[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901869":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},901869,583,2,"多选题","(2012年)设备安装时，垫铁组正确安放的方法有()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","斜垫铁放在平垫铁上面",true,{"key":16,"text":17,"correct":18},"B","厚垫铁置于薄垫铁上面",false,{"key":20,"text":21,"correct":14},"C","同一组垫铁几何尺寸相同",{"key":23,"text":24,"correct":18},"D","斜垫铁必须成对使用","AC","该题主要考察的是垫铁放置应符合的要求，垫铁放置应符合的要求包括：①每一组垫铁内，斜垫铁放在最上面，单块斜垫铁下面应有平垫铁。不承受主要负荷的垫铁组，只使用平垫铁和一块斜垫铁即可；②承受主要负荷的垫铁组，应使用成对斜垫铁，找平后用点焊焊牢；③承受主要负荷且在设备运行时产生较强连续振动时，垫铁组不能采用斜垫铁，只能采用平垫铁。每组垫铁总数一般不得超过5块，并将各垫铁焊牢。在垫铁组中，厚垫铁放在下面，薄垫铁放在上面，最薄的安放在中间，且不宜小于2mm，以免发生翘曲变形。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]