电梯、小型杂物电梯安装的工程量计算，应按电梯的不同层数和站数，分别以“部”为单位计算。",{"id":6,"name":26,"category":27,"favorite":28},"建设工程技术与计量（安装)","建筑工程",0]