[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902242":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},902242,583,2,"多选题","与《通用安装工程工程量计算规范》（GB 50856—2013）不同的是，分部分项工程量清单形式中不包含（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目编码",false,{"key":16,"text":17,"correct":14},"B","项目名称",{"key":19,"text":20,"correct":21},"C","工程量计算规则",true,{"key":23,"text":24,"correct":21},"D","工程内容","CD","教材p114-116。《安装工程计量规范》规定的项目编码、项目名称、项目特征、计量单位和工程量计算规则。分部分项工程量清单必须包括五部分：项目编码、项目名称、项目特征、计量单位和工程量。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]