[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902462":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},902462,583,2,"多选题","夹套管安装时，操作正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","内管直管段对接焊缝间距不应小于100mm",false,{"key":16,"text":17,"correct":18},"B","夹套管穿墙、平台或楼板应装设套管和挡水环",true,{"key":20,"text":21,"correct":18},"C","内管有焊缝时应进行100%射线检测",{"key":23,"text":24,"correct":14},"D","真空度试验合格后进行严密性试验","BC","教材p300-301。夹套管安装:（4）直管段对接焊缝的间距，内管不应小于200mm，外管不应小于100mm。（5）环向焊缝距管架的净距不应小于100mm，且不得留在过墙或楼板处。（9）夹套管穿墙、平台或楼板，应装设套管和挡水环。（10）内管有焊缝时，该焊缝应进行100%射线检测。（11）内管加工完毕后，焊接部位应裸露进行压力试验。夹套管加工完毕后，套管部分应按设计压力的1.5 倍进行压力试验。（12）真空系统在严密性试验合格后，进行真空度试验，时间为24h，系统增压率不大于5%为合格。（14）内管应用干燥无油压缩空气进行系统吹扫，气体流速不小于20m\u002FS。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]