[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902388":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},902388,583,2,"多选题","有一高压管道为φ89×12的20#无缝钢管，在安装施工中的正确要求应有()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","管道连接采用V形坡口焊接",true,{"key":16,"text":17,"correct":18},"B","管道中心线弯曲半径为350mm",false,{"key":20,"text":21,"correct":14},"C","热弯温度不应高于1000℃",{"key":23,"text":24,"correct":14},"D","焊前一般应进行预热","ACD","本题的考点是高压管道的安装要求。 (1)20#钢热弯时，热弯温度以800～900℃为宜，其加热温度不应高于1000℃，终弯温度不得低于800℃。 (2)高压管道中心线弯曲半径R及最小直边长度L应符合下列要求：R≥5D(管子外径)；L≥1．3D(但不大于60mm)。 (3)高压管道的焊缝坡口应采用机械方法，坡口形式根据壁厚及焊接方法选择V形或U形；当壁厚小于16mm时，采用V形坡口；壁厚为7～34mm时，可采用V形坡口或U形坡口。 (4)为了保证焊缝质量，高压管子在焊接前一般应进行预热，焊后应进行热处理。2020版教材P308-312",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]