[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-901866":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},901866,583,2,"多选题","(2017年)依据《通用安装工程工程量计算规范》(GB50856-2013)，措施项目清单中，关于高层施工增加的规定，正确的表述有()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单层建筑物檐口高度超过20m应分别列项",true,{"key":16,"text":17,"correct":18},"B","多层建筑物超过8层时，应分别列项",false,{"key":20,"text":21,"correct":14},"C","突出主体建筑物顶的电梯机房、水箱间、排烟机房等不计入檐口高度",{"key":23,"text":24,"correct":14},"D","计算层数时，地下室不计入层数","ACD","(10）高层施工增加： 高层施工引起的人工工效降低以及由于人工工效降低引起的机械降效；通信联络设备的使用。 1) 单层建筑物檐口高度超过20m， 多层建筑物超过6层时， 应分别列项。 2）突出主体建筑物顶的电梯机房、楼梯出口间、水箱间、瞭望塔、排烟机房等不计入檐口高度。计算层数时， 地下室不计入层数。",{"id":6,"name":28,"category":29,"favorite":30},"建设工程技术与计量（安装)","建筑工程",0]