[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902579":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":23,"analysis":24},902579,583,2,"多选题","（2017年考题）设备气密性试验是用来检查连接部位的密封性能，其应遵循的规定有（）。 A.设备经液压试验合格后方可进行气密性试验 B.气密性试验的压力应为设计压力的1.15倍 C.缓慢升压至试验压力后，保压30min以上 D.连接部位等应用检漏液检查",[11,14,17,19,21],{"key":12,"text":12,"correct":13},"A",true,{"key":15,"text":15,"correct":16},"B",false,{"key":18,"text":18,"correct":13},"C",{"key":20,"text":20,"correct":13},"D",{"key":22,"text":22,"correct":16},"E","ACD","气密性试验应在耐压试验合格后进行。 设备气密性试验方法及要求： （1）设备经液压试验合格后方可进行气密性试验。 （2）气密性试验压力见表2.4.1. （3）气密性试验时，压力应缓慢上升，达到试验压力后，保压时间不少于30min，同时对焊缝和连接部位等用检漏 液检查，无泄漏为合格。",{"id":6,"name":26,"category":27,"favorite":28},"建设工程技术与计量（安装)","建筑工程",0]