[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902477":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},902477,583,2,"多选题","变压器到达现场后应进行器身检查，当满足下列条件之一时，可不进行器身检查（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","制造厂规定可不进行器身检查者",true,{"key":16,"text":17,"correct":14},"B","容量为1OOOkV·A及以下，运输过程中无异常情况者",{"key":19,"text":20,"correct":21},"C","容量为2000kV·A及以下，运输过程中无异常情况者",false,{"key":23,"text":24,"correct":21},"D","就地生产、仅作短途运输的变压器","AB","2020版教材P358 变压器安装，器身检查当满足下列条件之一时，可不进行器身检查：制造厂规定可不进行器身检查者；容量为1000kV·A及以下，运输过程中无异常情况者；就地生产、仅作短途运输的变压器，且在运输过程中进行了有效的监督，无紧急制动、剧烈振动、冲击、严重颠簸等异常情况者。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]