[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-902225":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},902225,583,2,"多选题","在施工措施项目及其计量中，施工项目管理规划主要内容有()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工现场管理",true,{"key":16,"text":17,"correct":14},"B","施工方案和施工方法",{"key":19,"text":20,"correct":21},"C","施工设备报价",false,{"key":23,"text":24,"correct":14},"D","施工平面图","ABD","安装施工措施项目的列项及其计量要根据施工项目管理规划进行，施工项目管理规划主要内容有施工方案和施工方法、施工现场管理和施工平面图等。2020版教材P121-122",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]